ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 49 results ...
Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(03), 405-9.
Abdelmassih, A, Faddoul, R and Geara, F (2023) Impact of autonomous solutions on earthmoving electrification using machine learning: case study. Construction Innovation, 23(03), 606-21.
Abdul-Hadi, N, Al-Sudairi, A and Alqahtani, S (2005) Prioritizing barriers to successful business process re-engineering (BPR) efforts in Saudi Arabian construction industry. Construction Management and Economics, 23(03), 305-15.
Al-Mohammad, M S, Haron, A T, Esa, M, Aloko, M N, Alhammadi, Y, Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: evidence from countries with different income levels. Construction Innovation, 23(03), 683-710.
Aliu, J and Aigbavboa, C (2023) Key generic skills for employability of built environment graduates. International Journal of Construction Management, 23(03), 542–52.
AlSaggaf, A and Jrade, A (2023) Arcspat: An integrated building information modeling (BIM) and geographic information system (GIS) model for site layout planning. International Journal of Construction Management, 23(03), 505–27.
Alvand, A, Mirhosseini, S M, Ehsanifar, M, Zeighami, E and Mohammadi, A (2023) Identification and assessment of risk in construction projects using the integrated FMEA-swara-waspas model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(03), 392–404.
Amadi, A I (2023) Towards methodological adventure in cost overrun research: Linking process and product. International Journal of Construction Management, 23(03), 528–41.
Berawi, M A, Kim, A A, Naomi, F, Basten, V, Miraj, P, Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(03), 410–22.
Berg, J B, Thuesen, C and Jensen, P A (2023) Procurement innovation as a vehicle for sustainable change – a case study of the Danish model of strategic partnerships. Construction Innovation, 23(03), 665-82.
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(03), 295-304.
Chand, A M and Loosemore, M (2016) Hospital disaster management’s understanding of built environment impacts on healthcare services during extreme weather events. Engineering, Construction and Architectural Management, 23(03), 385-402.
Chileshe, N, Kavishe, N and Edwards, D J (2023) Identification of critical capacity building challenges in public-private partnerships (PPPs) projects: The case of Tanzania. International Journal of Construction Management, 23(03), 495–504.
Chotia, V and Rao, N (2018) Infrastructure financing and economic growth in India: an empirical investigation. Journal of Financial Management of Property and Construction, 23(03), 258–73.
Dainty, A R J, Bryman, A, Price, A D F, Greasley, K, Soetanto, R and King, N (2005) Project affinity: the role of emotional attachment in construction projects. Construction Management and Economics, 23(03), 241i4.
Ebekozien, A, Abdul-Aziz, A R and Jaafar, M (2023) Mitigating high development cost of low-cost housing: Findings from an empirical investigation. International Journal of Construction Management, 23(03), 472–83.
Elbeltagi, E, Ammar, M, Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(03), 265-82.
Enshassi, A, Ayash, A and Mohamed, S (2018) Factors driving contractors to implement energy management strategies in construction projects. Journal of Financial Management of Property and Construction, 23(03), 295–311.
Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(03), 323-48.
Guribie, F L, Owusu-Manu, D G, Badu, E and Edwards, D J (2023) Fuzzy synthetic evaluation of the systemic obstacles to personalizing knowledge flows within and across projects. Construction Innovation, 23(03), 546-66.
Hsieh, H H Y (2005) The 1990s Taiwan residential construction boom: a supply side interpretation. Construction Management and Economics, 23(03), 265-84.
Kanagaraj, B, Kiran, T, N, A, Al Jabri, K and S, J (2023) Development and strength assessment of eco-friendly geopolymer concrete made with natural and recycled aggregates. Construction Innovation, 23(03), 524-45.
Karasu, T, Aaltonen, K and Haapasalo, H (2023) The interplay of IPD and BIM: a systematic literature review. Construction Innovation, 23(03), 640-64.
Khalilzadeh, M, Kebriyaii, O and Rezaei, R (2023) Identification and selection of stakeholder engagement strategies: Case study of an Iranian oil and gas construction project. International Journal of Construction Management, 23(03), 484–94.
Killingsworth, J and Mehany, M H (2018) Implications of collection period variance in the construction industry. Journal of Financial Management of Property and Construction, 23(03), 330–48.
Koushki, P A, Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(03), 285-94.
Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(03), 302-22.
Lianyu, C and Tiong, R L K (2005) Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 23(03), 255-63.
Ma, L, Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(03), 283-301.
McCarney, M, Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: a conceptual model. Construction Innovation, 23(03), 587-605.
Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(03), 622-39.
Ogunsanya, O A, Aigbavboa, C O and Thwala, D W (2023) Sustainable procurement model for publicly funded construction projects in developing nations–a structural equation modeling approach. International Journal of Construction Management, 23(03), 449–61.
Oladinrin, O T, Arif, M, Rana, M Q and Gyoh, L (2023) Interrelations between construction ethics and innovation: a bibliometric analysis using VOSviewer. Construction Innovation, 23(03), 505-23.
Olugboyega, O, Oseghale, G E and Aigbavboa, C (2023) Multiple holistic case study of project-level building information modelling (BIM) adoption in Nigeria. Construction Innovation, 23(03), 567-86.
Rani, N I A, Ismail, S, Mohamed, Z and Mat Isa, C M (2023) Competitiveness framework of local contractors in the Malaysian construction industry towards globalisation and liberalisation. International Journal of Construction Management, 23(03), 553–64.
Rausch, C, Lu, R, Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(03), 565–78.
Sarihi, M, Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(03), 423–33.
Sayyed, Y, Hatamleh, M T and Alaya, A (2023) Investigating the influence of procurement management in construction projects on the innovation level and the overall project performance in developing countries. International Journal of Construction Management, 23(03), 462–71.
Sharma, R K (2018) Factors affecting financial leveraging for BSE listed real estate development companies in India. Journal of Financial Management of Property and Construction, 23(03), 274–94.
Simpeh, F and Amoah, C (2023) Assessment of measures instituted to curb the spread of COVID-19 on construction site. International Journal of Construction Management, 23(03), 383–91.
Spangenberg, S, Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(03), 237–40.
Stanitsas, M and Kirytopoulos, K (2023) Investigating the significance of sustainability indicators for promoting sustainable construction project management. International Journal of Construction Management, 23(03), 434–48.
Tam, C M, Tong, T K L, Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(03), 245-54.
Umeokafor, N (2018) Community interventions in construction health and safety and the implications. Journal of Financial Management of Property and Construction, 23(03), 312–29.
Vahdatmanesh, M and Firouzi, A (2018) Price risk management in BOT railroad construction projects using financial derivatives. Journal of Financial Management of Property and Construction, 23(03), 349–62.
Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(03), 349-68.
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(03), 317-25.
Yu, W-D and Lo, S-S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(03), 327-37.
Zhao, X, Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(03), 369-84.