ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 63 results ...
Ibem, E, O, Onyemaechi, P, C.E and yo-Vaughan, K. N. (2018) Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria . Construction Economics and Building, 18(02), 15-40.
Paz, J, C, Rozenboim, D, Cuadros, Cano, A, S. Escobar P, J, Juan Camilo Paz, David Rozenboim, Álvaro Cuadros, Sandra Cano, John Escobar (2018) A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks . Construction Economics and Building, 18(02), 41-69.
Aghimien, D, Aigbavboa, C, Oke, A and Aghimien, L (2022) Latent Institutional Environment Factors Influencing Construction Digitalization in South Africa. International Journal of Construction Education and Research, 18(02), 142–58.
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(02), 161-72.
Al Yahya, M, Skitmore, M, Bridge, A, Nepal, M and Cattell, D (2018) e-Tendering readiness in construction: the posterior model. Construction Innovation, 18(02), 0.
Almazrouei, M, Khalid, K, Abdallah, S and Davidson, R (2019) Assessing the health, safety, and environment culture in the United Arab Emirates oil and gas industry. Journal of Engineering, Design and Technology , 18(02), 495–512.
Antwi-Afari, M F, Li, H, Edwards, D J, Pärn, E A, Owusu-Manu, D, Seo, J and Wong, A Y L (2018) Identification of potential biomechanical risk factors for low back disorders during repetitive rebar lifting. Construction Innovation, 18(02), 0.
Atta, A, Ali, N, Taman, M and Etman, E (2018) Improvement the structural behavior of recycled RC elements using CdO nanoparticles. Construction Innovation, 18(02), 134–51.
Atuahene, B T and Baiden, B K (2018) Organizational culture of Ghanaian construction firms. International Journal of Construction Management, 18(02), 177-88.
Austin, S A, Baldwin, A N, Baizhan, L and Waskett, P (2000) Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(02), 173-82.
Badu, E, Owusu-Manu, D-G, Edwards, D J, Adesi, M and Lichtenstein, S (2013) Rural infrastructure development in the Volta region of Ghana: barriers and interventions. Journal of Financial Management of Property and Construction, 18(02), 142-59.
Balatbat, M C A, Lin, C-Y and Carmichael, D G (2011) Management efficiency performance of construction businesses: Australian data. Engineering, Construction and Architectural Management, 18(02), 140–58.
Bamgbade, J A, Kamaruddeen, A M, Nawi, M N M, Yusoff, R Z and Bin, R A (2018) Does government support matter? Influence of organizational culture on sustainable construction among Malaysian contractors. International Journal of Construction Management, 18(02), 93-107.
Bresnen, M and Marshall, N (2000) Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management and Economics, 18(02), 229-37.
Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(02), 0.
Chakraborty, T, Das, S K, Pathak, V and Mukhopadhyay, S (2018) Occupational stress, musculoskeletal disorders and other factors affecting the quality of life in Indian construction workers. International Journal of Construction Management, 18(02), 144-50.
Chan, D W M, Lam, P T I, Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(02), 188–205.
Dainty, A R J, Bagilhole, B M and Neale, R H (2000) A grounded theory of women's career under-achievement in large UK construction companies. Construction Management and Economics, 18(02), 239-50.
Daoud, A O, Othman, A A E, Ebohon, O J and Bayyati, A (2022) Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: a critical analysis. Architectural Engineering and Design Management, 18(02), 114–27.
Eberhardt, L C M, Birkved, M and Birgisdottir, H (2022) Building design and construction strategies for a circular economy. Architectural Engineering and Design Management, 18(02), 93–113.
Fadiya, O O, Georgakis, P, Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(02), 128-41.
Farnsworth, C B, Smith, J P and Bingham, E D (2022) A Cross-Sectional Study Exploring IJCER Impact in Construction Scholarship. International Journal of Construction Education and Research, 18(02), 179–98.
Goh, B-H (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector. Construction Management and Economics, 18(02), 209-17.
Haran, M, McCord, M, Hutchison, N, McGreal, S, Adair, A, Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: an international perspective. Journal of Financial Management of Property and Construction, 18(02), 184-203.
Hassan, A, Purnomo, M R A and Anugerah, A R (2019) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology , 18(02), 378–88.
Hastheetham, A and Hadikusumo, B H W (2011) Theoretical framework of strategic behaviours in Thai contractors: An empirical case study. Engineering, Construction and Architectural Management, 18(02), 206–25.
Jens, K and Gregg, J S (2022) Building performances in open and enclosed spaces: a method for balancing operational costs and space utilization with a focus on user needs and satisfaction. Architectural Engineering and Design Management, 18(02), 149–64.
Kikwasi, G J (2011) An evaluation of construction skills in Tanzania. Engineering, Construction and Architectural Management, 18(02), 127–39.
Kwofie, T E, Aigbavboa, C O and Thwala, W D (2019) Measures to improve the adoption of life cycle assessment in the South African construction industry. Journal of Engineering, Design and Technology , 18(02), 480–94.
Larsen, J, K, Lindhard, S, M, Brunoe, T. D and Jensen, KN (2018) The Relation between Pre-planning, Commissioning and Enhanced Project Performance. Construction Economics and Building, 18(02), 1-14.
Lingard, H, Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: an overlooked dimension of group-level safety climate in the construction industry?. Engineering, Construction and Architectural Management, 18(02), 159–75.
Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(02), 139-49.
Marinelli, M and Salopek, M (2019) Joint risk management and collaborative ethos. Journal of Engineering, Design and Technology , 18(02), 343–61.
Mostafaeipour, A, Qolipour, M, Rezaei, M and Goudarzi, H (2019) Techno-economic assessment of using wind power system for tribal region of Gachsaran in Iran. Journal of Engineering, Design and Technology , 18(02), 293–307.
Nadhim, E, A, Hon, C, K, H , Xia, B, Stewart, I and Fang, D (2018) Investigating the Relationships between Safety Climate and Safety Performance Indicators in Retrofitting Works . Construction Economics and Building, 18(02), 110-129.
Nasirzadeh, F, Khanzadi, M and Mir, M (2018) A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: An application to model construction workers' safety behavior. International Journal of Construction Management, 18(02), 132-43.
Noorzai, E, Gharouni Jafari, K and Moslemi Naeni, L (2022) Lessons Learned on Selecting the Best Mass Housing Method Based on Performance Evaluation Criteria in Iran. International Journal of Construction Education and Research, 18(02), 123–41.
Ogbu, C P and Adindu, C C (2019) Direct risk factors and cost performance of road projects in developing countries. Journal of Engineering, Design and Technology , 18(02), 326–42.
Okafor, C C, Ani, U S and Ugwu, O (2022) Evaluation of Supply Chain Management Lapses in Nigeria’s Construction Industry. International Journal of Construction Education and Research, 18(02), 103–22.
Okoye, P, U (2018) Occupational Health and Safety Risk Levels of Building Construction Trades in Nigeria . Construction Economics and Building, 18(02), 92-109.
Olabanji, O M and Mpofu, K (2019) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology , 18(02), 451–79.
Omopariola, E D, Windapo, A, Edwards, D J and Thwala, W D (2019) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology , 18(02), 308–25.
Othman, A A E and Abdelrahim, S M (2019) Achieving sustainability through reducing construction waste during the design process. Journal of Engineering, Design and Technology, 18(02), 362–77.
Oyedele, J B, McGreal, S, Adair, A and Ogedengbe, P (2013) Performance and role of European listed infrastructure in a mixed-asset portfolio. Journal of Financial Management of Property and Construction, 18(02), 160-83.
Oyewobi, L O, Windapo, A O and Cattell, K S (2013) Impact of business diversification on South African construction companies' corporate performance. Journal of Financial Management of Property and Construction, 18(02), 110-27.
Patlakas, P, Musso, M and Larkham, P (2022) A digital curation model for post-occupancy evaluation data. Architectural Engineering and Design Management, 18(02), 128–48.
Pietroforte, R, Bon, R and Gregori, T (2000) Regional development and construction in Italy: an input-output analysis, 1959-1992. Construction Management and Economics, 18(02), 151-9.
Rasheed, E O, Yu, J, Hale, S and Booth, N (2022) The Impact of External and Internal Sources of Motivation on Young Women’s Interest in Construction-Related Careers: An Exploratory Study. International Journal of Construction Education and Research, 18(02), 159–78.
Sarhan, J, Xia, B, Fawzia, S, Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(02), 246–72.
Sariola, R (2018) Utilizing the innovation potential of suppliers in construction projects. Construction Innovation, 18(02), 0.
Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(02), 176–87.
Shen, L and Cheung, S O (2018) How forming joint ventures may affect market concentration in construction industry?. International Journal of Construction Management, 18(02), 151-62.
Simpson, K B and Sam, A (2019) Strategies for health and safety management in Ghana. Journal of Engineering, Design and Technology , 18(02), 431–50.
Sinesilassie, E G, Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(02), 108-19.
Smith, S D, Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(02), 219-28.
Sobotka, A (2000) Simulation modelling for logistics re-engineering in the construction company. Construction Management and Economics, 18(02), 183-95.
Swallow, M and Zulu, S (2019) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology , 18(02), 414–30.
Tawalare, A, G and Laishram, B (2018) Relational Contracting Conceptual Model for Public Sector Construction Organisations: An Indian Context . Construction Economics and Building, 18(02), 70-91.
Tolstoy, D and Axelsson, B (2018) The development of international purchasing capabilities: A comparative study of the four largest Swedish construction firms. International Journal of Construction Management, 18(02), 163-76.
Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(02), 197-207.
Witmer, A (2019) An ethnographic justification for establishment of a contextual engineering discipline. Journal of Engineering, Design and Technology , 18(02), 389–413.
Wong, K-C and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(02), 131-8.
Zaher, M, Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(02), 152–66.