Abdelkhalek, S; Zayed, T; Eltoukhy, A E E (2025) Multifaceted optimization for bridge inspection process. Journal of Construction Engineering and Management, 151(5).

Afolabi, A; Yusuf, A; Akanmu, A (2025) Effect of a passive shoulder-support exoskeleton on muscle activity, range of motion, discomfort, and exertion during painting tasks. Journal of Construction Engineering and Management, 151(5).

Ahmed, K; Leung, M Y; Yang, W; Manu, P (2025) Moderating effects of coping behaviors on stressor-stress relationships of ethnic minority construction workers. Journal of Construction Engineering and Management, 151(5).

Bhattacharjee, K; Bugalia, N; Mahalingam, A (2025) Differences in pathways to resilient safety culture for construction projects of different sizes. Journal of Construction Engineering and Management, 151(5).

Chen, Z; Li, T; Qin, L; Jiang, Y (2025) Vision-guided autonomous block loading in a dual-robot collaborative handling framework. Journal of Construction Engineering and Management, 151(5).

Cuervo, J C and Pheng, L S (2003) Significance of location factors for Singapore transnational construction corporations. Engineering, Construction and Architectural Management, 10(5), 342–53.

Fares, A; Elazouni, A; Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5).

Fernández, A I; Jarufe, J; Segarra, P; Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/JCEMD4.COENG-15323
  • Abstract:
    Currently, in massive underground mining (MUM) many processes lack standardized methodologies for effective resource and time management. One such area is construction planning, which involves multiple time horizons and complex interactions between variables and activities. In recent years, methodologies rooted in lean philosophies have been applied to improve process control and compliance in MUM, but they often face difficulties to address site-specific constraints and intertemporal dependencies. Inadequate management of these factors can lead to significant project delays, consequently affecting production milestones. To address this gap, this paper introduces a planning methodology based in a central management system called Last Planner System (LPS) and continuous improvement tools (CIT), aimed to generate an improvement in the reliability of the processes led by the planning area. Action research (AR) is applied to evaluate existing practices for similar projects, implement the methodology, reflect upon and analyze the results, and develop guidelines for the methodology's reproducibility. The project assessed is a MUM operation in its initial construction stage characterized by specific operational constraints and constant deviations to the programming. The proposed methodology advanced project commissioning by three months, enabling the completion of all activities scheduled in the master plan's milestones and promoting operational continuity. Performance metrics validate the methodology's effectiveness, with limitations and confounding factors discussed. The methodology offers several benefits to the organization, including a traceable master plan (MP), the collaborative planning of operational constraints, and a dynamic visual monitoring of key project metrics.

Hong, W T; Whyte, J; Xue, J (2025) A natural language processing-driven framework for policymaking in infrastructure development. Journal of Construction Engineering and Management, 151(5).

Lee, D; Han, K (2025) Autonomous navigation and positioning of a real-time and automated mobile robotic welding system. Journal of Construction Engineering and Management, 151(5).

Sciulli, G; Rizzo, P; Kurlander, J; Brozik, B (2025) A comparative analysis of three methodological frameworks for bridge asset management. Journal of Construction Engineering and Management, 151(5).

Shehadeh, A; Alshboul, O (2025) Game theory integration in construction management: A comprehensive approach to cost, risk, and coordination under uncertainty. Journal of Construction Engineering and Management, 151(5).

Thiruvenghadam, T S; Prakash, A (2025) Emerging paradigms and practices in construction equipment management. Journal of Construction Engineering and Management, 151(5).

Umair, M; Seo, J; Luo, Y; Ahn, C R (2025) Investigating the impact of virtual reality accident experience on construction workers' risk habituation through individual behaviors. Journal of Construction Engineering and Management, 151(5).

Uthai, T; Zhou, T; Ye, Y; You, H; Du, J (2025) Haptics-based robot teleoperation for soft object manipulation. Journal of Construction Engineering and Management, 151(5).

Wang, M; Yao, G; Yang, Y; Li, R; Deng, R (2025) A decision support tool for dust prevention and control in construction. Journal of Construction Engineering and Management, 151(5).

Xia, N; Ding, S; Zhai, F; Xia, M (2025) Sharing psychological safety climate at the group level among construction workers: The roles of group identification and interactional justice. Journal of Construction Engineering and Management, 151(5).

Yllmaz, M; Dede, T (2025) Optimizing multiobjective time-cost-quality problems in construction projects: Efficacy of strength Pareto-based rao algorithms. Journal of Construction Engineering and Management, 151(5).

Zhou, Y; Liu, J; Pu, X; Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5).