Asiedu, R O, Adaku, E and Owusu-Manu, D-G (2017) Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(03), 363-80.

Aziz, Z, Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(03), 294-323.

Babatunde, S O and Ekundayo, D (2019) Barriers to the incorporation of BIM into quantity surveying undergraduate curriculum in the Nigerian universities. Journal of Engineering, Design and Technology, 17(03), 629–48.

Badu, E, Edwards, D J, Owusu-Manu, D and Brown, D M (2012) Barriers to the implementation of innovative financing (IF) of infrastructure. Journal of Financial Management of Property and Construction, 17(03), 253-73.

Bellifa, S and Boumechra, N (2019) Effects of calcium leaching on the physical and mechanical properties of aerial lime-cement mortars. Journal of Engineering, Design and Technology , 17(03), 649–66.

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(03), 351-62.

Cheung, E, Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(03), 292–308.

Dabous, S A and Alkass, S (2010) A multi-attribute ranking method for bridge management. Engineering, Construction and Architectural Management, 17(03), 282–91.

Dang, C N and Le-Hoai, L (2019) Relating knowledge creation factors to construction organizations’ effectiveness. Journal of Engineering, Design and Technology, 17(03), 515–36.

Dithebe, K, Aigbavboa, C O, Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology , 17(03), 554–71.

Farrow, C B and Leathem, T (2021) The Syllabus as a Tool to Enhance Teaching & Learning in Construction Education. International Journal of Construction Education and Research, 17(03), 201–21.

Gaafar, H K and Perry, J G (1999) Strategies for insuring sub-contracted works. Construction Management and Economics, 17(03), 383-91.

García de Soto, B, Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(03), 165-96.

Golizadeh, H, Banihashemi, S, Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(03), 197-209.

Green, S D (1999) A participative research strategy for propagating soft methodologies in value management practice. Construction Management and Economics, 17(03), 329-40.

Henderson, J R and Ruikar, K (2010) Technology implementation strategies for construction organisations. Engineering, Construction and Architectural Management, 17(03), 309–27.

Hietajärvi, A-M, Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(03), 340-62.

Ibem, E O, Aduwo, E B, Afolabi, A O, Oluwunmi, A O, Tunji-Olayeni, P F, Ayo-Vaughan, E A and Uwakonye, U O (2021) Electronic (e-) Procurement Adoption and Users’ Experience in the Nigerian Construction Sector. International Journal of Construction Education and Research, 17(03), 258–76.

Irurah, D K and Holm, D (1999) Energy impact analysis of building construction as applied to South Africa. Construction Management and Economics, 17(03), 363-74.

Jepson, J, M, Kirytopoulos, K and London, K (2017) Exploring project managers’ perception of stress when working in increasingly complex construction projects . Construction Economics and Building, 17(03), 47-67.

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(03), 381-403.

Kenley, R (1999) Cash farming in building and construction: a stochastic analysis. Construction Management and Economics, 17(03), 393-401.

Kereri, J O and Adamtey, S (2019) RFID use in residential/commercial construction industry. Journal of Engineering, Design and Technology , 17(03), 591–612.

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(03), 305-14.

Liang, L, Hu, X, Tivendale, L and Liu, C (2017) The log mean divisia index based carbon productivity in the Australian construction industry . Construction Economics and Building, 17(03), 68-84.

Liao, L, Teo, E, A, L and Low, S, P (2017) A project management framework for enhanced productivity performance using building information modelling . Construction Economics and Building, 17(03), 1-26.

Masu, S, Gichunge, H and K'Akumu, O A (2012) Component ratios of new building costs in Nairobi: a contractors' perspective. Journal of Financial Management of Property and Construction, 17(03), 222-34.

Mayouf, M, Gerges, M and Cox, S (2019) 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. Journal of Engineering, Design and Technology , 17(03), 537–53.

McCluskey, W, Davis, P, Haran, M, McCord, M and McIlhatton, D (2012) The potential of artificial neural networks in mass appraisal: the case revisited. Journal of Financial Management of Property and Construction, 17(03), 274-92.

Mekid, S and Bashmal, S (2019) Engineering manipulation at nanoscale: further functional specifications. Journal of Engineering, Design and Technology, 17(03), 572–90.

Mok, K Y, Shen, G Q and Yang, R J (2017) A network theory-based analysis of stakeholder issues and their interrelationships in large construction projects: A case study. International Journal of Construction Management, 17(03), 210-27.

Mostafaeipour, A, Goudarzi, H, Sedaghat, A, Jahangiri, M, Hadian, H, Rezaei, M, Golmohammadi, A and Karimi, P (2019) Energy efficiency for cooling buildings in hot and dry regions using sol-air temperature and ground temperature effects. Journal of Engineering, Design and Technology, 17(03), 613–28.

Odeyinka, H, Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(03), 203-21.

Okoroh, M I and Torrance, V B (1999) A model for sub-contractor selection in refurbishment projects. Construction Management and Economics, 17(03), 315-27.

Park, J and Tucker, R (2017) Overcoming barriers to the reuse of construction waste material in Australia: A review of the literature. International Journal of Construction Management, 17(03), 228-37.

Pietroforte, R and Bon, R (1999) The Italian residential construction sector: an input-output historical analysis. Construction Management and Economics, 17(03), 297-303.

Rosa, J, E, Hon,C, K, H, Xia, B and Lamari, F (2017) Challenges, success factors and strategies for women’s career development in the Australian construction industry . Construction Economics and Building, 17(03), 27-46.

Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(03), 252–67.

Runeson, G and Skitmore, M R (1999) Tendering theory revisited. Construction Management and Economics, 17(03), 285-96.

Sackey, E and Akotia, J (2017) Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects. Construction Innovation, 17(03), 273-93.

Scott, S and Assadi, S (1999) A survey of the site records kept by construction supervisors. Construction Management and Economics, 17(03), 375-82.

Sha'ar, K Z, Assaf, S A, Bambang, T, Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(03), 238-50.

Shalwani, A and Lines, B C (2021) An Empirical Analysis of the Causes of Cost and Schedule Growth for Small Healthcare and Educational Construction Projects. International Journal of Construction Education and Research, 17(03), 277–96.

Silva, N D, Ranasinghe, M and Silva, C R D (2012) Risk factors affecting building maintenance under tropical conditions. Journal of Financial Management of Property and Construction, 17(03), 235-52.

Slaughter, E S (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(03), 341-50.

Somiah, M K, Aigbavboa, C and Thwala, W D (2021) Rethinking the Attributes for Competitive Advantage of Indigenous Construction Firms in Developing Countries: A Ghana Study. International Journal of Construction Education and Research, 17(03), 242–57.

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(03), 251-67.

Sun, H, Fan, Z, Zhou, Y and Shi, Y (2010) Empirical research on competitiveness factors: Analysis of real estate industry of Beijing and Tianjin. Engineering, Construction and Architectural Management, 17(03), 240–51.

Thakur, N, Awasthi, Y, Hooda, M and Siddiqui, A S (2019) Adaptive whale optimization for intelligent multi-constraints power quality improvement under deregulated environment. Journal of Engineering, Design and Technology, 17(03), 490–514.

van Rensburg, R, Mellado, B and Augusto Marin Tobon, C (2019) Wireless mesh network data communications and reliability analysis for anti-theft application deployment in educational institutions. Journal of Engineering, Design and Technology, 17(03), 474–89.

Vaz-Serra, P and Mitcheltree, H (2021) Understanding the Key Master of Construction Project Management Graduate Competencies Required to Meet Industry Needs in Australia. International Journal of Construction Education and Research, 17(03), 222–41.

Vermande, H M and Mulligen, P-H v (1999) Construction costs in The Netherlands in an international context. Construction Management and Economics, 17(03), 269-83.

Worrall, L, Harris, K, Stewart, R, Thomas, A and McDermott, P (2010) Barriers to women in the UK construction industry. Engineering, Construction and Architectural Management, 17(03), 268–81.

Zaeri, F, Rotimi, J O B, Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(03), 324-39.