ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 60 results ...

Agapiou, A (2015) The factors influencing mediation referral practices and barriers to its adoption: A survey of construction lawyers in England and Wales. International Journal of Law in the Built Environment, 7(03), 231-47.

Aliakbarlou, S, Wilkinson, S and Costello, S B (2017) Exploring construction client values and qualities: Are these two distinct concepts in construction studies?. Built Environment Project and Asset Management, 7(03), 234-52.

Boehm, S and Kopec, D (2016) Interior design as a post-disaster team partner. International Journal of Disaster Resilience in the Built Environment, 7(03), 276-89.

Carrillo, P and Heavey, I (2000) UK contractors’ acquisitions strategy for Central and Eastern Europe. Engineering, Construction and Architectural Management, 7(03), 322–8.

Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(03), 235-47.

Connell, A and Mason, J (2015) Isn’t all loss consequential?: A review of recent case law and its relevance to contractual practices within the built environment. International Journal of Law in the Built Environment, 7(03), 176-94.

Crossley, B J (2015) Inter-organisational relationship trust repair: a ranked Delphi study with UK professionals. International Journal of Law in the Built Environment, 7(03), 195-213.

De Silva, N, Weerasinghe, R P N P, Madhusanka, H W N and Kumaraswamy, M (2017) Relationally integrated value networks for total facilities management. Built Environment Project and Asset Management, 7(03), 313-29.

Delaney, F T and Wamuziri, S C (2002) Efficiency and performance effects of mergers and acquisitions in the construction industry. Journal of Financial Management of Property and Construction, 7(03), 141–50.

Dojutrek, M S, Labi, S and Dietz, J E (2016) A multi-criteria methodology for measuring the resilience of transportation assets. International Journal of Disaster Resilience in the Built Environment, 7(03), 290-301.

Du, J and El-Gafy, M (2011) Feasibility Analytical Mapping (FAM) for the Bidding Decision: A Graphic Bidding Decision Making Model Based on Multidimensional Scaling and Discriminant Analysis. International Journal of Construction Education and Research, 7(03), 198–209.

Griffith, A (2000) Integrated management systems: a single management system solution for project control?. Engineering, Construction and Architectural Management, 7(03), 232–40.

Hetherton, T and Charlson, J (2015) When statutes collide: potential recovery of own party adjudication costs. International Journal of Law in the Built Environment, 7(03), 214-30.

Holt, L (1989) Project management excellence: the Shell Stanney case. Construction Management and Economics, 7(03), 217-34.

Idoro, G I (2009) Clients' perception of construction project leaders in the Nigerian banking industry. Journal of Engineering, Design and Technology, 7(03), 264–81.

Irajifar, L, Sipe, N and Alizadeh, T (2016) The impact of urban form on disaster resiliency: A case study of Brisbane and Ipswich, Australia. International Journal of Disaster Resilience in the Built Environment, 7(03), 259-75.

Ishai, E (1989) Architectural and economic consideration in the design of prefabricated façade components (exterior walls). Construction Management and Economics, 7(03), 189-202.

Istijono, B, Hakam, A and Ophiyandri, T (2016) Landslide hazard of Maninjau area. International Journal of Disaster Resilience in the Built Environment, 7(03), 302-12.

Jayantha, W M and Ganesan, S (2002) Econometric analysis of office space market's response to service sector growth in Hong Kong. Journal of Financial Management of Property and Construction, 7(03), 175–96.

Jayaram, S (2009) Development of payload housing for temperature and pressure control of bio fuel cells for space applications. Journal of Engineering, Design and Technology, 7(03), 323–34.

Kamara, J M (2017) Maintaining focus on clients’ requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(03), 271-83.

Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(03), 197–202.

Kim, M P and Adams, K (1989) An expert system for construction contract claims. Construction Management and Economics, 7(03), 249-62.

Kishk, M (2002) Towards effective consideration of non-financial factors in the design and management of construction assets. Journal of Financial Management of Property and Construction, 7(03), 163–74.

Ku, K and Taiebat, M (2011) BIM Experiences and Expectations: The Constructors' Perspective. International Journal of Construction Education and Research, 7(03), 175–97.

Kumaraswamy, M, Mahesh, G, Mahalingam, A, Loganathan, S and Kalidindi, S N (2017) Developing a clients’ charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(03), 253-70.

Lahdenperä, P and Tanhuanpää, V-P (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(03), 267–77.

Lam, K C, Ng, S T, Hu, T, Skitmore, M R and Cheung, S-O (2000) Decision support system for contractor pre-qualification—artificial neural network model. Engineering, Construction and Architectural Management, 7(03), 251–66.

Lee, A and Sexton, M G (2007) nD modelling: industry uptake considerations. Construction Innovation, 7(03), 288–302.

Li, H, Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(03), 211–20.

Male, S and Kelly, J E (1989) Organizational responses to public sector clients in Canada to the implementation of value management: lessons for the UK construction industry. Construction Management and Economics, 7(03), 203-16.

Motjolopane, B P and Zyl, R v (2009) A review of rectenna models for electromagnetic energy harvesting. Journal of Engineering, Design and Technology, 7(03), 282–92.

Nageim, H A, Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(03), 240–53.

Nicholas, J, Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers’ financial turnover. Engineering, Construction and Architectural Management, 7(03), 221–31.

Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(03), 263-79.

Ofori, G and Chan, S L (2000) Growth paths of construction enterprises in Singapore, 1980–98. Engineering, Construction and Architectural Management, 7(03), 307–21.

Oliveira, L A and Melhado, S B (2011) Conceptual Model for the Integrated Design of Building Façades. Architectural Engineering and Design Management, 7(03), 190–204.

Othman, A A E and Sirbadhoo, N (2009) An innovative partnership framework for sustainable development of rural areas in South Africa: The role of project management firms. Journal of Engineering, Design and Technology, 7(03), 243–63.

Pärn, E A and Edwards, D (2017) Vision and advocacy of optoelectronic technology developments in the AECO sector. Built Environment Project and Asset Management, 7(03), 330-48.

Palaneeswaran, E and Kumaraswamy, M M (2000) Benchmarking contractor selection practices in public-sector construction—a proposed model. Engineering, Construction and Architectural Management, 7(03), 285–99.

Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(03), 151–62.

Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(03), 274–87.

Sanusi, K O and Oliver, G J (2009) Effects of grain size on mechanical properties of nanostructured copper alloy by severe plastic deformation (SPD) process. Journal of Engineering, Design and Technology, 7(03), 335–41.

Sarshar, M, Haigh, R, Finnemore, M, Aouad, G F, Barrett, P, Baldry, D and Sexton, M (2000) SPICE: a business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(03), 241–50.

Schultz, A L (2017) Integrating lean and visual management in facilities management using design science and action research. Built Environment Project and Asset Management, 7(03), 300-12.

Sheriff, A M, Bouchlaghem, D, El-Hamalawi, A and Yeomans, S (2011) Developing a Metadata Standard for Multimedia Content Management: A Case Study. Architectural Engineering and Design Management, 7(03), 157–76.

Siva, J P S and London, K (2011) Investigating the Role of Client Learning for Successful Architect–Client Relationships on Private Single Dwelling Projects. Architectural Engineering and Design Management, 7(03), 177–89.

Slattery, D K and Sumner, M R (2011) Leadership Characteristics of Rising Stars in Construction Project Management. International Journal of Construction Education and Research, 7(03), 159–74.

Smith, J P, Miller, K, Christofferson, J and Hutchings, M (2011) Best Practices for Dealing with Price Volatility in Utah's Residential Construction Market. International Journal of Construction Education and Research, 7(03), 210–25.

Smyth, H and Kioussi, S (2011) Architecture Firms and the Role of Brand Management. Architectural Engineering and Design Management, 7(03), 205–17.

Ssegawa, J K and Rwelamila, P D (2009) The research skill factor as a cause for high postgraduate attrition rate. Journal of Engineering, Design and Technology, 7(03), 293–322.

Stewart, R A and Waroonkun, T (2007) Benchmarking construction technology transfer in Thailand. Construction Innovation, 7(03), 218–39.

Stone, M L, Johnson, P W and Leopard, T A (2011) Using Design-Based Change Orders as a Lessons Learned Metric in University Dormitory Construction. International Journal of Construction Education and Research, 7(03), 226–40.

Taheri Tafti, M and Tomlinson, R (2016) Long-term socio-spatial transformation of earthquake-affected neighbourhoods in Bhuj: Who stayed, who left and who moved in?. International Journal of Disaster Resilience in the Built Environment, 7(03), 230-58.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(03), 278–84.

Weerasinghe, R P N P and Sandanayake, Y G (2017) Collaborative facilities management model: Sri Lankan perspective. Built Environment Project and Asset Management, 7(03), 284-99.

Whaley, A, McAdam, B and Crowe, P (2015) The acceleration dilemma: can English law accommodate constructive acceleration?. International Journal of Law in the Built Environment, 7(03), 248-67.

Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(03), 254–73.

Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(03), 300–6.

Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: a review of current research. Journal of Financial Management of Property and Construction, 7(03), 203–14.