Abdirad, H (2017) Metric-based BIM implementation assessment: a review of research and practice. Architectural Engineering and Design Management, 13(01), 52–78.
Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: a case study. Construction Management and Economics, 13(01), 23-32.
Abidin, N Z, Yusof, N A and Othman, A A E (2013) Enablers and challenges of a sustainable housing industry in Malaysia. Construction Innovation, 13(01), 10-25.
Ahmed, A B, Musonda, I and Pretorius, J H C (2023) Dynamics of PPP investment in energy and country governance: evidence from Sub-Saharan Africa. Built Environment Project and Asset Management, 13(01), 172-84.
Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(01), 33-42.
Amudjie, J, Agyekum, K, Adinyira, E, Amos-Abanyie, S and Kumah, V M A (2023) Awareness and practice of the principles of circular economy among built environment professionals. Built Environment Project and Asset Management, 13(01), 140-56.
Asad, R, Ahmed, I, Vaughan, J and von Meding, J (2022) Traditional water knowledge: challenges and opportunities to build resilience to urban floods. International Journal of Disaster Resilience in the Built Environment, 13(01), 1-13.
Bajar, K, Kamat, A, Shanker, S and Barve, A (2024) Blockchain technology: a catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(01), 133-78.
Bibby, L, Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(01), 7–26.
Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(01), 82–95.
Budde, B (2013) Challenges of coordination between climate and technology policies: A case study of strategies in Denmark and the UK. Construction Innovation, 13(01), 98-116.
Charles, S H, Chang-Richards, A and Yiu, T W (2022) What do post-disaster reconstruction project success indicators look like? End-user’s perspectives. International Journal of Disaster Resilience in the Built Environment, 13(01), 31-50.
Charles, S H, Chang-Richards, A Y and Yiu, T W (2022) A systematic review of factors affecting post-disaster reconstruction projects resilience. International Journal of Disaster Resilience in the Built Environment, 13(01), 113-32.
Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong. Construction Management and Economics, 13(01), 15-21.
Codinhoto, R and Kiviniemi, A (2017) Evidencing changes in design practice. Architectural Engineering and Design Management, 13(01), 1–2.
Cooke, T (2013) Can knowledge sharing mitigate the effect of construction project complexity?. Construction Innovation, 13(01), 5-9.
Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: an application to the pre-cast industry. Construction Management and Economics, 13(01), 53-64.
Dib, H, Adamo-Villani, N and Issa, R R A (2013) A GIS-based visual information model for buildng construction project management. International Journal of Construction Management, 13(01), 1-18.
Donato, V (2017) Towards design process validation integrating graph theory into BIM. Architectural Engineering and Design Management, 13(01), 22–38.
English, J and Hay, P (2015) Black South African women in construction: cues for success. Journal of Engineering, Design and Technology, 13(01), 144-64.
Enshassi, A, Aziz, A R A and Karriri, A a E (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(01), 35–47.
Enshassi, A, Mohamed, S and Modough, Z (2013) Contractors' selection criteria: Opinions of Palestinian construction professionals. International Journal of Construction Management, 13(01), 19-37.
Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: main contractors' perspective. Built Environment Project and Asset Management, 13(01), 105-22.
Faris, H, Gaterell, M and Hutchinson, D (2024) Developing a collaborative framework for construction projects in emerging economies. Smart and Sustainable Built Environment, 13(01), 199-216.
Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(01), 66-84.
Fore, S and Mbohwa, C (2015) Greening manufacturing practices in a continuous process industry: Case study of a cement manufacturing company. Journal of Engineering, Design and Technology, 13(01), 94-122.
Fung, I W H and Tam, V W Y (2013) Development of an empirical model for selecting accident prevention measures for construction managers. International Journal of Construction Management, 13(01), 39-51.
Gambo, N, Said, I and Ismail, R (2017) Mediation model for improving cost factors that affect performance of small-scale building construction contract business in Nigeria: A PLS-SEM approach. International Journal of Construction Education and Research, 13(01), 24-46.
Ghansah, F A and Lu, W (2024) Major opportunities of digital twins for smart buildings: a scientometric and content analysis. Smart and Sustainable Built Environment, 13(01), 63-84.
Gharaibeh, L, Eriksson, K M, Lantz, B, Matarneh, S and Elghaish, F (2024) Toward digital construction supply chain-based Industry 4.0 solutions: scientometric-thematic analysis. Smart and Sustainable Built Environment, 13(01), 42-62.
Goldsmith, W and Flanagan, T (2017) Value methodology – case studies within climate resilience and sustainability policy application. Architectural Engineering and Design Management, 13(01), 3–21.
Grant, A and Hinze, J (2013) Underlying causal factors associated with construction worker fatalities involving stepladders. Construction Economics and Building, 13(01), 13-22.
Guven, G and Ergen, E (2013) Factors affecting the selection of data storage approach in radio frequency identification applications. Construction Innovation, 13(01), 117-38.
Gyadu-Asiedu, W, Anewuoh, F and Appiadu-Boakye, K (2023) The real estate market in Ghana: the nexus between price and income levels. Built Environment Project and Asset Management, 13(01), 56-72.
Hellenborn, B, Eliasson, O, Yitmen, I and Sadri, H (2024) Asset information requirements for blockchain-based digital twins: a data-driven predictive analytics perspective. Smart and Sustainable Built Environment, 13(01), 22-41.
Holt, G D (2013) Construction business failure: conceptual synthesis of causal agents. Construction Innovation, 13(01), 50-76.
Hui, E C M and Ng, I M H (2008) A risk-based option pricing strategy for property valuation: an empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(01), 48–59.
Ishiwatari, M (2022) Effectiveness of investing in flood protection in metropolitan areas: lessons from 2019 Typhoon Hagibis in Japan. International Journal of Disaster Resilience in the Built Environment, 13(01), 89-98.
Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(01), 50-65.
Jarkas, A M and Haupt, T C (2015) Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(01), 165-94.
Jay, C I and Bowen, P A (2015) Value management and innovation: A historical perspective and review of the evidence. Journal of Engineering, Design and Technology, 13(01), 123-43.
Jeong, K S, Kagioglou, M, Haigh, R, Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(01), 62–81.
Kamardeen, I (2013) Motivation-driven learning and teaching model for construction education. Construction Economics and Building, 13(01), 36-49.
Karim, K, Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(01), 27–42.
Kiu, M S, Lai, K W, Chia, F C and Wong, P F (2024) Blockchain integration into electronic document management (EDM) system in construction common data environment. Smart and Sustainable Built Environment, 13(01), 117-32.
Koneswaran, B, Siriwardana, C and Jayasekara, R U (2022) Development of flood vulnerability curves for Sri Lankan hospitals. International Journal of Disaster Resilience in the Built Environment, 13(01), 99-112.
Livesey, P and Bold, J (2013) Overcoming inadvertent barriers to entry in large infrastructure projects. Construction Economics and Building, 13(01), 85-91.
Loganathan, M K and Gandhi, O P (2015) Reliability evaluation and analysis of CNC cam shaft grinding machine. Journal of Engineering, Design and Technology, 13(01), 37-73.
Loosemore, M (1995) Reactive management: communication and behavioural issues in dealing with the occurrence of client risks. Construction Management and Economics, 13(01), 65-80.
Manoharan, K, Dissanayake, P B G, Pathirana, C, Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(01), 36-55.
Maritz, M J and Hattingh, V (2015) Electronic communication in the construction industry. Journal of Engineering, Design and Technology, 13(01), 74-93.
Mejlænder-Larsen, & (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(01), 39–51.
Mohanty, S, Dabral, A, Chatterjee, R and Shaw, R (2022) Shelter management during pandemics: lessons from cascading risks of cyclones and COVID-19. International Journal of Disaster Resilience in the Built Environment, 13(01), 72-88.
Mokhtar Azizi, Z, Cochrane, J, Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(01), 5-19.
Mollo, L (2015) Influence of cement/sand ratio on behavior of cement mortar. Journal of Engineering, Design and Technology, 13(01), 23-36.
Naveed, M H, Thaheem, M J, Khurshid, M B and Farooqui, R U H (2017) Performance assessment of construction engineering and management degree program in developing countries: Case of Pakistan. International Journal of Construction Education and Research, 13(01), 3-23.
Nedaei, A, Seyednaghavi, M, Firouzfar, M and Zamani, N (2022) A comparative study of urban resilience in coping with the crisis in the metropolises of Tehran and Mashhad. International Journal of Disaster Resilience in the Built Environment, 13(01), 51-71.
Ng, S T, Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(01), 77-97.
Nkado, R N (1995) Construction time-influencing factors: the contractor's perspective. Construction Management and Economics, 13(01), 81-9.
Obi, L I, Omotayo, T, Ekundayo, D and Oyetunji, A K (2024) Enhancing BIM competencies of built environment undergraduates students using a problem-based learning and network analysis approach. Smart and Sustainable Built Environment, 13(01), 217-38.
Obi, L, Arif, M, Daniel, E I, Oladinrin, O T and Goulding, J S (2023) Establishing underpinning concepts for integrating circular economy and offsite construction: a bibliometric review. Built Environment Project and Asset Management, 13(01), 123-39.
Odeyinka, H A, Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(01), 5–17.
Ogunnusi, M, Salman, H and Laing, R (2023) TOPSIS analysis for sustainable redevelopment potential of abandoned infrastructure in Nigeria. Built Environment Project and Asset Management, 13(01), 73-88.
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(01), 60–79.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(01), 96–113.
Perrenoud, A J and Sullivan, K T (2017) Analysis of executive succession planning in 12 construction companies. International Journal of Construction Education and Research, 13(01), 64-80.
Pim-Wusu, M, Aigbavboa, C and Thwala, W D (2023) Adaptability capacity framework for sustainable practices in the Ghanaian construction industry. Built Environment Project and Asset Management, 13(01), 89-104.
Pouryarmohammadi, M, Ahmadi, H and Salaripour, A (2022) Developing physical resilience strategies in passive defense according to identification of endangered areas of urban environments (case study: Ahvaz city). International Journal of Disaster Resilience in the Built Environment, 13(01), 14-30.
Pries, F and Janszen, F (1995) Innovation in the construction industry: the dominant role of the environment. Construction Management and Economics, 13(01), 43-51.
Rameezdeen, R and Rodrigo, A (2013) Textual complexity of standard conditions used in the construction industry. Construction Economics and Building, 13(01), 1-12.
Rankohi, S, Bourgault, M and Iordanova, I (2023) The new-normal challenges and IPD solutions: a Canadian case study. Built Environment Project and Asset Management, 13(01), 20-35.
Rodrigo, N, Omrany, H, Chang, R and Zuo, J (2024) Leveraging digital technologies for circular economy in construction industry: a way forward. Smart and Sustainable Built Environment, 13(01), 85-116.
Ruan, X, Ochieng, E, Price, A and Egbu, C (2013) Time for a real shift to relations: appraisal of Social Network Analysis applications in the UK construction industry. Construction Economics and Building, 13(01), 92-105.
Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(01), 23-35.
Talla, A and McIlwaine, S (2024) Industry 4.0 and the circular economy: using design-stage digital technology to reduce construction waste. Smart and Sustainable Built Environment, 13(01), 179-98.
Tavakoli, P, Yitmen, I, Sadri, H and Taheri, A (2024) Blockchain-based digital twin data provenance for predictive asset management in building facilities. Smart and Sustainable Built Environment, 13(01), 4-21.
Thomson, D S, Austin, S A, Root, D S, Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(01), 43–61.
Unuigbe, M, Zulu, S L and Johnston, D (2023) Challenges to energy transitioning in commercial buildings in the Nigerian built environment – from generator to RETs economy. Built Environment Project and Asset Management, 13(01), 157-71.
Vinodh, S, Kamala, V and Jayakrishna, K (2015) Application of fuzzy axiomatic design methodology for selection of design alternatives. Journal of Engineering, Design and Technology, 13(01), 2-22.
Voelker, C, Permana, A, Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(01), 18–34.
Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(01), 47-63.
Watts, G, McDermott, P and Kolo, S (2023) Framing the barriers to construction industry transformation. Built Environment Project and Asset Management, 13(01), 185-99.
Winch, G and Campagnac, E (1995) The organization of building projects: an Anglo/French comparison. Construction Management and Economics, 13(01), 3-14.
Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(01), 26-49.