Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 31 results ...

Ahmadi, S Y; Lather, J I; Wittich, C E; Madson, K (2025) Current and future trends for resilient inland waterway transportation systems during flood disruptions. Journal of Construction Engineering and Management, 151(6).

Chammout, B; El-Adaway, I H (2025) Circular economy in construction: Decision-making factors and future research avenues. Journal of Construction Engineering and Management, 151(6).

Chen, G; Yan, Z; Hao, Y; Li, Q; Tian, Y (2025) BIM value creation through collaboration in construction projects: An empirical model with multiple collaborative behaviors. Journal of Construction Engineering and Management, 151(6).

Ejidike, C C; Mewomo, M C; Olawumi, T O; Wang, S; Buniya, M K (2025) Barriers to the adoption of smart building technology in developing countries: An empirical survey. Journal of Construction Engineering and Management, 151(6).

Ghosh, B; Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6).

Guha, P; Kar, S; Jha, K N (2025) A framework to assess leadership quality of construction leaders. Journal of Construction Engineering and Management, 151(6).

Jin, H; Chan, M; Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6).

Karam, A H (2003) Marketing and architects in South Africa. Engineering, Construction and Architectural Management, 10(6), 402–12.

Liao, L; Gan, C; Yang, J; Liang, Y (2025) Impacts of safety capacity and personalized safety training on construction workers' hazard recognition using eye-tracking technology. Journal of Construction Engineering and Management, 151(6).

Ling, F Y Y; Sim, W X L (2025) Mediating role of vocational interest in the relationship between personality and job satisfaction: Insights from cost engineers. Journal of Construction Engineering and Management, 151(6).

Liu, J; Li, J; Guo, D; Cui, Q; Yang, L; Wu, H (2025) Reliability evaluation of a shield tunnel waterproofing system in the life cycle stage based on a combination weighting method and cloud model. Journal of Construction Engineering and Management, 151(6).

  • Type: Journal Article
  • Keywords: cloud model; combination weighting method; reliability evaluation; shield tunnel; waterproofing system
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/JCEMD4.COENG-16070
  • Abstract:
    To solve the fuzziness and randomness existing in the reliability evaluation of the waterproof reliability of the tunnel in the life cycle stage, the reliability evaluation grade standard and a new reliability evaluation model of shield tunnel waterproofing system based on a combination weighting method and cloud model are proposed. After comprehensive consideration of the characteristics of the shield tunnel waterproofing system, an evaluation index system of shield tunnel waterproofing reliability in the life cycle stage is established that consists of five primary indexes and 20 secondary indexes. The subjective and objective weights of evaluation indexes are calculated by using the improved analytic hierarchy process (AHP) and the improved criteria importance through intercriteria correlation method (CRITIC) method, respectively. The combination weights are calculated by game theory, ensuring the rationality of the weights of evaluation indexes. Cloud model theory is introduced to solve the fuzzy and randomness in the reliability evaluation process of shield tunnel waterproofing systems in the life cycle stage, ensuring the accuracy of the evaluation results. To verify the applicability of the proposed approach, it was applied to the reliability evaluation of the shield tunnel waterproofing system in the Nanjing Yangtze River. The evaluation result is V, which belongs to high reliability. The evaluation results are consistent with the actual situation, so the accuracy and adaptability of the model are verified. Thus, the proposed approach can be feasibly used in applications and can guide other similar projects.

Liu, J; Li, W; Li, F; Zhao, X (2025) Chinese named entity recognition for bridge damage and defects based on text mining and natural language pretraining models. Journal of Construction Engineering and Management, 151(6).

Müller, C C; Elzomor, M (2025) Fostering a sustainable built environment by preparing a construction engineering workforce with sustainability key performance indicators. Journal of Construction Engineering and Management, 151(6).

Mehdipoor, A; Iordanova, I; Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6).

Mohammadi, P; Asgari, S; Rashidi, A; Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6).

Mollaei, A; Bachmann, C; Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6).

Palaneeswaran, E, Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), 418–31.

Radzi, A R; Azmi, N F; Kamaruzzaman, S N; Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6).

Salary, S; Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6).

Salem, M; Abdullah, M S; Islam, M S; Said, S O (2025) Subcontractors' BIM deployment in large-scale construction projects in the mena region. Journal of Construction Engineering and Management, 151(6).

Shehadeh, A; Alshboul, O; Tamimi, M (2025) Quantitative analysis of climate-adaptive pavement technologies: Mitigating environmental impact and enhancing economic viability in urban infrastructure. Journal of Construction Engineering and Management, 151(6).

Shin, Y J; Farrokh, E; Jung, J; Kang, H (2025) Optimizing tunnel boring machine operations in real time within defined constraints. Journal of Construction Engineering and Management, 151(6).

Sun, J; Murphy, M R; Hazlett, D G; Shuai, C; Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6).

Utkucu, D; Sözer, H (2025) Modeling a mixed-mode cooling system with correlation to operable building facade openings: Mathematical logic integration of computational fluid dynamics and energy models. Journal of Construction Engineering and Management, 151(6).

Wang, P; Wang, K; Huang, Y; Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6).

Wang, R; Gong, D (2025) Abnormal behavior recognition algorithm in small sample scenarios for a utility tunnel project based on dcgan. Journal of Construction Engineering and Management, 151(6).

Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P; Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6).

Yao, Z; Chen, Z; Lee, Y (2025) A construction site layout planning study for dust reduction. Journal of Construction Engineering and Management, 151(6).

Zhan, H; Hwang, B G; Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6).

Zhang, M; Liu, X; Li, Y (2025) Identity-based proactive human intrusion management in hazardous areas at construction sites: A deep learning-based method. Journal of Construction Engineering and Management, 151(6).

Zong, Z; Su, S; Diao, L; Ou, Y; Long, T (2025) Relationship between perceived occupational stigma and safety behavior of construction workers: Moderated mediation model. Journal of Construction Engineering and Management, 151(6).