Abdel Aziz, A M (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(05), 507-29.

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in a fast developing economy: the case of Malaysia. Construction Management and Economics, 12(05), 413-22.

Agapiou, A (1998) A review of recent developments in construction operative training. Construction Management and Economics, 16(05), 511-20.

Ahmad, I U and Sein, M K (1997) Construction project teams for TQM: a factor-element impact model. Construction Management and Economics, 15(05), 457-67.

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(05), 420–46.

Aibinu, A A, Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives. Construction Management and Economics, 29(05), 463–81.

Akintola, A, Venkatachalam, S and Root, D (2020) Understanding BIM’s impact on professional work practices using activity theory. Construction Management and Economics, 38(05), 447–67.

Akintoye, A, Hardcastle, C, Beck, M, Chinyio, E A and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(05), 461-70.

Al-Khalil, M I and Al-Ghafly, M A (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(05), 647-55.

Alkass, S, Mazerolle, M and Harris, F C (1996) Construction delay analysis techniques. Construction Management and Economics, 14(05), 375-94.

Alzoubi, Y, Locatelli, G and Sainati, T (2024) The ugly side of construction: modern slavery in the 2022 FIFA World Cup program. Construction Management and Economics, 42(05), 412–30.

Ammar, M A (2003) Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(05), 535-42.

Andersen, L P S and Grytnes, R (2021) Different ways of perceiving risk and safety on construction sites and implications for safety cooperation. Construction Management and Economics, 39(05), 419–31.

Aouad, G F, Kirkham, J A, Brandon, P S, Brown, F E, Cooper, G S, Ford, S R, Oxman, R E, Sarshar, M and Young, B A (1993) Information modelling in the construction industry: the information engineering approach. Construction Management and Economics, 11(05), 384-97.

Arditi, D and Gutierrez, A E (1991) Performance of US contractors in foreign markets. Construction Management and Economics, 9(05), 431-49.

Austin, S A, Baldwin, A N and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(05), 445-55.

Aziz, A M A (2007) A survey of the payment mechanisms for transportation DBFO projects in British Columbia. Construction Management and Economics, 25(05), 529–43.

Barbosa, P S F and Pimental, P R (2001) A linear programming model for cash flow management in the Brazilian construction industry. Construction Management and Economics, 19(05), 469-79.

Barkham, R (1997) The financial structure and ethos of property companies: an empirical analysis. Construction Management and Economics, 15(05), 441-56.

Bassioni, H A, Price, A D F and Hassan, T M (2005) Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Construction Management and Economics, 23(05), 495-507.

Bee Hua, G (2008) The state of applications of quantitative analysis techniques to construction economics and management (1983 to 2006). Construction Management and Economics, 26(05), 485-97.

Bon, R, Birgonul, T and Ozdogan, I (1999) An input-output analysis of the Turkish construction sector, 1973-1990: a note. Construction Management and Economics, 17(05), 543-51.

Borg, N, Scott-Young, C M, Naderpajouh, N and Borg, J (2023) Surviving adversity: personal and career resilience in the AEC industry during the COVID-19 pandemic. Construction Management and Economics, 41(05), 361–78.

Boussabaine, A H (1996) The use of artificial neural networks in construction management: a review. Construction Management and Economics, 14(05), 427-36.

Bowen, P A and Edwards, P J (1996) Interpersonal communication in cost planning during the building design phase. Construction Management and Economics, 14(05), 395-404.

Boyd, P, Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: incorporating building integrated photovoltaics. Construction Management and Economics, 33(05), 349-60.

Bresnen, M and Marshall, N (2000) Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(05), 587-98.

Brett, R, Thomson, D and Dainty, A (2022) Exploring craft in construction with short-term ethnography: reflections on a researcher’s prior insight. Construction Management and Economics, 40(05), 359–73.

Bridgeman, J and Loosemore, M (2024) Evaluating social procurement: a theoretically informed and methodologically robust social return on investment (SROI) analysis of a construction training initiative developed to reduce the risk of youth homelessness in Wales. Construction Management and Economics, 42(05), 387–411.

Bröchner, J (2009) Construction metaphors in Aristotle: knowledge, purpose, process. Construction Management and Economics, 27(05), 515–23.

Buser, M and Carlsson, V (2017) What you see is not what you get: Single-family house renovation and energy retrofit seen through the lens of sociomateriality. Construction Management and Economics, 35(05), 276-87.

Cameron, I and Duff, R (2007) A critical review of safety initiatives using goal setting and feedback. Construction Management and Economics, 25(05), 495–508.

Caven, V (2006) Career building: women and non-standard employment in architecture. Construction Management and Economics, 24(05), 457-64.

Chan, A P C, Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(05), 523-33.

Chan, J K W, Tam, C M and Cheung, R (2005) Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: a case study in Hong Kong. Construction Management and Economics, 23(05), 451-8.

Chau, K W (1993) Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(05), 370-83.

Chau, K W (1995) Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics, 13(05), 369-83.

Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(05), 545-54.

Chen, J J and Chambers, D (1999) Sustainability and the impact of Chinese policy initiatives upon construction. Construction Management and Economics, 17(05), 679-87.

Choy, L H T, Ho, W K O and Mak, S W K (2012) Housing attributes and Hong Kong real estate prices: a quantile regression analysis. Construction Management and Economics, 30(05), 359-66.

Clarke, L and Herrmann, G (2004) Cost vs. production: disparities in social housing construction in Britain and Germany. Construction Management and Economics, 22(05), 521-32.

Clarke, L and Wall, C (1998) UK construction skills in the context of European developments. Construction Management and Economics, 16(05), 553-67.

Coffey, M and Langford, D A (1998) The propensity for employee participation in construction. Construction Management and Economics, 16(05), 543-52.

Crosthwaite, D (2000) The global construction market: a cross-sectional analysis. Construction Management and Economics, 18(05), 619-27.

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(05), 393-412.

Dell’Anna, F, Berta, M, Bottero, M, Mallia, G and Morgese, V (2024) Multicriteria-decision support for master plan scheduling: urban regeneration of an industrial area in Northern Italy. Construction Management and Economics, 42(05), 476–501.

Drew, D S and Skitmore, M R (1997) The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(05), 469-89.

Drew, D S, Ho, L C Y and Skitmore, M R (2001) Analysing a consultant's competitiveness in two-envelope fee tendering. Construction Management and Economics, 19(05), 503-10.

Druker, J, White, G, Hegewisch, A and Mayne, L (1996) Between hard and soft HRM: human resource management in the construction industry. Construction Management and Economics, 14(05), 405-16.

Duong, L N K, Wang, J X, Wood, L C, Reiners, T and Koushan, M (2021) The value of incremental environmental sustainability innovation in the construction industry: an event study. Construction Management and Economics, 39(05), 398–418.

Elbashbishy, T S, Ali, G G and El-adaway, I H (2022) Blockchain technology in the construction industry: mapping current research trends using social network analysis and clustering. Construction Management and Economics, 40(05), 406–27.

Ellis, R C T, Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(05), 483-93.

Espinoza, D and Morris, J W F (2013) Decoupled NPV: a simple, improved method to value infrastructure investments. Construction Management and Economics, 31(05), 471-96.

Eyiah, A K (2001) An integrated approach of financing small contractors in developing countries: a conceptual model. Construction Management and Economics, 19(05), 511-8.

Fellows, R and Liu, A M M (2013) Use and misuse of the concept of culture. Construction Management and Economics, 31(05), 401-22.

Fellows, R F (1996) Note: Monte Carlo simulation of construction costs using subjective data: comment. Construction Management and Economics, 14(05), 457-60.

Fong, P S-W and Choi, S K-Y (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(05), 547-57.

Fox, S (2009) Applying critical realism to information and communication technologies: a case study. Construction Management and Economics, 27(05), 465–72.

Fox, S, Marsh, L and Cockerham, G (2001) Design for manufacture: a strategy for successful application to buildings. Construction Management and Economics, 19(05), 493-502.

Francis, V (2017) What influences professional women's career advancement in construction?. Construction Management and Economics, 35(05), 254-75.

Görsch, C, Seppänen, O, Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: revealing workers as early and late planners. Construction Management and Economics, 42(05), 431–50.

Galea, N, Powell, A, Loosemore, M and Chappell, L (2015) Designing robust and revisable policies for gender equality: lessons from the Australian construction industry. Construction Management and Economics, 33(05), 375-89.

Gambatese, J A and Hallowell, M (2011) Factors that influence the development and diffusion of technical innovations in the construction industry. Construction Management and Economics, 29(05), 507–17.

Gann, D M (1996) Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(05), 437-50.

Gann, D M and Senker, P (1998) Construction skills training for the next millennium. Construction Management and Economics, 16(05), 569-80.

Gibb, A, Lingard, H, Behm, M and Cooke, T (2014) Construction accident causality: learning from different countries and differing consequences. Construction Management and Economics, 32(05), 446-59.

Gil, N, Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(05), 495-508.

Gluch, P and Svensson, I (2018) On the nexus of changing public facilities management practices: purposive and co-creative actions across multiple levels. Construction Management and Economics, 36(05), 259–75.

Gluch, P, Gustafsson, M and Thuvander, L (2009) An absorptive capacity model for green innovation and performance in the construction industry. Construction Management and Economics, 27(05), 451–64.

Goh, E and Loosemore, M (2017) The impacts of industrialization on construction subcontractors: A resource-based view. Construction Management and Economics, 35(05), 288-304.

Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: a case study in Singapore. Construction Management and Economics, 31(05), 460-70.

Goodrum, P M, Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(05), 415-23.

Gori, E (1996) Note - Portfolio selection of capital investment projects in the Durban Metropolitan Region. Construction Management and Economics, 14(05), 451-6.

Gosling, J, Naim, M, Towill, D, Abouarghoub, W and Moone, B (2015) Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics, 33(05), 390-403.

Griffith, A and Phillips, N (2001) The influence of the Construction (Design and Management) Regulations 1994 upon the procurement and management of small building works. Construction Management and Economics, 19(05), 533-40.

Grill, M, Nielsen, K, Grytnes, R, Pousette, A and Törner, M (2019) The leadership practices of construction site managers and their influence on occupational safety: an observational study of transformational and passive/avoidant leadership. Construction Management and Economics, 37(05), 278–93.

Gunner, J and Skitmore, M R (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(05), 635-46.

Harty, C, Goodier, C I, Soetanto, R, Austin, S, Dainty, A R J and Price, A D F (2007) The futures of construction: a critical review of construction future studies. Construction Management and Economics, 25(05), 477–93.

Hedborg Bengtsson, S (2019) Coordinated construction logistics: an innovation perspective. Construction Management and Economics, 37(05), 294–307.

Hegazy, T and Saad, D A (2014) A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32(05), 433-45.

Holm, M G (2000) Service management in housing refurbishment: a theoretical approach. Construction Management and Economics, 18(05), 525-33.

Hook, M, Stehn, L and Brege, S (2015) The development of a portfolio of business models: a longitudinal case study of a building material company. Construction Management and Economics, 33(05), 334-48.

Hoxley, M (2000) Are competitive fee tendering and construction professional service quality mutually exclusive?. Construction Management and Economics, 18(05), 599-605.

Hu, Y and Dossick, C S (2024) Decoding the dynamics of BIM use practice in construction projects. Construction Management and Economics, 42(05), 451–75.

Hua, G B and Pin, T H (2000) Forecasting construction industry demand, price and productivity in Singapore: the Box-Jenkins approach. Construction Management and Economics, 18(05), 607-18.

Ibañez-Guzmán, J (1995) Modelling of on-site work cells for the simulation of automated and semi-automated construction. Construction Management and Economics, 13(05), 427-34.

Jacobsson, M and Linderoth, H C J (2012) User perceptions of ICT impacts in Swedish construction companies: 'it's fine, just as it is'. Construction Management and Economics, 30(05), 339-57.

Jacobsson, M and Roth, P (2014) Towards a shift in mindset: partnering projects as engagement platforms. Construction Management and Economics, 32(05), 419-32.

Jarkas, A and Horner, M (2011) Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management and Economics, 29(05), 483–93.

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(05), 527–43.

Jayawardane, A and Gunawardana, N D (1998) Construction workers in developing countries: a case study of Sri Lanka. Construction Management and Economics, 16(05), 521-30.

Jewell, C, Flanagan, R and Lu, W (2014) The dilemma of scope and scale for construction professional service firms. Construction Management and Economics, 32(05), 473-86.

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(05), 485-95.

Kale, S and Arditi, D (2001) General contractors' relationships with subcontractors: a strategic asset. Construction Management and Economics, 19(05), 541-9.

Khosrowshahi, F and Alani, A M (2003) A model for smoothing time-series data in construction. Construction Management and Economics, 21(05), 483-94.

Kim, S (1997) Organization and managerial environment of Korean construction industry. Construction Management and Economics, 15(05), 409-19.

Kim, Y W, Han, S, Shin, S and Choi, K (2011) A case study of activity‐based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(05), 449–61.

Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of NHS hospital buildings: a stochastic approach. Construction Management and Economics, 23(05), 521-9.

Klitgaard, A, Gottlieb, S C and Svidt, K (2021) The researcher as audience and storyteller: challenges and opportunities of impression management in ethnographic studies. Construction Management and Economics, 39(05), 383–97.

Kodikara, G W and McCaffer, R (1993) Flow of estimating data in Sri Lankan building contractor organizations. Construction Management and Economics, 11(05), 341-6.

Kometa, S T, Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(05), 433-43.

Koo, T K and Tiong, R L K (1993) An expert system for assessing the performance of RC beams and slabs. Construction Management and Economics, 11(05), 347-57.

Kreitl, G, Urschitz, G and Oberndorfer, W J (2002) Corporate growth of engineering consulting firms: a European review. Construction Management and Economics, 20(05), 437-48.

Krima, N A, Wood, G, Aouad, G F and Hatush, Z (2007) Assessing the performance of Libyan supervising engineers. Construction Management and Economics, 25(05), 509–18.

Kuitert, L, Volker, L and Hermans, M H (2019) Taking on a wider view: public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(05), 257–77.

Lam, K C and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(05), 589-602.

Lam, K-C, Lam, M C-K and Wang, D (2008) MBNQA_oriented self_assessment quality management system for contractors: fuzzy AHP approach. Construction Management and Economics, 26(05), 447-61.

Lam, T and Gale, K (2014) Highway maintenance: impact of framework agreements upon project financial performance. Construction Management and Economics, 32(05), 460-72.

Landin, A (2000) ISO 9001 within the Swedish construction sector. Construction Management and Economics, 18(05), 509-18.

Langford, D A, Iyagba, R and Komba, D M (1993) Prediction of solvency in construction companies. Construction Management and Economics, 11(05), 317-25.

Lee, S-H, Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(05), 545-53.

Lewis, T M (2004) The construction industry in the economy of Trinidad & Tobago. Construction Management and Economics, 22(05), 541-9.

Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(05), 459-71.

Li, H and Shen, Q (2002) Supporting the decision-making process for sustainable housing. Construction Management and Economics, 20(05), 387-90.

Li, Z, Anson, M and Li, G (2001) A procedure for quantitatively evaluating site layout alternatives. Construction Management and Economics, 19(05), 459-67.

Lindblad, H and Guerrero, J R (2020) Client’s role in promoting BIM implementation and innovation in construction. Construction Management and Economics, 38(05), 468–82.

Ling, F Y Y, Ibbs, C W and Cuervo, J C (2005) Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(05), 509-20.

Lingard, H and Turner, M (2017) Promoting construction workers' health: A multi-level system perspective. Construction Management and Economics, 35(05), 239-53.

Lingard, H C, Cooke, T and Blismas, N (2012) Designing for construction workers' occupational health and safety: a case study of socio-material complexity. Construction Management and Economics, 30(05), 367-82.

Lingard, H C, Francis, V and Turner, M (2010) Work–family enrichment in the Australian construction industry: implications for job design. Construction Management and Economics, 28(05), 467–80.

Liou, F m, Yang, C h, Chen, B and Chen, W (2011) Identifying the Pareto‐front approximation for negotiations of BOT contracts with a multi‐objective genetic algorithm. Construction Management and Economics, 29(05), 535–48.

Liu, A M M and Fang, Z (2006) A power-based leadership approach to project management. Construction Management and Economics, 24(05), 497-507.

Liu, L, Wang, X and Sheng, Z (2012) Achieving ambidexterity in large, complex engineering projects: a case study of the Sutong Bridge project. Construction Management and Economics, 30(05), 399-409.

Lo, W, Krizek, R J and Hadavi, A (1999) Effects of high pre-qualification requirements. Construction Management and Economics, 17(05), 603-12.

Loosemore, M (1999) International construction management research: cultural sensitivity in methodological design. Construction Management and Economics, 17(05), 553-61.

Loosemore, M and Bridgeman, J (2018) The social impact of construction industry schools-based corporate volunteering. Construction Management and Economics, 36(05), 243–58.

Loosemore, M and Tan, C C (2000) Occupational stereotypes in the construction industry. Construction Management and Economics, 18(05), 559-66.

Loosemore, M, Keast, R and Barraket, J (2022) A typology of social procurement champions in the construction and engineering industry. Construction Management and Economics, 40(05), 391–405.

Love, P E D, Mandal, P, Smith, J and Li, H (2000) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics, 18(05), 567-74.

Low, S P and Fong, E T W (2002) Preparations for ISO 9001: a study of ISO 9000 certified construction firms. Construction Management and Economics, 20(05), 403-13.

Low, S P and Hui, M S (1999) The application of JIT philosophy to construction: a case study in site layout. Construction Management and Economics, 17(05), 657-68.

Lowe, D J and Skitmore, M R (1994) Experiential learning in cost estimating. Construction Management and Economics, 12(05), 423-31.

Löwstedt, M (2015) ‘Taking off my glasses in order to see’: exploring practice on a building site using self-reflexive ethnography. Construction Management and Economics, 33(05), 404-14.

Mahasuar, K (2023) COVID-19 and its impact on Indian construction industry: an event study approach. Construction Management and Economics, 41(05), 428–44.

Mak, S W (1995) Risk analysis in construction: a paradigm shift from a hard to soft approach. Construction Management and Economics, 13(05), 385-92.

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in Andalusia: application to construction and demolition waste management. Construction Management and Economics, 28(05), 495–507.

Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(05), 519–27.

Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(05), 471-84.

McDermott, V, Zhang, R P, Hopkins, A and Hayes, J (2018) Constructing safety: investigating senior executive long-term incentive plans and safety objectives in the construction sector. Construction Management and Economics, 36(05), 276–90.

Miller, C J M, Packham, G A, Pickernell, D G and Mcgovern, M (2004) Building for the future: the potential importance of the construction industry in Welsh economic development policy. Construction Management and Economics, 22(05), 533-40.

Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(05), 669-77.

Modin, J (1995) KBS-CLASS: a neural network tool for automatic content recognition of building texts. Construction Management and Economics, 13(05), 411-6.

Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(05), 575-85.

Navon, R, Arkin, H and Berg, I (1997) Economic evaluation of HVAC systems with ice storage designed using an optimization technique. Construction Management and Economics, 15(05), 429-39.

Ness, K (2010) The discourse of ‘Respect for People’ in UK construction. Construction Management and Economics, 28(05), 481–93.

Newton, S and Smith, V K (1992) Methods of analysing risk exposure in the cost estimates of high quality offices. Construction Management and Economics, 10(05), 431-49.

Ng, F P and Björnsson, H C (2004) Using real option and decision analysis to evaluate investments in the architecture, construction and engineering industry. Construction Management and Economics, 22(05), 471-82.

Ng, M F, Tummala, V M R and Yam, R C M (2003) A risk-based maintenance management model for toll road/tunnel operations. Construction Management and Economics, 21(05), 495-510.

Ng, S T, Cheung, S-O, Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(05), 483-93.

Nicholas, J, Holt, G D and Mihsein, M (2000) Contractor financial credit limits: their derivation and implications for materials suppliers. Construction Management and Economics, 18(05), 535-45.

Nkado, R N and Meyer, T (2001) Competencies of professional quantity surveyors: a South African perspective. Construction Management and Economics, 19(05), 481-91.

Nwajei, U O K (2021) How relational contract theory influence management strategies and project outcomes: a systematic literature review. Construction Management and Economics, 39(05), 432–57.

Nyström, J (2008) A quasi_experimental evaluation of partnering. Construction Management and Economics, 26(05), 531-41.

Nyström, J (2005) The definition of partnering as a Wittgenstein family-resemblance concept. Construction Management and Economics, 23(05), 473-81.

O’Keeffe, D, Thomson, D and Dainty, A (2015) Evaluating the design of hospitals within a practice order network. Construction Management and Economics, 33(05), 415-27.

O'Brien, M J and Al-Soufi, A (1994) A survey of data communications in the UK construction industry. Construction Management and Economics, 12(05), 457-65.

O'Brien, W J, Fischer, M A and Jucker, J V (1995) An economic view of project coordination. Construction Management and Economics, 13(05), 393-400.

  • Type: Journal Article
  • Keywords: co-ordination; cost; information technology; systems analysis
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446199500000044
  • Abstract:

    We introduce current thinking from the field of co-ordination economics and apply it to the co-ordination needs of construction firms working on a project. A view of construction from an economic lens provides a different view of construction from that normally taken by practitioners and researchers. Combined with cost time capacity models of construction firms, we are able to offer a new paradigm for co-ordination policy in construction. This new paradigm provides an economic basis for the development and adoption of information technology by construction firms.

Odeyinka, H A (2000) An evaluation of the use of insurance in managing construction risks. Construction Management and Economics, 18(05), 519-24.

Odeyinka, H A, Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(05), 423-39.

Ofori, G (1994) Construction industry development: role of technology transfer. Construction Management and Economics, 12(05), 379-92.

Ofori, G (1992) The environment: the fourth construction project objective?. Construction Management and Economics, 10(05), 369-95.

Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(05), 509–26.

Oswald, D, Lingard, H and Zhang, R P (2022) How transactional and transformational safety leadership behaviours are demonstrated within the construction industry. Construction Management and Economics, 40(05), 374–90.

Oswald, D, Sherratt, F, Smith, S D and Hallowell, M R (2018) Exploring safety management challenges for multi-national construction workforces: a UK case study. Construction Management and Economics, 36(05), 291–301.

Oteng-Abayie, E F and Dramani, J B (2019) Time-frequency domain causality of prime building cost and macroeconomic indicators in Ghana: implications for project selection. Construction Management and Economics, 37(05), 243–56.

Oxman, R E (1995) Data, knowledge and experience in multi-user information systems. Construction Management and Economics, 13(05), 401-9.

Pantouvakis, J-P and Manoliadis, O G (2008) A compromise programming model for site selection of borrow pits. Construction Management and Economics, 26(05), 433-46.

Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(05), 495–506.

Phua, F T T (2004) Modelling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives. Construction Management and Economics, 22(05), 451-9.

Pinder, J, Iii, R S and Saker, J (2013) Stakeholder perspectives on developing more adaptable buildings. Construction Management and Economics, 31(05), 440-59.

Poon, C S, Yu, A T W and Jaillon, L (2004) Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(05), 461-70.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(05), 577-87.

Rameezdeen, R and Ramachandra, T (2008) Construction linkages in a developing economy: the case of Sri Lanka. Construction Management and Economics, 26(05), 499-506.

Ramsaran, R and Hosein, R (2006) Growth, employment and the construction industry in Trinidad and Tobago. Construction Management and Economics, 24(05), 465-74.

Ranasinghe, M (1999) Private sector participation in infrastructure projects: a methodology to analyse viability of BOT. Construction Management and Economics, 17(05), 613-23.

Ranasinghe, M and Russell, A D (1993) Elicitation of subjective probabilities for economic risk analysis: An investigation. Construction Management and Economics, 11(05), 326-40.

Richter, A (1998) Qualifications in the German construction industry: stocks, flows and comparisons with the British construction sector. Construction Management and Economics, 16(05), 581-92.

Rodríguez-Labajos, L, Thomson, C S and O’Brien, G (2021) Applying constructivist grounded theory in co-production research: a case study exploring its potential and lessons for construction management research. Construction Management and Economics, 39(05), 369–82.

Rooke, J D, Seymour, D E and Crook, D (1997) Note - Preserving methodological consistency: a reply to Raftery, McGeorge and Walters. Construction Management and Economics, 15(05), 491-4.

Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: some false benefits and inherent drawbacks. Construction Management and Economics, 9(05), 481-92.

Ross, N, Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(05), 433–49.

Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: a deterministic analysis. Construction Management and Economics, 9(05), 467-79.

Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(05), 391-401.

Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(05), 358-69.

Seboni, L and Tutesigensi, A (2015) Project manager-to-project allocations in practice: an empirical study of the decision-making practices of a multi-project based organization. Construction Management and Economics, 33(05), 428-43.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(05), 435–48.

Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(05), 415-29.

Sherratt, F (2015) Legitimizing public health control on sites? A critical discourse analysis of the Responsibility Deal Construction Pledge. Construction Management and Economics, 33(05), 444-52.

Sherratt, F and Dainty, A (2023) The power of a pandemic: how Covid-19 should transform UK construction worker health, safety and wellbeing. Construction Management and Economics, 41(05), 379–86.

Sherratt, F, Crapper, M, Foster-Smith, L and Walsh, S (2015) Safety and volunteer construction workers. Construction Management and Economics, 33(05), 361-74.

Shibeika, A and Harty, C (2015) Diffusion of digital innovation in construction: a case study of a UK engineering firm. Construction Management and Economics, 33(05), 453-66.

Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(05), 449–65.

Skitmore, M R (1992) Parameter prediction for cash-flow forecasting models. Construction Management and Economics, 10(05), 397-413.

Skitmore, M R (1991) The construction contract bidder homogeneity assumption: an empirical test. Construction Management and Economics, 9(05), 403-29.

Skitmore, R M and Ng, T (2001) Australian project time-cost analysis: Statistical analysis of intertemporal trends. Construction Management and Economics, 19(05), 455-458.

Sloan, B (1995) In search of excellence in learning: the strategic value of computer-assisted learning (CAL). Construction Management and Economics, 13(05), 435-9.

Styhre, A and Brorström, S (2023) Syndicated leadership in urban development projects: the case of the River City Gothenburg project. Construction Management and Economics, 41(05), 387–401.

Styhre, A and Josephson, P-E (2006) Revisiting site manager work: stuck in the middle?. Construction Management and Economics, 24(05), 521-8.

Svensson, I (2022) Exploring the connection between emotions, artefacts and institutional work: the case of institutional change for public facilities management. Construction Management and Economics, 40(05), 343–58.

Syben, G (1998) A qualifications trap in the German construction industry: changing the production model and the consequences for the training system in the German construction industry. Construction Management and Economics, 16(05), 593-601.

Tan, R R and Chang, D S (1993) The formulation of performance indicators in evaluating the implementation of automation in the construction industry. Construction Management and Economics, 11(05), 398-403.

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(05), 499–513.

Thomas Ng, S, Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(05), 519–34.

Tsai, H, Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(05), 545–54.

Tse, R Y C, Ho, C W and Ganesan, S (1999) Matching housing supply and demand: an empirical study of Hong Kong' s market. Construction Management and Economics, 17(05), 625-33.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: a multilevel examination of the job performance implications. Construction Management and Economics, 27(05), 473–98.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Control modes and mechanisms in construction project teams: drivers and consequences. Construction Management and Economics, 28(05), 451–65.

Uddin, S M J, Albert, A, Tamanna, M and Alsharef, A (2023) YouTube as a source of information: early coverage of the COVID-19 pandemic in the context of the construction industry. Construction Management and Economics, 41(05), 402–27.

Ulubeyli, S, Arslan, V and Kivrak, S (2015) A semiotic analysis of cartoons about occupational health and safety issues in the construction workplace. Construction Management and Economics, 33(05), 467-83.

Uwakweh, B O and Maloney, W F (1991) Conceptual model for manpower planning for the construction industry in developing countries. Construction Management and Economics, 9(05), 451-65.

Viking, A and Lidelöw, S (2015) Exploring industrialized housebuilders’ interpretations of local requirements using institutional logics. Construction Management and Economics, 33(05), 484-94.

Voordijk, H, Leuven, A v and Laan, A (2003) Enterprise Resource Planning in a large construction firm: implementation analysis. Construction Management and Economics, 21(05), 511-21.

Wang, D, Hadavi, A and Krizek, R J (2006) Chinese construction firms in reform. Construction Management and Economics, 24(05), 509-19.

Waraszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(05), 447-59.

Whittock, M (2002) Women's experience of non-traditional employment: is gender equality in this area a possibility?. Construction Management and Economics, 20(05), 449-56.

Widén, K and Hansson, B (2007) Diffusion characteristics of private sector financed innovation in Sweden. Construction Management and Economics, 25(05), 467–75.

Winch, G (1998) The growth of self-employment in construction. Construction Management and Economics, 16(05), 531-42.

Winch, G M and Carr, B (2001) Processes, maps and protocols: understanding the shape of the construction process. Construction Management and Economics, 19(05), 519-31.

Wu, C-H, Hsieh, T-Y, Cheng, W-L and Lu, S-T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(05), 509-20.

Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: a comparative evaluation of construction cost. Construction Management and Economics, 20(05), 425-35.

Xiong, B, Skitmore, M and Xia, B (2015) Exploring and validating the internal dimensions of occupational stress: evidence from construction cost estimators in China. Construction Management and Economics, 33(05), 495-507.

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(05), 417-26.

Ye, K, Jiang, W and Shen, L (2008) Project competition intensity (PCI) in the construction market: a case study in China. Construction Management and Economics, 26(05), 463-70.

Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(05), 471-82.

Yiu, C Y and Tam, C S (2006) Rational under-pricing in bidding strategy: a real options model. Construction Management and Economics, 24(05), 475-84.

Youjie, L and Qiang, Z (1997) Building economics research in PRC: a review. Construction Management and Economics, 15(05), 421-8.

Yung, P (2009) Institutional arrangements and construction safety in China: an empirical examination. Construction Management and Economics, 27(05), 439–50.

Zakeri, M, Olomolaiye, P O, Holt, G D and Harris, F C (1996) A survey of constraints on Iranian construction operatives' productivity. Construction Management and Economics, 14(05), 417-25.

Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(05), 531-43.

Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(05), 563-76.

Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(05), 529-43.

Zimina, D, Ballard, G and Pasquire, C (2012) Target value design: using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(05), 383-98.