Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 54 results ...

Ahmad, S, Soetanto, R and Goodier, C (2019) Lean approach in precast concrete component production. Built Environment Project and Asset Management, 9(03), 457–70.

Aliakbarlou, S, Wilkinson, S and Costello, S B (2017) Exploring construction client values and qualities: Are these two distinct concepts in construction studies?. Built Environment Project and Asset Management, 7(03), 234-52.

Almén, L and Larsson, T J (2014) Health and safety coordinators in building projects. Built Environment Project and Asset Management, 4(03), 251-63.

Almusharraf, A and Whyte, A (2016) Task-based defect management: Anatomical classification. Built Environment Project and Asset Management, 6(03), 345-58.

  • Type: Journal Article
  • Keywords: quality management,construction industry,defects,building projects,quality deviation,sub-tasks requirements
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/BEPAM-02-2015-0006
  • Abstract:
    Purpose - Studies on the construction defects and quality deviations have been commissioned and published in many countries, showing the global status of the issues related with construction defects. Therefore, the quality of the adapted practices in construction projects can be improved if the pattern of the sub-task, specifically the quality deviations and construction defects from the requirements and specifications is identified and understood. The purpose of this paper is to improve understanding of the behavior and pattern of the more sensitivity sub-task requirements (STRs) through the anatomy process of a particular task. Design/methodology/approach - Six criteria have been classified for the levels of the estimated STRs quality deviations. The proposed study classifications were examined through the 3,030 cases of 17 STRs from compression concrete members (i.e. column). Findings - Most of the STRs were found to be prone to deviations and the sensitivities of the STRs toward deviations and defects are varied across all STRs. The study reveals that three of the 17 STRs were observed as perfect works, ten STRs as acceptable works and four STRs as defective works. Originality/value - The study found that the sub-task deviation patterns cannot be generalized and must be individually studied to recommend the appropriate proactive measures.

Alwan, Z and Gledson, B J (2015) Towards green building performance evaluation using asset information modelling. Built Environment Project and Asset Management, 5(03), 290-303.

Atkins, R and Emmanuel, R (2014) Could refurbishment of “traditional” buildings reduce carbon emissions?. Built Environment Project and Asset Management, 4(03), 221-37.

Awuzie, B and McDermott, P (2016) A systems approach to assessing organisational viability in project-based organisations. Built Environment Project and Asset Management, 6(03), 268-83.

Böhme, T, Escribano, A, Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(03), 253–66.

Bosch, A, Volker, L and Koutamanis, A (2015) BIM in the operations stage: Bottlenecks and implications for owners. Built Environment Project and Asset Management, 5(03), 331-43.

De Silva, N, Weerasinghe, R P N P, Madhusanka, H W N and Kumaraswamy, M (2017) Relationally integrated value networks for total facilities management. Built Environment Project and Asset Management, 7(03), 313-29.

Fahmy, A, Hassan, T, Bassioni, H and McCaffer, R (2019) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(03), 313–30.

Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: hedonic regression modelling. Built Environment Project and Asset Management, 10(03), 389–406.

Hamzeh, F, Rached, F, Hraoui, Y, Karam, A J, Malaeb, Z, El Asmar, M and Abbas, Y (2019) Integrated project delivery as an enabler for collaboration: a Middle East perspective. Built Environment Project and Asset Management, 9(03), 334–47.

Hasan, A, Elmualim, A, Rameezdeen, R, Baroudi, B and Marshall, A (2018) An exploratory study on the impact of mobile ICT on productivity in construction projects. Built Environment Project and Asset Management, 8(03), 320–32.

Holt, G D and Edwards, D J (2014) Machinery transportation management: case study of “plant-trailer” H&S incidents. Built Environment Project and Asset Management, 4(03), 264-80.

Ismail, S and Haris, F A (2014) Constraints in implementing Public Private Partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(03), 238-50.

Javed, A A, Pan, W, Chen, L and Zhan, W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement. Built Environment Project and Asset Management, 8(03), 239–52.

Kamara, J M (2017) Maintaining focus on clients’ requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(03), 271-83.

Karunaratne, T L W and De Silva, N (2019) Demand-side energy retrofit potential in existing office buildings. Built Environment Project and Asset Management, 9(03), 426–39.

Kassem, M, Kelly, G, Dawood, N, Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(03), 261-77.

Ke, Y, Ling, F Y, Ning, Y and Zhang, Z (2019) Managing relationships in large public projects: comparative study of China and Singapore. Built Environment Project and Asset Management, 9(03), 348–63.

Kissi, E, Agyekum, K, Baiden, B K, Tannor, R A, Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(03), 364–82.

Kumara, W H C D, Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(03), 302-16.

Kumaraswamy, M, Mahesh, G, Mahalingam, A, Loganathan, S and Kalidindi, S N (2017) Developing a clients’ charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(03), 253-70.

Lindkvist, C (2015) Contextualizing learning approaches which shape BIM for maintenance. Built Environment Project and Asset Management, 5(03), 318-30.

Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(03), 281–92.

Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(03), 284-301.

Ling, F Y, Zhang, Z and Wong, W T (2020) How personality traits influence management styles of construction project managers. Built Environment Project and Asset Management, 10(03), 453–68.

Lokuge, W, Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(03), 332-44.

Love, P E D, Zhou, J, Matthews, J, Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(03), 278-89.

Mahmood, S, Ahmed, S M, Panthi, K and Kureshi, N I (2014) Determining the cost of poor quality and its impact on productivity and profitability. Built Environment Project and Asset Management, 4(03), 296-311.

Mathar, H, Assaf, S, Hassanain, M A, Abdallah, A and Sayed, A M (2020) Critical success factors for large building construction projects. Built Environment Project and Asset Management, 10(03), 349–67.

Motawa, I and Almarshad, A (2015) Case-based reasoning and BIM systems for asset management. Built Environment Project and Asset Management, 5(03), 233-47.

Mwesigwa, R, Nabwami, R, Mayengo, J and Basulira, G (2020) Contractual completeness as a cornerstone to stakeholder management in public private partnership projects in Uganda. Built Environment Project and Asset Management, 10(03), 469–84.

Ohueri, C C, Enegbuma, W I, Wong, N H, Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(03), 293–304.

Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(03), 281-95.

Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be?. Built Environment Project and Asset Management, 5(03), 304-17.

Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(03), 399–411.

Pärn, E A and Edwards, D (2017) Vision and advocacy of optoelectronic technology developments in the AECO sector. Built Environment Project and Asset Management, 7(03), 330-48.

Sackey, E, Tuuli, M and Dainty, A (2019) Expansive learning in contemporary construction organisations. Built Environment Project and Asset Management, 9(03), 383–98.

Schultz, A L (2017) Integrating lean and visual management in facilities management using design science and action research. Built Environment Project and Asset Management, 7(03), 300-12.

Shojaei, P and bolvardizadeh, A (2020) Rough MCDM model for green supplier selection in Iran: a case of university construction project. Built Environment Project and Asset Management, 10(03), 437–52.

Shooshtarian, S, Lingard, H and Wong, P S (2020) Using the cost of construction work to trigger legislative duties for WHS: the Australian experience. Built Environment Project and Asset Management, 10(03), 369–87.

Sridarran, P and Fernando, N G (2016) Change management framework to enable sustainable outsourcing of facilities management services. Built Environment Project and Asset Management, 6(03), 317-31.

Tanko, B L, Abdullah, F, Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(03), 305–19.

Ugulu, R A and Allen, S (2018) Using the learning curve theory in the investigation of on-site craft gangs’ blockwork construction productivity. Built Environment Project and Asset Management, 8(03), 267–80.

Vilventhan, A and Rajadurai, R (2019) 4D Bridge Information Modelling for management of bridge projects: a case study from India. Built Environment Project and Asset Management, 10(03), 423–35.

Weerasinghe, R P N P and Sandanayake, Y G (2017) Collaborative facilities management model: Sri Lankan perspective. Built Environment Project and Asset Management, 7(03), 284-99.

Whyte, A and Donaldson, J (2015) Digital model data distribution in civil engineering contracts. Built Environment Project and Asset Management, 5(03), 248-60.

Wuni, I Y and Shen, G Q (2020) Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas. Built Environment Project and Asset Management, 10(03), 407–21.

Xia, B, Wu, T, Skitmore, M, Chen, Q, Li, M and Zuo, J (2016) Delivering sustainable communities: A case study in China. Built Environment Project and Asset Management, 6(03), 253-67.

Yap, J B H and Chow, I N (2020) Investigating the managerial ‘‘nuts and bolts’’ for the construction industry. Built Environment Project and Asset Management, 10(03), 331–48.

Zahed, S E, Shahooei, S, Farooghi, F, Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW Airport. Built Environment Project and Asset Management, 9(03), 440–56.

Zarghami, S A, Gunawan, I and Schultmann, F (2019) Entropy of centrality values for topological vulnerability analysis of water distribution networks. Built Environment Project and Asset Management, 9(03), 412–25.