Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Burford, N K and Smith, F W (1999) Developing a new military shelter system: a technical study in advanced materials and structures. Building Research & Information, 27(02), 64–83.

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.

Horne, M, Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(02), 96–108.

Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2019) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.

Hyung, W, Kim, S and Jo, J (2019) Improved similarity measure in case-based reasoning: a case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561–78.

Johari, S and Jha, K N (2019) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(02), 84–95.

Li, X, Wang, X and Lei, L (2019) The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356–84.

Mellado, F, Lou, E C and Becerra, C L C (2019) Synthesising performance in the construction industry. Engineering, Construction and Architectural Management, 27(02), 579–608.

Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.

Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2019) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.

Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: a comparative investigation. Building Research & Information, 27(02), 109–19.

  • Type: Journal Article
  • Keywords: concrete; contractor; Europe; formwork; planning
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=taf1f1mhetf8gg4r
  • Abstract:
    Results of an investigation concerning preferred methods of construction formwork by contractors' planning engineers in France, Germany and the UK are presented. Findings confirm differences amongst preferred solutions in these international locations. French and German contractors tend to employ similar proprietary formwork methods, whilst the UK 'standalone' in preferring traditional timber solutions. It is found that company size has no significant impact on the formwork system selected. Nine formwork selection factors are identified, and ranked in terms of importance for each international group of contractors. Statistically, the rankings are shown to have significant correlation for each pair of countries. 'Relative costs', 'Specification (quality) of concrete' and 'Degree of repetition', are found to be the principal formwork selection criteria. Correlation analysis reveals association between many of these selection factors.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.

Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.

Salvado, F, Almeida, N and Vale e Azevedo, A (2019) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441–57.

van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.

Wang, X, Shi, L, Wang, B and Kan, M (2019) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483–501.

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.

Wei, H, Minggang, H and Qun, H (1999) Quasi-static testing of composite masonry construction. Building Research & Information, 27(02), 120–3.

Yevu, S K and Yu, A T W (2019) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.

Zarghami, S A and Gunawan, I (2019) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.

Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2019) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458–82.

Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2019) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.