ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 42 results ...

Adekunye, O J and Oke, A E (2023) Applicable areas of biomimicry principles for sustainable construction in Nigeria. Construction Innovation, 23(04), 713-32.

Ajayi, S O, Oyedele, L O, Kadiri, K O, Akinade, O O, Bilal, M, Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(04), 464-90.

Al-Sobiei, O S, Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(04), 423-30.

Almarri, K (2023) The value for money factors and their interrelationships for smart city public–private partnerships projects. Construction Innovation, 23(04), 815-32.

Asare, E, Owusu-Manu, D G, Ayarkwa, J, Edwards, D J and Martek, I (2023) Thematic literature review of working capital management in the construction industry: trends and research opportunities. Construction Innovation, 23(04), 775-91.

Bhagwat, K and Delhi, V S K (2023) Review of construction safety performance measurement methods and practices: A science mapping approach. International Journal of Construction Management, 23(04), 729–43.

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(04), 686–96.

Carbonara, N, Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(04), 491-510.

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(04), 355-64.

Dabirian, S, Moussazadeh, M, Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(04), 606–18.

Dainty, A R J, Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: the perspective of small-medium-sized firms. Construction Management and Economics, 23(04), 387-98.

Das, R and Nakano, M (2023) A multi-criteria decision-making model using socio-technical attributes for transportation bridge maintenance prioritisation. International Journal of Construction Management, 23(04), 579–85.

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(04), 377-85.

Ho, P H K (2016) Labour and skill shortages in Hong Kong’s construction industry. Engineering, Construction and Architectural Management, 23(04), 533-50.

Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(04), 679–85.

Karadag, I, Güzelci, O Z and Alaçam, S (2023) EDU-AI: a twofold machine learning model to support classroom layout generation. Construction Innovation, 23(04), 898-914.

Khanh, H D, Kim, S Y, Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(04), 596–605.

Liu, S L, Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(04), 347-53.

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(04), 428-47.

Lu, W, Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(04), 448-63.

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(04), 511-32.

Manoharan, K, Dissanayake, P, Pathirana, C, Deegahawature, D and Silva, R (2023) A guiding model for developing construction training programmes focusing on productivity and performance improvement for different qualification levels. Construction Innovation, 23(04), 733-56.

Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(04), 629–38.

Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(04), 409-22.

Mohammadrezaytayebi, S, Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(04), 586–95.

Momade, M H, Shahid, S, Falah, G, Syamsunur, D and Estrella, D (2023) Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management, 23(04), 697–707.

Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(04), 399-408.

Osei-Asibey, D, Ayarkwa, J, Acheampong, A, Adinyira, E and Amoah, P (2023) Impacts of accidents and hazards on the Ghanaian construction industry. International Journal of Construction Management, 23(04), 708–17.

Perera, H P, Perera, B A K S and Palihakkara, A D (2023) Financial and economic risk management in coastal land reclamation projects. Construction Innovation, 23(04), 878-97.

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(04), 365-75.

Reynoso Vanderhorst, H D, Heesom, D, Suresh, S, Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (UAS) services in a decentralised system: case of the Dominican Republic. Construction Innovation, 23(04), 833-57.

Sal Moslehian, A, Kocaturk, T, Andrews, F and Tucker, R (2023) The nature of innovation in hospital building design: a mixed grounded theory study. Construction Innovation, 23(04), 792-814.

Seyis, S and Sönmez, A M (2023) Analysis of the benefits, challenges and risks for the integrated use of BIM, RFID and WSN: a mixed method research. Construction Innovation, 23(04), 858-77.

Shandraseharan, A and Kulatunga, U (2023) Social media for disaster management: The Sri Lankan context. International Journal of Construction Management, 23(04), 648–55.

Thneibat, M M and Al-Shattarat, B (2023) Critical success factors for value management techniques in construction projects: Case in Jordan. International Journal of Construction Management, 23(04), 669–78.

Thunberg, M and Fredriksson, A (2023) A model for visualizing cost shifts when introducing construction logistics setups. Construction Innovation, 23(04), 757-74.

Timm, J F G, Maciel, V G and Passuello, A (2023) Green public procurement model for environmental assessment of constructive systems. International Journal of Construction Management, 23(04), 718–28.

Tsz Wai, C, Wai Yi, P, Ibrahim Olanrewaju, O, Abdelmageed, S, Hussein, M, Tariq, S and Zayed, T (2023) A critical analysis of benefits and challenges of implementing modular integrated construction. International Journal of Construction Management, 23(04), 656–68.

Turkoglu, H, Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(04), 619–28.

Upstill-Goddard, J, Glass, J, Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(04), 407-27.

Wubet, W A, Burrow, M and Ghataora, G (2023) Risks affecting the performance of Ethiopian domestic road construction contractors. International Journal of Construction Management, 23(04), 639–47.

Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(04), 431-41.