Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 41 results ...

Abdirad, H and Dossick, C S (2019) Normative and descriptive models for COBie implementation: discrepancies and limitations. Engineering, Construction and Architectural Management, 26(08), 1820–36.

Almarri, K, Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(08), 1696–711.

Almeida, L, Tam, V W, Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: a green and non-green building comparison. Engineering, Construction and Architectural Management, 27(08), 1939–62.

Anson, M, Ying, K T and Siu, M F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(08), 1672–95.

Antwi-Afari, M F, Li, H, Wong, J K, Oladinrin, O T, Ge, J X, Seo, J and Wong, A Y L (2019) Sensing and warning-based technology applications to improve occupational health and safety in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1534–52.

Au-Yong, C P, Chua, S J L, Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(08), 1593–607.

Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(08), 1777–800.

Gao, J, Ren, H, Ma, X, Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(08), 1652–71.

Habibi, M and Kermanshachi, S (2018) Phase-based analysis of key cost and schedule performance causes and preventive strategies. Engineering, Construction and Architectural Management, 25(08), 1009–33.

He, Q, Wang, T, Chan, A P, Li, H and Chen, Y (2019) Identifying the gaps in project success research. Engineering, Construction and Architectural Management, 26(08), 1553–73.

Hilali, A, Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(08), 1574–92.

Hopkin, T, Lu, S, Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research. Engineering, Construction and Architectural Management, 26(08), 1608–24.

Hu, W, Dong, J, Hwang, B, Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(08), 2079–105.

Jacob, J and Varghese, K (2018) A framework for ad hoc information management for the building design process. Engineering, Construction and Architectural Management, 25(08), 1034–52.

Jacobsson, M and Merschbrock, C (2018) BIM coordinators: a review. Engineering, Construction and Architectural Management, 25(08), 989–1008.

Jeelani, I, Han, K and Albert, A (2020) Development of virtual reality and stereo-panoramic environments for construction safety training. Engineering, Construction and Architectural Management, 27(08), 1853–76.

Ji, Y, Qi, K, Qi, Y, Li, Y, Li, H X, Lei, Z and Liu, Y (2020) BIM-based life-cycle environmental assessment of prefabricated buildings. Engineering, Construction and Architectural Management, 27(08), 1703–25.

Jin, R, Zou, Y, Gidado, K, Ashton, P and Painting, N (2019) Scientometric analysis of BIM-based research in construction engineering and management. Engineering, Construction and Architectural Management, 26(08), 1750–76.

Li, H X, Ma, Z, Liu, H, Wang, J, Al-Hussein, M and Mills, A (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management, 27(08), 1679–702.

Li, Q, Sun, Q, Tao, S and Gao, X (2019) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(08), 2023–45.

Li, X, Li, J, Zhang, X, Gao, J and Zhang, C (2020) Simplified analysis of cable-stayed bridges with longitudinal viscous dampers. Engineering, Construction and Architectural Management, 27(08), 1993–2022.

Liang, R and Chong, H (2019) A hybrid group decision model for green supplier selection: a case study of megaprojects. Engineering, Construction and Architectural Management, 26(08), 1712–34.

Lu, H, Qi, J, Li, J, Xie, Y, Xu, G and Wang, H (2020) Multi-agent based safety computational experiment system for shield tunneling projects. Engineering, Construction and Architectural Management, 27(08), 1963–91.

Meng, J, Yan, J, Xue, B, Fu, J and He, N (2018) Reducing construction material cost by optimizing buy-in decision that accounts the flexibility of non-critical activities. Engineering, Construction and Architectural Management, 25(08), 1092–108.

Meng, Q, Zhang, Y, Li, Z, Shi, W, Wang, J, Sun, Y, Xu, L and Wang, X (2020) A review of integrated applications of BIM and related technologies in whole building life cycle. Engineering, Construction and Architectural Management, 27(08), 1647–77.

Murillo, K P, Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(08), 1801–19.

Park, E, Kwon, S J and Han, J (2019) Antecedents of the adoption of building information modeling technology in Korea. Engineering, Construction and Architectural Management, 26(08), 1735–49.

Rajagopalan, G (2019) Durability of alumina silicate concrete based on slag/fly ash blends against corrosion. Engineering, Construction and Architectural Management, 26(08), 1641–51.

  • Type: Journal Article
  • Keywords: Technology; Process; Construction; Engineering; Experimental studies;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-08-2018-0345
  • Abstract:
    The durability of concrete structures, especially built-in corrosive environments, starts to deteriorate after 20–30 years, even though they have been designed for more than 60 years of service life. The durability of concrete depends on its resistance against a corrosive environment. Inorganic Polymer concrete, or geopolymer concrete, has been emerging as a new engineering material with the potential to form an alternative to conventional concrete for the construction industry. The purpose of this paper is to conduct the investigation on corrosion of the geopolymer materials prepared using GGBS blended with low calcium fly ash in different percentages and sodium hydroxide, sodium silicate as activators and cured in ambient conditions (25±5°C). Design/methodology/approach GGBS was replaced by fly ash at different levels from 0 to 50 percent in a constant concentration of 12M. The main parameters of this study are the evaluation of strength characteristics of geopolymer concrete and resistance against corrosion by conducting accelerated corrosion test (Florida method). Findings From the test results it is observed that the strength of the geopolymer concrete with GGBS in ambient curing performs well compared to geopolymer concrete with GGBS blended with fly ash. The GPCE sample (40 percent replacement of fly ash to GGBS) shows better results and the resistance against corrosion was good, compared to all other mixes. Research limitations/implications The outcomes of this investigation will be useful for the researchers and the construction industry. Practical implications This paper results that optimum percentage of fly ash should be blended with GGBS against the corrosion attack. This investigation indicates that GGBS without the combination of fly ash can be utilized in a normal environment. These findings will definitely be useful for the ready-mix concrete manufacturers and the construction Industry. Social implications Disposal of industrial wastes causes pollution to the environment. Industrial wastes are utilized for the production of geopolymer concrete, which is the alternative material for the construction industry. Originality/value From the observation of the previous literature, till now there was no investigation on geopolymer concrete for corrosion under ambient curing conditions, as such this investigation could be considered as the new investigation.

Rohani, M, Shafabakhsh, G, Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(08), 1053–74.

Sawan, R, Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(08), 974–88.

Sepasgozar, S M, Davis, S, Loosemore, M and Bernold, L (2018) An investigation of modern building equipment technology adoption in the Australian construction industry. Engineering, Construction and Architectural Management, 25(08), 1075–91.

Silverio-Fernandez, M A, Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1625–40.

Stride, M, Hon, C K, Liu, R and Xia, B (2020) The use of building information modelling by quantity surveyors in facilities management roles. Engineering, Construction and Architectural Management, 27(08), 1795–812.

Tang, L, Griffith, L, Stevens, M and Hardie, M (2020) Social media analytics in the construction industry comparison study between China and the United States. Engineering, Construction and Architectural Management, 27(08), 1877–89.

Wu, H, Shen, G, Lin, X, Li, M, Zhang, B and Li, C Z (2020) Screening patents of ICT in construction using deep learning and NLP techniques. Engineering, Construction and Architectural Management, 27(08), 1891–912.

Xie, X, Lu, Q, Rodenas-Herraiz, D, Parlikad, A K and Schooling, J M (2020) Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance. Engineering, Construction and Architectural Management, 27(08), 1835–52.

Xu, M, Mei, Z, Luo, S and Tan, Y (2020) Optimization algorithms for construction site layout planning: a systematic literature review. Engineering, Construction and Architectural Management, 27(08), 1913–38.

Xu, W and Wang, T (2020) Dynamic safety prewarning mechanism of human–machine–environment using computer vision. Engineering, Construction and Architectural Management, 27(08), 1813–33.

Xu, Z, Wang, X, Xiao, Y and Yuan, J (2020) Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method. Engineering, Construction and Architectural Management, 27(08), 1763–94.

Yuan, J, Li, X, Ke, Y, Xu, W and Xu, Z (2020) Developing a building information modeling–based performance management system for public–private partnerships. Engineering, Construction and Architectural Management, 27(08), 1727–62.

Zhang, J, Ouyang, Y, Li, H, Ballesteros-Pérez, P and Skitmore, M (2020) Simulation analysis of incentives on employees' acceptance of foreign joint venture management practices: a case study. Engineering, Construction and Architectural Management, 27(08), 2047–78.