ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 78 results ...
Abdullahi, B, Ibrahim, Y M, Ibrahim, A D and Bala, K (2022) Development of web-based e-tendering system for Nigerian public procuring entities. International Journal of Construction Management, 22(02), 278-91.
Aboagye, J N, Kissi, E, Acheampong, A and Badu, E (2024) Assessment of competencies to promote best project management practices for road infrastructure projects in Ghana. Journal of Engineering, Design and Technology, 22(02), 438-55.
Abouelkhier, N, Shawky, D and Marzouk, M (2022) Evaluating distance perception for architecture design alternatives in immersive virtual environment: a comparative study. Construction Innovation, 22(02), 205-21.
Adu, E T, Olowookere, L B and Olorunlogbon, O O (2026) Gender Inclusiveness in Addressing Manpower Shortages in the Nigerian Construction Industry: Barriers and Benefits. International Journal of Construction Education and Research, 22(02), 191–210.
Afshar, M R and Asadzadeh Zenozi, H (2022) Introducing a fuzzy MCDM model for financial management in multiple project environments. Construction Innovation, 22(02), 305-19.
Ahmed, M, Shakaib, M and Siddiqui, M A (2024) Analysis and comparison of flow velocities and in-cylinder temperature distributions to quantify oxides of nitrogen in a compression ignition engine using diesel and biodiesel fuels. Journal of Engineering, Design and Technology, 22(02), 422-37.
Aibinu, A A, Dassanayake, D, Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(02), 190-213.
Al-Khazraji, M S, Jweeg, M J and Bakhy, S H (2024) Free vibration analysis of a laminated honeycomb sandwich panel: a suggested analytical solution and a numerical validation. Journal of Engineering, Design and Technology, 22(02), 316-43.
Alharbi, M, Emmitt, S and Demian, P (2015) What is architectural management? Towards a pragmatic definition. Engineering, Construction and Architectural Management, 22(02), 151-68.
Ali, A M, Jasim, M H and Al-Kasob, B D H (2024) Low velocity impact study of a sandwich beams using Ritz method and finite element modelling. Journal of Engineering, Design and Technology, 22(02), 516-31.
Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(02), 305-16.
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(02), 252-61.
Andi and Minato, T (2004) Representing causal mechanism of defective designs: exploration through case studies. Construction Management and Economics, 22(02), 183-92.
Arditi, D and Lee, D-E (2004) Note - Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(02), 123-7.
Awuzie, B O, McWari, Z P, Chigangacha, P S, Aigbavboa, C O, Haupt, T C and Obi, L (2024) Analysing outsourced and insourced public infrastructure projects’ performance in a provincial department of public works: a grounded theory approach. Journal of Engineering, Design and Technology, 22(02), 456-79.
Ayat, M, Qureshi, S M and Kang, C (2024) An enhanced framework for reliably managing private participation in infrastructure ICT projects in developing countries. Journal of Engineering, Design and Technology, 22(02), 480-500.
Bendi, D, Rana, M Q, Arif, M, Lamb, S M, Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: cases from India. Construction Innovation, 22(02), 320-41.
Boamah, F A, Zhang, J, Shehzad, M U, Sherani, S and Wen, D (2024) Exploring the impact of social capitals and knowledge creation on construction firms performance in the COVID-19 era. Journal of Engineering, Design and Technology, 22(02), 404-21.
Briscoe, G H, Dainty, A R J, Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(02), 193-201.
Chan, T K and Abdul-Aziz, A-R (2017) Financial performance and operating strategies of Malaysian property development companies during the global financial crisis. Journal of Financial Management of Property and Construction, 22(02), 174-91.
Chellappa, V and Srivastava, V (2024) Science mapping approach based review of thermal comfort studies in Indian residential buildings. Journal of Engineering, Design and Technology, 22(02), 297-315.
Christermaller, F, Ibrahim, C K I C, Manu, P, Belayutham, S, Mahamadu, A-M and Yunusa-Kaltungo, A (2022) Implementation of design for safety (DFS) in construction in developing countries: A study of designers in Malaysia. Construction Economics and Building, 22(02), 1-26.
Dabirian, S, Abbaspour, S, Khanzadi, M and Ahmadi, M (2022) Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 22(02), 182-91.
Das, P P, Khatri, V N, Doley, R, Dutta, R K and Yadav, J S (2024) Estimation of bearing capacity of shallow footings on layered sand using finite elements analysis. Journal of Engineering, Design and Technology, 22(02), 385-403.
Ebekozien, A, Aigbavboa, C O, Aliu, J and Thwala, W D (2024) Generic skills of future built environment practitioners in South Africa: unexplored mechanism via students’ perception. Journal of Engineering, Design and Technology, 22(02), 561-77.
Eriksson, P E (2017) Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(02), 211-30.
Etemadi, R, Hon, C K H, Manley, K and Murphy, G (2022) Mechanisms for enhancing the use of social media for knowledge sharing by the construction professionals. Construction Innovation, 22(02), 284-304.
García de Soto, B, Agustí-Juan, I, Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(02), 205-17.
Gong, Z and Wang, N (2022) The driving process of technological innovation in construction: a firm-level CDM analysis. Construction Innovation, 22(02), 222-41.
Guribie, F L, Akubah, J T, Tengan, C and Blay Jnr, A V K (2022) Demand for green building in Ghana: a conceptual modeling and empirical study of the impediments. Construction Innovation, 22(02), 342-60.
Haynes, N S and Love, P E D (2004) Psychological adjustment and coping among construction project managers. Construction Management and Economics, 22(02), 129-40.
Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(02), 171-82.
Illankoon, I M C S, Tam, V W Y, Le, K N and Ranadewa, K A T O (2022) Causes of disputes, factors affecting dispute resolution and effective alternative dispute resolution for Sri Lankan construction industry. International Journal of Construction Management, 22(02), 218-28.
Kamath, M V, Prashanth, S, Kumar, M and Tantri, A (2024) Machine-Learning-Algorithm to predict the High-Performance concrete compressive strength using multiple data. Journal of Engineering, Design and Technology, 22(02), 532-60.
Keusters, G, Bakker, H and Houwing, E J (2024) Improving the performance of civil engineering projects through the integrated design process. Journal of Engineering, Design and Technology, 22(02), 344-64.
Khalid, K, Khalid, K and Davidson, R (2024) A multi-group assessment of safety culture among engineering students in the United Arab Emirates. Journal of Engineering, Design and Technology, 22(02), 501-15.
Kunkcu, H, Koc, K and Gurgun, A P (2026) Technology-Enhanced Communication and Contract Management in Construction Projects. International Journal of Construction Education and Research, 22(02), 254–83.
Kunkcu, H, Koc, K and Gurgun, A P (2026) Uncovering Communication Methods, Forms, and Dynamics in Construction Projects: A Comparative Analysis. International Journal of Construction Education and Research, 22(02), 233–53.
Le, P T, Kirytopoulos, K, Chileshe, N and Rameezdeen, R (2022) Taxonomy of risks in PPP transportation projects: A systematic literature review. International Journal of Construction Management, 22(02), 166-81.
Ling, F Y Y, Tan, P C, Ning, Y, Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(02), 169-89.
Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(02), 192-204.
Low, W W, Wong, K S and Lee, J L (2022) Cost-influencing risk factors in infrastructure projects on soft soils. International Journal of Construction Management, 22(02), 229-41.
Lv, Y, Feng, J, Wang, G and Li, H (2024) Stability characteristics and experiment of hydraulic drive four-wheel chassis. Journal of Engineering, Design and Technology, 22(02), 598-612.
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(02), 192-210.
Malla, V and Delhi, V S K (2022) Determining interconnectedness of barriers to interface management in large construction projects. Construction Economics and Building, 22(02), 69-101.
Manivannan, J, Loganathan, S, J, K T and Kalidindi, S N (2022) Investigating the relationship between occupational stress and work-life balance among Indian construction professionals. Construction Economics and Building, 22(02), 27-51.
McGuire, M (2026) Impact of Competition-Based Learning on Student Engagement and Performance. International Journal of Construction Education and Research, 22(02), 360–89.
Mengistu, D G and Mahesh, G (2022) Manpower development framework for Ethiopian construction industry. International Journal of Construction Management, 22(02), 121-32.
Mhlanga, J, Haupt, T C and Loggia, C (2024) Shaping circular economy in the built environment in Africa. A bibliometric analysis. Journal of Engineering, Design and Technology, 22(02), 613-42.
Mohammed, A B (2022) Applying BIM to achieve sustainability throughout a building life cycle towards a sustainable BIM model. International Journal of Construction Management, 22(02), 148-65.
Ng, F P, Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(02), 141-50.
Obi, L I, Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(02), 135-53.
Oke, A, Atofarati, J and Bello, S (2022) Awareness of 3D printing for sustainable construction in an emerging economy. Construction Economics and Building, 22(02), 52-68.
Othman, A A E and El-Saeidy, Y A (2024) Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology, 22(02), 578-97.
Oti-Sarpong, K, Pärn, E A, Burgess, G and Zaki, M (2022) Transforming the construction sector: an institutional complexity perspective. Construction Innovation, 22(02), 361-87.
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS Access� and MS Project�. Construction Management and Economics, 22(02), 203-11.
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(02), 242-51.
Rabie, M and El-Sayegh, S (2017) Modelling of tri-parameter bidding integrating cost, time and risk: a stochastic approach. Journal of Financial Management of Property and Construction, 22(02), 117-34.
Raghav, N and Bhola, A K (2024) Secured platform for healthcare data: privacy preservation based blockchain environment. Journal of Engineering, Design and Technology, 22(02), 365-84.
Rajeh, M, Tookey, J E and Rotimi, J O B (2015) Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(02), 242-67.
Ranasinghe, N, Perera, B A K S and Dilakshan, R (2022) Drivers of decisions behind outsourcing of quantity surveying services in construction projects. International Journal of Construction Management, 22(02), 292-304.
Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(02), 214-41.
Saurin, T A, Formoso, C T and Guimarães, L B M (2004) Safety and production: an integrated planning and control model. Construction Management and Economics, 22(02), 159-69.
Shen, Q, Li, H, Chung, J and Hui, P-Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(02), 213-21.
Shiyanbola, R E and Olaleye, A (2022) An investigation of housing provision strategies adopted by private developers in Lagos, Nigeria. International Journal of Construction Management, 22(02), 317-30.
Singh, V and Holmström, J (2015) Needs and technology adoption: Observation from BIM experience. Engineering, Construction and Architectural Management, 22(02), 128-50.
Sorsa, F T, Mengistu, D G and Tadesse, S T (2026) Professionals’ Performance Appraisal Practice in Construction Companies. International Journal of Construction Education and Research, 22(02), 308–30.
Steele, A and Sodhi, D (2004) Black and minority ethnic contractors and consultants and UK housing associations' contracting power. Construction Management and Economics, 22(02), 151-7.
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(02), 262-77.
Tavares, d A C, Rocha, L J and Monetti, E (2017) São Paulo’s office market: scenario for the next years. Journal of Financial Management of Property and Construction, 22(02), 154-73.
van Heerden, A, Flemmer, C, Boulic, M and McDonald, B W (2026) The Effect of Job Status on Stressors and Stress Coping Strategies in the New Zealand Construction Sector. International Journal of Construction Education and Research, 22(02), 211–32.
Vaz-Serra, P, Edwards, P and Aranda-Mena, G (2022) An early-stage project complexity assessment tool for the AEC industry. Construction Innovation, 22(02), 242-62.
Wuni, I Y, Shen, G Q P and Mahmud, A T (2022) Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(02), 133-47.
Wuni, I Y, Shen, G Q, Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(02), 263-83.
Yap, J B H and Yu, C Y (2026) Essential Needs and Strategies for Effective Contractor Communications: Bridging Gaps in Malaysia’s Construction Industry. International Journal of Construction Education and Research, 22(02), 284–307.
Ying, F J, Zhao, N and Tookey, J (2022) Achieving construction innovation in best value procurement projects: New Zealand mega projects study. Construction Innovation, 22(02), 388-403.
Yousif, O and Zakaria, R (2022) A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia. Construction Economics and Building, 22(02), 102-120.
Zohrehvandi, S (2026) A Sustainable Project Scheduling Algorithm in Construction; An Approach to Using Project Buffer Management Techniques. International Journal of Construction Education and Research, 22(02), 331–59.