Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Abdullahi, U, Bustani, S A, Hassan, A and Rotimi, F E (2019) Assessing quality management practice in Nigerian construction industry. Journal of Construction Business and Management, 3(2), 17-25.

Ajayi, O O, Koleoso, H, Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in southwestern Nigeria. Journal of Construction Business and Management, 3(2), 26-34.

Akinwale, A A and Olusanya, O A (2020) Influence of subcontracting processes on wages and workloads in the building construction industry in Nigeria. Journal of Construction Business and Management, 4(2), 1-10.

Alade, K, Oyebade, A and Nzewi, N (2018) Assessment of the use of locally available materials for building construction in Ado-Ekiti, Nigeria. Journal of Construction Business and Management, 2(2), 36-41.

Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: practices and challenges. Journal of Construction Business and Management, 1(2), 47-54.

Amoo, O, Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in Eastern Cape South Africa: A case study. Journal of Construction Business and Management, 5(2), 54-67.

Dada, J O (2018) A career path framework for quantity surveyors in Nigeria private practice. Journal of Construction Business and Management, 2(2), 15-23.

Danku, J C (2020) Exploring the concept of social licence in the construction industry of a developing country. Journal of Construction Business and Management, 4(2), 25-33.

Dosumu, O, Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), 11-23.

Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (AAC) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), 1-10.

Leo-olagbaye, F and Odeyinka, H A (2018) Evaluation of risk factors and their impact on road projects. Journal of Construction Business and Management, 2(2), 24-35.

Lowe, J (2023) Technical and organisational change in UK construction. Journal of Construction Business and Management, 6(2), 50-61.

Manchidi, T E and Rwelamila, P D (2019) A state legitimation approach of reserved built environment professional work: A case for South Africa – part 1. Journal of Construction Business and Management, 3(2), 35-48.

Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), 11-24.

Nkeleme, E I, Mbamali, I and Shakantu, W (2022) A measure of combustion-generated pollutants in university laboratories and their effects on the indoor air quality. Journal of Construction Business and Management, 5(2), 44-53.

Nyakala, S, Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), 46-54.

Ogbu, C P (2017) Building quality condition and maintenance cost: the case of public low income housing in Abia Sate, Nigeria. Journal of Construction Business and Management, 1(2), 24-34.

Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of sme contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), 1-16.

Ogunseiju, O, Odeyinka, H A and Yusuf, A O (2023) Usage of building information modelling in quantity surveying firms in Nigeria. Journal of Construction Business and Management, 6(2), 27-37.

Okoro, C S and Musonda, I (2017) Establishing underlying structures of safety performance measures using factor analysis of data on construction workers in Gauteng, South Africa. Journal of Construction Business and Management, 1(2), 55-64.

Oladokun, T T and Komolafe, M O (2017) Drivers of rural housing development in Edo State, Nigeria. Journal of Construction Business and Management, 1(2), 35-46.

Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), 1-14.

Omollo, W O (2019) Barriers to the effective regulation of the building construction industry: An empirical analysis. Journal of Construction Business and Management, 3(2), 49-58.

Onungwa, I O and Uduma-Olugu, N (2017) Building information modelling and collaboration in the Nigerian construction industry. Journal of Construction Business and Management, 1(2), 1-10.

Opawole, A, Alao, O O, Yusuf, A O, Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos State, Nigeria. Journal of Construction Business and Management, 5(2), 1-19.

Rambaruth, A, Adam, J K and Krishna, S B N (2022) Contributing elements and issues to strategic management in the construction industry among small and medium enterprises: A case study in South Africa's Ethekwini region. Journal of Construction Business and Management, 5(2), 20-8.

Renault, B Y, Agumba, J N and Ansary, N (2020) Correlation analysis between risk measurement and project success of small and medium contractors in gauteng, South Africa. Journal of Construction Business and Management, 4(2), 34-45.

Ssenyange, K and Kudakwashe, C (2023) The impact of leadership styles on government construction project success: A structural equation modeling approach. Journal of Construction Business and Management, 6(2), 11-26.

Taofeeq, D M and Adeleke, A Q (2019) Factor's influencing contractors risk attitude in the Malaysian construction industry. Journal of Construction Business and Management, 3(2), 59-67.

Tiew, S Y, Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), 29-43.

Verwey, J, Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors’ conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), 38-49.

Windapo, A, Moghayedi, A, Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), 42-50.

  • Type: Journal Article
  • Keywords: case study; cement; cost; electrical installation; reinforcement; specialist sub-contractor
  • ISBN/ISSN: 2521-0165
  • URL: https://journals.uct.ac.za/index.php/jcbm/article/view/573
  • Abstract:

    This study examines the components of construction projects and whether there are construction resources that are the key project constituents. The rationale for the study stems from the unexplained assumptions regarding the primary components responsible for increases in construction costs in South Africa, as South Africa lacks a national building cost database. The study adopts a qualitative research approach that employs a case studies of six new and six refurbished projects in obtaining the necessary data for use in answering the study objectives. The study found that the primary cost constituents of construction projects are materials and sub-contracted work, accounting for 64% and 75% of the value of renovation and new construction work respectively and on the average, the major materials by value are reinforcement, cement and filling, while electrical Installation is the primary sub-contracting item by value. Based on these findings, the study concludes that the future levels of construction work can be predicted knowing levels of specialist sub-contractor costs and building material costs. The study recommends that the sub-contractor and material inputs into construction projects are carefully managed, both on the projects and the construction industry, to limit construction cost increases and cost overruns on projects. The study contributes to the literature on resource planning and control in construction.