Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 38 results ...

Abreu, M M d and Lordsleem Jr, A C (2019) Aluminum formwork system: loss and productivity. Built Environment Project and Asset Management, 9(05), 616–27.

Abuzeinab, A, Arif, M, Kulonda, D J and Awuzie, B O (2016) Green business models transformation: Evidence from the UK construction sector. Built Environment Project and Asset Management, 6(05), 478-90.

Agbesi, K, Fugar, F D and Adjei-Kumi, T (2018) Modelling the adoption of sustainable procurement in construction organisations. Built Environment Project and Asset Management, 8(05), 461–76.

Ahmad, T and Aibinu, A A (2017) Project delivery attributes influencing green building project outcomes: A review and future research directions. Built Environment Project and Asset Management, 7(05), 471-89.

Akinradewo, O, Aigbavboa, C and Oke, A (2020) Accuracy of road construction preliminary estimate: examining the influencing factors. Built Environment Project and Asset Management, 10(05), 657–71.

Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(05), 534-45.

Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(05), 546-56.

Alshihre, F, Chinyio, E, Nzekwe-Excel, C and Daniel, E I (2020) Improving clients’ satisfaction in construction projects: the case of Saudi Arabia. Built Environment Project and Asset Management, 10(05), 709–23.

Assaf, S, Hassanain, M A, Abdallah, A, Sayed, A M and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(05), 597–615.

Bandara, C, Dissanayake, D, Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(05), 515–27.

Blay, K B, Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(05), 581–96.

Cheng, J C P and Venkataraman, V (2016) Analyzing relationships between project team compositions and green building certification in green building projects. Built Environment Project and Asset Management, 6(05), 449-61.

  • Type: Journal Article
  • Keywords: project management,green building,project teams,link analysis,organizational analysis,page rank
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/BEPAM-10-2015-0056
  • Abstract:
    Purpose Literature on organizational analysis identified that project participants have a certain impact on the project outcome. However, there is no study that identifies the impact of project teams and individual project participants on a green building project. The purpose of this paper is to analyze the impact of green building project teams on green building certification. Design/methodology/approach Project information, project team information, and green building certification grade were collected using the Canadian green building database. Project team data were analyzed and organizations were ranked based on their green building project experience and collaborations with experienced green building organizations. The page rank algorithm is used to calculate the rank of organizations in order to identify the impact of organizational rank on the final green building certification grade of a project. Findings The results show a positive relationship between the green building certification grade and the number of organizations with more green building experience in a project team. The results also show that not having experienced key organizations such as owners, designers, and contractors will likely lead to a lower green building certification grade. Originality/value Impact of project teams on green building projects has not been studied before. This study used an innovative method to analyze green building project teams and to investigate the importance of green building project experience. The findings of this study provided evidence to support the influence of project team compositions in green building projects. The results presented in this paper can help project owners and managers during project team formation for successful execution of green building projects.

Crippa, J, Boeing, L C, Caparelli, A P A, da Costa, M d R d M M, Scheer, S, Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(05), 491–503.

Dolla, T and Laishram, B S (2018) Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships. Built Environment Project and Asset Management, 8(05), 449–60.

Ekanayake, E M A C and Sandanayake, Y G (2017) LIVE approach: Lean integrated value engineering for construction industry. Built Environment Project and Asset Management, 7(05), 518-33.

Ekanayake, E M K and Perera, B A K S (2016) Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. Built Environment Project and Asset Management, 6(05), 521-34.

Hu, W and Panthi, K (2020) Project status reporting system for pipeline relocation programs. Built Environment Project and Asset Management, 10(05), 693–708.

Ismail, S, Musawa, M S and Ahmad, H (2019) Transparency of public private partnership (PPP): the extent of mandatory information disclosure. Built Environment Project and Asset Management, 9(05), 655–68.

Juan, C and Olmos, F (2019) Public–private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(05), 669–82.

Kwofie, T E, Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(05), 628–41.

Leo-Olagbaye, F and Odeyinka, H A (2020) An assessment of risk impact on road projects in Osun State, Nigeria. Built Environment Project and Asset Management, 10(05), 673–91.

Liyanage, C, Dias, N, Amaratunga, D and Haigh, R (2017) Current context of transport sector in south Asia: Recommendations towards a sustainable transportation system. Built Environment Project and Asset Management, 7(05), 490-505.

Mallawaarachchi, H, De Silva, L and Rameezdeen, R (2016) Indoor environmental quality and occupants’ productivity: Suggestions to enhance national green certification criteria. Built Environment Project and Asset Management, 6(05), 462-77.

Medimagh, S and Triki, A (2019) The PPP performance based on the co-creation with customers. Built Environment Project and Asset Management, 9(05), 642–54.

Oshodi, O S, Awuzie, B O, Akotia, J, Ademiloye, A S and Ngowi, A (2020) A bibliometric analysis of recycled concrete research (1978–2019). Built Environment Project and Asset Management, 10(05), 725–36.

Pérez, C T and Costa, D (2018) Developing a taxonomy of transportation waste in construction production processes. Built Environment Project and Asset Management, 8(05), 434–48.

Pantzartzis, E, Deka, L, Price, A D F, Tann, C, Mills, G R W and Rich-Mahadkar, S (2016) Sustainable management of NHS assets backlog maintenance. Built Environment Project and Asset Management, 6(05), 535-52.

Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(05), 491-507.

Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(05), 477–90.

Samaraweera, A, Senaratne, S and Sandanayake, Y (2018) Nature of construction project cultures in the public sector: case studies in Sri Lanka. Built Environment Project and Asset Management, 8(05), 557–68.

Victoria, M F and Perera, S (2018) Managing embodied carbon in buildings: a Pareto approach. Built Environment Project and Asset Management, 8(05), 504–14.

Victoria, M F, Perera, S, Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(05), 460-70.

Waidyasekara, K G A S, De Silva, L and Rameezdeen, R (2016) Water use efficiency and conservation during construction: Drivers, barriers and practices. Built Environment Project and Asset Management, 6(05), 553-66.

Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: a comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(05), 528–43.

Yumarni, T and Amaratunga, D (2018) Gender mainstreaming as a strategy to achieve sustainable post-disaster reconstruction. Built Environment Project and Asset Management, 8(05), 544–56.

Zamenian, H, Choi, J, Sadeghi, S A and Naderpajouh, N (2017) Systematic approach for asset management of urban water pipeline infrastructure systems. Built Environment Project and Asset Management, 7(05), 506-17.

Zanni, M, Ruikar, K and Soetanto, R (2020) Systematising multidisciplinary sustainable building design processes utilising BIM. Built Environment Project and Asset Management, 10(05), 637–55.

Zin, Z M I, Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(05), 508-20.