Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 18 results ...
Baker, M; Ali, M; Hassett, E; Jahan Tumpa, R (2025) Tapping the untapped resource to address construction skills shortages: Perceptions of Australian women career changers and construction women. Journal of Construction Engineering and Management, 151(4).
Chang, W C; Esmaeili, B; Hasanzadeh, S (2025) Impacts of physical and informational failures on worker-autonomy trust in future construction. Journal of Construction Engineering and Management, 151(4).
Charbel, G; Assaad, R H; Tejada, T R; Karaa, F (2025) Modeling the interdependencies between the risk factors contributing to preconstruction delays in construction projects. Journal of Construction Engineering and Management, 151(4).
Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q; Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4).
Dou, Y; Zhong, L; Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4).
He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S; Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4).
Jiang, Z; Han, Y; Cheng, Y; Wang, Z; Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4).
Lin, S; Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4).
Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y; Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4).
Mai, T P A; Doan, D T; Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4).
Onubi, H O; Carpio, M (2025) Voluntary workplace proenvironmental behavior on construction project sites: Antecedent roles of green human resource management practices, environmental awareness, and job control. Journal of Construction Engineering and Management, 151(4).
Sharma, N; Laishram, B (2025) Decoding the emergent patterns of cost of quality through the lens of sociotechnical systems: A bibliometric analysis. Journal of Construction Engineering and Management, 151(4).
Shrestha, R; Ko, T; Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4).
Sun, R; Yan, Q; Zhang, C; Qiao, M; Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4).
Tao, Y; Hu, H; Xu, F; Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4).
Wang, H; Chen, X; Wang, J; Guan, W; Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4).
Yan, H; Liu, C; Yang, X; Feng, K (2025) Real-time digital twin-driven 3D near-miss detection system at construction sites. Journal of Construction Engineering and Management, 151(4).
Yu, M; Ruan, W; Zhou, Y; Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4).
- Type: Journal Article
- Keywords: buffer constraints; hybrid flow shop; parallel-machine scheduling; prefabricated components production
- ISBN/ISSN: 0733-9364
- URL: https://doi.org/10.1061/JCEMD4.COENG-15909
- Abstract:
This study introduces a novel scheduling approach to enhance the efficiency of prefabricated component production by integrating parallel equipment scheduling with intra- and inter-process constraints. It employs a homogeneous parallel equipment setup to maximize the productivity of individual production lines. The model further accounts for limited buffer spaces and prefabricated components' release times. Additionally, it incorporates factors such as the expiration of release agents and concrete setting times, which are crucial for the practical application of the scheduling strategy. A numerical analysis, informed by a case study from a prefabricated factory in Shenyang, China, demonstrates that this approach substantially reduces production time. Specifically, the proposed scheduling strategy results in a 26.47% reduction in total time compared to traditional manual scheduling, with the incorporation of multiple buffer constraints improving the accuracy of scheduling predictions. The model addresses the impact of multiple production constraints on productivity to formulate more precise scheduling plans for prefabricated component production across diverse production environments.