Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 31 results ...
Ahmadi, S Y; Lather, J I; Wittich, C E; Madson, K (2025) Current and future trends for resilient inland waterway transportation systems during flood disruptions. Journal of Construction Engineering and Management, 151(6).
Chammout, B; El-Adaway, I H (2025) Circular economy in construction: Decision-making factors and future research avenues. Journal of Construction Engineering and Management, 151(6).
Chen, G; Yan, Z; Hao, Y; Li, Q; Tian, Y (2025) BIM value creation through collaboration in construction projects: An empirical model with multiple collaborative behaviors. Journal of Construction Engineering and Management, 151(6).
Ejidike, C C; Mewomo, M C; Olawumi, T O; Wang, S; Buniya, M K (2025) Barriers to the adoption of smart building technology in developing countries: An empirical survey. Journal of Construction Engineering and Management, 151(6).
Ghosh, B; Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6).
Guha, P; Kar, S; Jha, K N (2025) A framework to assess leadership quality of construction leaders. Journal of Construction Engineering and Management, 151(6).
Jin, H; Chan, M; Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6).
Karam, A H (2003) Marketing and architects in South Africa. Engineering, Construction and Architectural Management, 10(6), 402–12.
Liao, L; Gan, C; Yang, J; Liang, Y (2025) Impacts of safety capacity and personalized safety training on construction workers' hazard recognition using eye-tracking technology. Journal of Construction Engineering and Management, 151(6).
Ling, F Y Y; Sim, W X L (2025) Mediating role of vocational interest in the relationship between personality and job satisfaction: Insights from cost engineers. Journal of Construction Engineering and Management, 151(6).
Liu, J; Li, J; Guo, D; Cui, Q; Yang, L; Wu, H (2025) Reliability evaluation of a shield tunnel waterproofing system in the life cycle stage based on a combination weighting method and cloud model. Journal of Construction Engineering and Management, 151(6).
Liu, J; Li, W; Li, F; Zhao, X (2025) Chinese named entity recognition for bridge damage and defects based on text mining and natural language pretraining models. Journal of Construction Engineering and Management, 151(6).
Müller, C C; Elzomor, M (2025) Fostering a sustainable built environment by preparing a construction engineering workforce with sustainability key performance indicators. Journal of Construction Engineering and Management, 151(6).
Mehdipoor, A; Iordanova, I; Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6).
Mohammadi, P; Asgari, S; Rashidi, A; Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6).
Mollaei, A; Bachmann, C; Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6).
Palaneeswaran, E, Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), 418–31.
Radzi, A R; Azmi, N F; Kamaruzzaman, S N; Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6).
Salary, S; Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6).
Salem, M; Abdullah, M S; Islam, M S; Said, S O (2025) Subcontractors' BIM deployment in large-scale construction projects in the mena region. Journal of Construction Engineering and Management, 151(6).
Shehadeh, A; Alshboul, O; Tamimi, M (2025) Quantitative analysis of climate-adaptive pavement technologies: Mitigating environmental impact and enhancing economic viability in urban infrastructure. Journal of Construction Engineering and Management, 151(6).
Shin, Y J; Farrokh, E; Jung, J; Kang, H (2025) Optimizing tunnel boring machine operations in real time within defined constraints. Journal of Construction Engineering and Management, 151(6).
Sun, J; Murphy, M R; Hazlett, D G; Shuai, C; Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6).
Utkucu, D; Sözer, H (2025) Modeling a mixed-mode cooling system with correlation to operable building facade openings: Mathematical logic integration of computational fluid dynamics and energy models. Journal of Construction Engineering and Management, 151(6).
Wang, P; Wang, K; Huang, Y; Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6).
Wang, R; Gong, D (2025) Abnormal behavior recognition algorithm in small sample scenarios for a utility tunnel project based on dcgan. Journal of Construction Engineering and Management, 151(6).
Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P; Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6).
- Type: Journal Article
- Keywords: double-shield tunnel boring machine; field data; full-scale test; segment structure; subway tunnel; timoshenko beam
- ISBN/ISSN: 0733-9364
- URL: https://doi.org/10.1061/JCEMD4.COENG-16227
- Abstract:
During double-shield tunnel boring machine (DS-TBM) excavation of urban subway tunnels, backfilling with pea gravel and grouting is usually performed behind segment wall linings. However, insufficient pea gravel backfill and delayed grouting compromise segment stability, leading to issues such as dislocation, damage, and groundwater leakage. This study developed a simplified cantilever-Type Timoshenko beam model to analyze segment stresses during DS-TBM construction. Numerical solutions for the deflection and internal forces of the tunnel structure were obtained using the finite-difference method. An experimental evaluation was performed to assess stress variations in segments during construction. Theoretical results were then compared with field data indicating that the model slightly underestimated the observed segment settlements. Subsequent optimization of the model suggests adjustments to account for plastic-stage tunnel deformation and construction-related disturbances. The optimal correction coefficient values were determined as follows: kc=0.85 (longitudinal stress), kl=0.91 (axial stress), and ks=1.0 (radial stress). Field tests identified three stress variation stages in segments: (1) inadequate pea gravel backfill, (2) full pea gravel backfill (pre-grouting), and (3) post-grouting with the second stage contributing most to settlement. Consequently, practical recommendations include improving the pea gravel backfill quality and adopting advanced and stepwise grouting techniques to control segment settlements. The primary contribution of this study lies in its focus on stress and stability control of segmental tunnels during the construction of DS-TBM. This research offers detailed recommendations and strategies aimed at enhancing segment stability, emphasizing the importance of engineering construction and site management. In addition, it provides valuable insights to advance the technology associated with DS-TBM tunnel construction.
Yao, Z; Chen, Z; Lee, Y (2025) A construction site layout planning study for dust reduction. Journal of Construction Engineering and Management, 151(6).
Zhan, H; Hwang, B G; Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6).
Zhang, M; Liu, X; Li, Y (2025) Identity-based proactive human intrusion management in hazardous areas at construction sites: A deep learning-based method. Journal of Construction Engineering and Management, 151(6).
Zong, Z; Su, S; Diao, L; Ou, Y; Long, T (2025) Relationship between perceived occupational stigma and safety behavior of construction workers: Moderated mediation model. Journal of Construction Engineering and Management, 151(6).