ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 60 results ...

Abdel-Razek, R and McCaffer, R (1987) A change in the UK construction industry structure: implications for estimating. Construction Management and Economics, 5(03), 227-42.

Abela, A, Hoxley, M, McGrath, P and Goodhew, S (2013) A comparative analysis of implementation of the Energy Performance of Buildings Directive in the Mediterranean. International Journal of Law in the Built Environment, 5(03), 222-40.

Abidel-Razek, R H (1998) Factors affecting construction quality in Egypt: identification and relative importance. Engineering, Construction and Architectural Management, 5(03), 220–7.

Adriaanse, A and Voordijk, H (2005) Interorganizational communication and ICT in construction projects: a review using metatriangulation. Construction Innovation, 5(03), 159–77.

Ahn, Y H, Pearce, A R and Holley, P W (2009) Project delivery system for foreign manufacturers in the United States. International Journal of Construction Education and Research, 5(03), 149–66.

Akama, Y, Chaplin, S and Fairbrother, P (2014) Role of social networks in community preparedness for bushfire. International Journal of Disaster Resilience in the Built Environment, 5(03), 277-91.

Alencar, C T (2000) Highway concessions in Brazil: an analysis towards the feasibility of the securitization. Journal of Financial Management of Property and Construction, 5(03), 159–69.

Ali, H M and Ruddock, L (2000) The impact of portfolio strategy onthe 'style' performance of UK property companies. Journal of Financial Management of Property and Construction, 5(03), 123–33.

Alkoc, E and Erbatur, F (1998) Site expert: a prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(03), 238–51.

Alwan, Z and Gledson, B J (2015) Towards green building performance evaluation using asset information modelling. Built Environment Project and Asset Management, 5(03), 290-303.

Amaratunga, D and Senaratne, S (2009) Principles of integrating research into teaching in higher education: Built environment perspective. International Journal of Construction Education and Research, 5(03), 220–32.

Arayici, Y, Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(03), 179–200.

Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(03), 272-88.

Bosch, A, Volker, L and Koutamanis, A (2015) BIM in the operations stage: Bottlenecks and implications for owners. Built Environment Project and Asset Management, 5(03), 331-43.

Bruce, R D, Gebken, R J and Strong, S D (2009) The impact of the leadership in energy and environmental design accredited professional (LEED-AP) credential on prime/general contractor employees. International Journal of Construction Education and Research, 5(03), 182–96.

Carrillo, P M (1998) Mergers and acquisitions: the impact on information systems and information technology. Engineering, Construction and Architectural Management, 5(03), 276–84.

Correa-Velez, I, McMichael, C and Conteh, A (2014) Levels of social trust among men from refugee backgrounds after the 2011 Queensland floods. International Journal of Disaster Resilience in the Built Environment, 5(03), 318-28.

Davenport, P and Brand, M C (2013) The effectiveness of time bar clauses following the high court in decision in Andrews v. Australia and New Zealand Banking Group. International Journal of Law in the Built Environment, 5(03), 241-52.

Dixon, M (2013) Title by registration or conquest: Interpreting the Land Registration Act 2002 in England and Wales. International Journal of Law in the Built Environment, 5(03), 194-206.

Ene, G U, Goulding, J S and John, G A (2016) Sustainable human capacity development in the African built environment: How far is the journey to a knowledge society?. Smart and Sustainable Built Environment, 5(03), 212-31.

Fitzpatrick, T and Molloy, J (2014) The role of NGOs in building sustainable community resilience. International Journal of Disaster Resilience in the Built Environment, 5(03), 292-304.

GhaffarianHoseini, A, Tookey, J, GhaffarianHoseini, A, Naismith, N and Rotimi, J O B (2016) Integrating alternative technologies to improve built environment sustainability in Africa: Nexus of energy and water. Smart and Sustainable Built Environment, 5(03), 193-211.

Gibbons, T N (2013) Management agreements in multi-unit housing developments: A case study in regulation and remedies. International Journal of Law in the Built Environment, 5(03), 207-21.

Goh, B-H (1998) Forecasting residential construction demand in Singapore: a comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(03), 261–75.

Gül, L F (2009) Evaluating design behaviour when using emerging collaboration technologies. Architectural Engineering and Design Management, 5(03), 107–23.

Hanna, K E, Morcous, G and Tadros, M K (2009) Effectiveness of class C fly ash on mitigating akali-silica reaction in concrete pavement. International Journal of Construction Education and Research, 5(03), 167–81.

Harputlugil, G U, Harputlugil, T and de Wilde, P (2009) Thermal design of Turkish schools: prospects for an improved pre-design process. Architectural Engineering and Design Management, 5(03), 153–64.

Jensen, P A (2009) Design integration of facilities management: a challenge of knowledge transfer. Architectural Engineering and Design Management, 5(03), 124–35.

Jiang, Y, Chen, H and Li, S (2009) Computation of user costs at freeway work zones using weigh-in-motion traffic data. International Journal of Construction Education and Research, 5(03), 197–219.

Jorge, A (2013) The subsidiarity rule: the unjust enrichment doctrine in construction law. International Journal of Law in the Built Environment, 5(03), 253-70.

Karni, R (1987) A systematic approach to stochastic scheduling. Construction Management and Economics, 5(03), 187-98.

Kassem, M, Kelly, G, Dawood, N, Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(03), 261-77.

Kennedy, P and Milligan, J L (2000) Cost of the adjudication process in the UK since the introduction of the Housing Grants, Construction and Regeneration Act 1996. Journal of Financial Management of Property and Construction, 5(03), 171–80.

Komolafe, M O, Oyewole, M O and Kolawole, J T (2016) Extent of incorporation of green features in office properties in Lagos, Nigeria. Smart and Sustainable Built Environment, 5(03), 232-60.

Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(03), 228–37.

Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(03), 210–9.

Laufer, A and Tucker, R L (1987) Is construction project planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5(03), 243-66.

Lindkvist, C (2015) Contextualizing learning approaches which shape BIM for maintenance. Built Environment Project and Asset Management, 5(03), 318-30.

Liow, K H (2000) Corporate financial reporting of Singapore property companies: issues and evidence. Journal of Financial Management of Property and Construction, 5(03), 149–58.

Loosemore, M (1998) The methodological challenges posed by the confrontational nature of the construction industry. Engineering, Construction and Architectural Management, 5(03), 285–93.

Love, P E D, Zhou, J, Matthews, J, Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(03), 278-89.

Lummen, N, Nakajo, S and Yamada, F (2014) Flooding due to torrential rainfall in Kumamoto, 2012. International Journal of Disaster Resilience in the Built Environment, 5(03), 260-76.

Maly, E and Ishikawa, E (2014) Planning for relocation in recovery after the Great East Japan Earthquake: Considering residential relocation in historic and international contexts. International Journal of Disaster Resilience in the Built Environment, 5(03), 243-59.

Mattila, K G and Abraham, D M (1998) Linear scheduling: past research efforts and future directions. Engineering, Construction and Architectural Management, 5(03), 294–303.

Mbugua, L M, Holt, G D and Olomolaiye, P O (2000) An evaluation of international frameworks for business self-assessment and their application in UK construction. Journal of Financial Management of Property and Construction, 5(03), 135–47.

Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(03), 252–60.

Motawa, I and Almarshad, A (2015) Case-based reasoning and BIM systems for asset management. Built Environment Project and Asset Management, 5(03), 233-47.

Mulyani, S T, Sloan, M and Susilawati, C (2014) Re-framing planning decision-making: increasing flood resilience in Jakarta. International Journal of Disaster Resilience in the Built Environment, 5(03), 230-42.

Nadim, W (2016) Live-work and adaptable housing in Egypt: A zero commuting concept, lessons learnt from informal developments. Smart and Sustainable Built Environment, 5(03), 289-302.

Nadim, W and Goulding, J S (2009) Offsite production in the UK: the construction industry and academia. Architectural Engineering and Design Management, 5(03), 136–52.

Oladiran, O J (2009) Innovative waste management through the use of waste management plans on construction projects in Nigeria. Architectural Engineering and Design Management, 5(03), 165–76.

Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be?. Built Environment Project and Asset Management, 5(03), 304-17.

Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: a micro analysis. Construction Innovation, 5(03), 135–57.

Peer, S (1987) Principles of an integrated construction company MIS with emphasis on its quantity-based sub-system. Construction Management and Economics, 5(03), 199-209.

Rwelamila, P M D and Purushottam, N (2016) Strategic project management as an innovative approach for sustainable green campus buildings in Africa: The need for a paradigm shift. Smart and Sustainable Built Environment, 5(03), 261-71.

Sohail, M and Edum-Fotwe, F T (2000) Cost-duration tool for policy decision on micro and small projects. Journal of Financial Management of Property and Construction, 5(03), 111–22.

Somasundaram, T and Davies, B J (2014) Collaboration to improve evacuation centre operations in Queensland. International Journal of Disaster Resilience in the Built Environment, 5(03), 305-17.

Uher, T E and Ritchie, J (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(03), 304–11.

Whyte, A and Donaldson, J (2015) Digital model data distribution in civil engineering contracts. Built Environment Project and Asset Management, 5(03), 248-60.

Wilson, O D, Sharpe, K and Kenley, R (1987) Estimates given and tenders received: a comparison. Construction Management and Economics, 5(03), 211-26.