ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 66 results ...

Abdul-Aziz, A-R (1995) Examination of the eclectic paradigm as applied to international contracting: with emphasis on the internalization dimension. Engineering, Construction and Architectural Management, 2(02), 105–20.

Ahmed, I (2011) An overview of post-disaster permanent housing reconstruction in developing countries. International Journal of Disaster Resilience in the Built Environment, 2(02), 148-64.

Aouad, G F, Kawooya, A A O and Price, A D F (1996) Construction planning models: a review of history, capabilities and limitations. Journal of Construction Procurement, 2(02), 19–37.

Arumala, J O (2006) Mold and the construction industry. International Journal of Construction Education and Research, 2(02), 75-89.

Badger, W W and Smith, J C (2006) Ranking construction programs: the academic debate ebgins. International Journal of Construction Education and Research, 2(02), 127-42.

Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(02), 39–58.

Bowen, P, Cattel, K, Hall, K, Edwards, P and Pearl, R (2002) Perceptions of time, cost and quality management on building projects. Construction Economics and Building, 2(02), 48-56.

Brandon, P S (1984) Cost versus quality: a zero sum game?. Construction Management and Economics, 2(02), 111-26.

Burrus, R T, Dumas, C F and Graham, J E (2011) Hurricane risk and coastal property owner choices. International Journal of Disaster Resilience in the Built Environment, 2(02), 118-38.

Cherns, A B and Bryant, D T (1984) Studying the client's role in construction management. Construction Management and Economics, 2(02), 177-84.

Ciesielski, C A (2006) OSHA cards and instruction in construction safety. International Journal of Construction Education and Research, 2(02), 113-26.

Cioffi, J, Wilkes, L and O'Brien, J (2002) Outdoor workers and sun protection: knowledge and behaviour. Construction Economics and Building, 2(02), 10-14.

Deakin, M (1997) The development of computer-based information systems for local authority property management 2 : the application. Journal of Financial Management of Property and Construction, 2(02), 59–84.

Delhi, V S K, Mahalingam, A and Palukuri, S (2012) Governance issues in BOT based PPP infrastructure projects in India. Built Environment Project and Asset Management, 2(02), 234-49.

Dhar, T K, Hossain, M S M and Rahaman, K R (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(02), 140-57.

Drew, D, Kwong, C, Zou, P and Shen, L Y (2002) Determining the optimal fee-technical proposal combination in two envelope fee bidding. Construction Economics and Building, 2(02), 1-9.

Edwards, B and Eckblad, J (1984) Motivating the British construction industry. Construction Management and Economics, 2(02), 145-56.

Flanagan, R, Norman, G and Worrall, H (1995) Trade performance of the UK building materials and components industries. Engineering, Construction and Architectural Management, 2(02), 141–62.

Fouchal, F, Ellis, K, Hassan, T and Firth, S (2013) ICT-enabled energy efficiency – a lens onto practices of other sectors. Smart and Sustainable Built Environment, 2(02), 158-78.

Furusaka, S and Gray, C (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(02), 157-76.

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(02), 52–68.

Goodhew, S, Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(02), 85–104.

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(02), 133-44.

Hardie, M, Allen, J and Newell, G (2013) Environmentally driven technical innovation by Australian construction SMEs. Smart and Sustainable Built Environment, 2(02), 179-91.

Hayles, C S, Dean, M, Lappin, S A and McCullough, J E (2013) Climate change adaptation: A decision support framework to encourage environmentally responsible behaviour. Smart and Sustainable Built Environment, 2(02), 192-214.

Holley, P W and Dagg, C (2006) Development of expanded multidisciplinary collaborative experiences across construction and design curricula. International Journal of Construction Education and Research, 2(02), 91-111.

Ibem, E O, Aduwo, E B and Uwakonye, O (2012) Adequacy of incremental construction strategy for housing low-income urban residents in Ogun State, Nigeria. Built Environment Project and Asset Management, 2(02), 182-94.

Jane, B (2010) Using banks: the effect of national attitudes to public intervention in mortgage lending and eviction in French and English law. International Journal of Law in the Built Environment, 2(02), 118–37.

Jensen, W and Fischer, B (2006) Student perspectives on the qualities/behaviors of faculty that contribute most significantly to student learning. International Journal of Construction Education and Research, 2(02), 67-73.

Juli, P (2010) Housing discrimination and minorities in European cities: the Catalan Right to Housing Act 2007. International Journal of Law in the Built Environment, 2(02), 138–56.

Jumat, A R, Coffey, V and Skitmore, M (2012) Stakeholder service delivery expectations of military facilities management. Built Environment Project and Asset Management, 2(02), 146-66.

Korstanje, M E (2011) Reconnecting with poverty: new challenges of disaster management. International Journal of Disaster Resilience in the Built Environment, 2(02), 165-77.

Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(02), 38–51.

Li, H, Chen, Z, Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(02), 71–81.

Loosemore, M and Teo, M (2002) The crisis management practices of Australian construction companies. Construction Economics and Building, 2(02), 15-26.

Lowe, J G (1983) Control of direct labour: a critical review. Construction Papers, 2(02), 53–60.

Mahadkar, S, Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(02), 127-45.

Miller, K R, Hutchings, D M and Newitt, J S (2006) Study of top 500 Design firms' plans to adopt MasterFormat(TM) 2004. International Journal of Construction Education and Research, 2(02), 143-50.

Mills, A, Smith, J and Love, P (2002) Barriers to the development of SME's in the Australian construction industry. Construction Economics and Building, 2(02), 71-79.

Molad, C and Back, W E (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(02), 93–104.

Mostafavi, A, Abraham, D M and Lee, J (2012) System-of-systems approach for assessment of financial innovations in infrastructure. Built Environment Project and Asset Management, 2(02), 250-65.

Nguyen, T H, McIntyre, C and Diab, M (2006) Assessing learning and teaching performance of a construction capstone course. International Journal of Construction Education and Research, 2(02), 151-66.

Ofori, G (1984) Improving the construction industry in declining developing economies. Construction Management and Economics, 2(02), 127-32.

Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: user perspective. Built Environment Project and Asset Management, 2(02), 167-81.

Omar, E A A and Mangin, J-C (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(02), 83–101.

Padraic, K (2010) Can housing rights be applied to modern housing systems?. International Journal of Law in the Built Environment, 2(02), 103–17.

Park, Y-I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(02), 195-216.

Pilgrim, M, Bouchlaghem, D, Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(02), 117–30.

Poh, P S H and Horner, R M W (1995) Cost-significant modelling: potential for use in South-East Asia. Engineering, Construction and Architectural Management, 2(02), 121–39.

Rahman, M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(02), 217-33.

Reszka, M and Edwards, P J (1997) Joint ventures: a construction project case study. Journal of Financial Management of Property and Construction, 2(02), 5–20.

Rosowsky, D V (2011) Recovery: rebuilding a resilient housing stock. International Journal of Disaster Resilience in the Built Environment, 2(02), 139-47.

Runeson, G and Bennett, J (1983) Tendering and the price level in the New Zealand building industry. Construction Papers, 2(02), 29–35.

Scott, R (1995) Invited paper: Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(02), 83–92.

Siew, R Y J, Balatbat, M C A and Carmichael, D G (2013) A review of building/infrastructure sustainability reporting tools (SRTs). Smart and Sustainable Built Environment, 2(02), 106-39.

Songer, A D, Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(02), 69–82.

Tran, Dand Skitmore, M (2002) The impact of culture on international management: a survey of project communications in Singapore. Construction Economics and Building, 2(02), 36-47.

Tyler, J and Singh, A (2011) Enhancing post-earthquake disaster resilience. International Journal of Disaster Resilience in the Built Environment, 2(02), 103-17.

Walker, A and Hughes, W (1984) Private industrial project management: a systems-based case study. Construction Management and Economics, 2(02), 93-110.

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: an Australian experience. Journal of Construction Procurement, 2(02), 4–18.

Weippert, A, Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: a case study analysis. Construction Innovation, 2(02), 103–16.

Wolfgang, A and Alexis, M (2010) Designing a new rental housing law for Romania. International Journal of Law in the Built Environment, 2(02), 157–77.

Woodhead, R (1997) Exploring the hurdle rate in preparation for a Value Management Workshop Planning Session. Journal of Financial Management of Property and Construction, 2(02), 21–38.

Woodhead, W D and Salomonsson, G D (1983) A computer based system for recording and analysing building site labour input. Construction Papers, 2(02), 47–52.

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(02), 27-35.

Xin, J and Lam, K (2002) Building a house prices forecasting model in Hong Kong. Construction Economics and Building, 2(02), 57-70.