Baker, M; Ali, M; Hassett, E; Jahan Tumpa, R (2025) Tapping the untapped resource to address construction skills shortages: Perceptions of Australian women career changers and construction women. Journal of Construction Engineering and Management, 151(4).

Chang, W C; Esmaeili, B; Hasanzadeh, S (2025) Impacts of physical and informational failures on worker-autonomy trust in future construction. Journal of Construction Engineering and Management, 151(4).

Charbel, G; Assaad, R H; Tejada, T R; Karaa, F (2025) Modeling the interdependencies between the risk factors contributing to preconstruction delays in construction projects. Journal of Construction Engineering and Management, 151(4).

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q; Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4).

Dou, Y; Zhong, L; Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4).

He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S; Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4).

Jiang, Z; Han, Y; Cheng, Y; Wang, Z; Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4).

Lin, S; Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4).

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y; Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4).

Mai, T P A; Doan, D T; Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4).

Onubi, H O; Carpio, M (2025) Voluntary workplace proenvironmental behavior on construction project sites: Antecedent roles of green human resource management practices, environmental awareness, and job control. Journal of Construction Engineering and Management, 151(4).

Sharma, N; Laishram, B (2025) Decoding the emergent patterns of cost of quality through the lens of sociotechnical systems: A bibliometric analysis. Journal of Construction Engineering and Management, 151(4).

  • Type: Journal Article
  • Keywords: bibliometric; construction industry; cost of quality; issues; quality management
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/JCEMD4.COENG-15023
  • Abstract:
    In the construction industry, projects are characterized by their unique attributes and complex nature, giving rise to substantial issues in attaining high-quality standards. Such issues emanate from the intrinsic complexities and dynamic characteristics of quality management (QM) processes. Ineffectively quantifying QM issues such as rework can lead to additional costs and time delays, highlighting the importance of effective QM methods such as cost of quality (COQ). Even though there is a plethora of information available on COQ within the manufacturing industry, the construction industry has been relatively slow in adopting effective COQ due to its dynamic nature. In order to implement COQ into the construction industry, an organizational analysis of the current state of COQ is required. To gain a deeper understanding of the emergent patterns of COQ in the construction industry, it is imperative to perform a comprehensive and systematic review utilizing the sociotechnical system (STS) theory. This theory explains how the alignment between social and technological systems of COQ, as well as external demands, can influence organizational performance. Therefore, a bibliometric review was carried out utilizing 57 peer-reviewed papers that were obtained from the Scopus, Web of Science (WOS), and EBSCOhost databases. The present study utilizes various tools, including VOSviewer, Mendeley, and Excel, to facilitate bibliometric analysis and categorize clusters/patterns under technical and social themes. The most identified clusters using the VOSviewer were (1) COQ, (2) PAF (prevention-Appraisal-failure), (3) top management, (4) training, (5) motivation, and (6) rework. This study offers valuable insights to both researchers and industry practitioners with regard to the current patterns of COQ in the construction industry, enabling them to devise effective strategies for the optimum cost and quality through the utilization of the framework. To this end, the study recommends the involvement of top management in training programs and motivation initiatives. By doing so, organizations can take proactive measures to enhance their cost management strategies, thus improving their overall performance.

Shrestha, R; Ko, T; Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4).

Sun, R; Yan, Q; Zhang, C; Qiao, M; Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4).

Tao, Y; Hu, H; Xu, F; Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4).

Wang, H; Chen, X; Wang, J; Guan, W; Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4).

Yan, H; Liu, C; Yang, X; Feng, K (2025) Real-time digital twin-driven 3D near-miss detection system at construction sites. Journal of Construction Engineering and Management, 151(4).

Yu, M; Ruan, W; Zhou, Y; Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4).