ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Abdelmageed, S, Abdelkhalek, S, Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), 1407–18.

Abdelwahab, M A and Nassar, A H (2024) Legal barriers and associated solutions of BIM implementation in the Egyptian AEC industry. International Journal of Construction Management, 24(13), 1431–43.

Babon-Ayeng, P, Kissi, E, Tannor, R A, Aigbavboa, C and Badu, E (2024) Critical success factors (CSFs) for the adoption of green construction concepts in road construction in Ghana. International Journal of Construction Management, 24(13), 1465–74.

Barajei, C, Appiah-Kubi, E, Kheni, N A, Yalley, P P K and Iddrisu, W (2024) Success factors of pre-construction stages of Ghanaian public road construction project life cycle. International Journal of Construction Management, 24(13), 1444–53.

Ebekozien, A, Aigbavboa, C, Samsurijan, M S, Radin Firdaus, R B and Rohayati, M I (2024) Investigating safety violations on Nigerian construction sites. International Journal of Construction Management, 24(13), 1454–64.

Hesselink, L, Vahdatikhaki, F, Harmsen, Y and Voordijk, H (2024) Usability analysis of virtual-reality-enabled digital twin for the inspection of sewage pumping stations. International Journal of Construction Management, 24(13), 1419–30.

Manoharan, K, Dissanayake, P, Pathirana, C, Deegahawature, D and Silva, R (2024) A training guide for the reinforcement of continuous professional development of engineers and project managers on performance and productivity improvement practices in construction. International Journal of Construction Management, 24(13), 1475–84.

Pittri, H, Agyekum, K, Ayebeng Botchway, E, Opoku, A and Bimpli, I (2024) Design for deconstruction (dfd) implementation among design professionals: Empirical evidence from Ghana. International Journal of Construction Management, 24(13), 1387–97.

Son, P V H and Khoi, L N Q (2024) Application of slime mold algorithm to optimize time, cost and quality in construction projects. International Journal of Construction Management, 24(13), 1375–86.

Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), 1398–406.