ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 42 results ...
Adetooto, J, Windapo, A and Pomponi, F (2024) The use of alternative building technologies as a sustainable affordable housing solution: Perspectives from South Africa. Journal of Engineering, Design and Technology, 22(05), 1447-63.
Adetooto, J, Windapo, A, Pomponi, F, Companie, F, Alade, K and Mtya, A (2024) Strategies to promote the acceptance of sandbag building technology for sustainable and affordable housing delivery: The South African case. Journal of Engineering, Design and Technology, 22(05), 1505-22.
Adu Gyamfi, T, Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(05), 1544-69.
Afful, A E, Ayarkwa, J, Acquah, G K K, Ossei Assibey, A A D and Osei-Asibey, D (2024) Identifying the capacity needs of built environment professionals to deliver environmentally sustainable buildings: A scientometric review. Journal of Engineering, Design and Technology, 22(05), 1464-90.
Akanmu, A and Anumba, C J (2015) Cyber-physical systems integration of building information models and the physical construction. Engineering, Construction and Architectural Management, 22(05), 516-35.
Al-Abbadi, G M and Agyekum-Mensah, G (2022) The effects of motivational factors on construction professionals productivity in Jordan. International Journal of Construction Management, 22(05), 820-31.
Albalkhy, W and Sweis, R (2022) Assessing lean construction conformance amongst the second-grade Jordanian construction contractors. International Journal of Construction Management, 22(05), 900-12.
Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(05), 493-515.
Amoah, C, Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(05), 949-60.
Ayd?n, D and M?hlayanlar, E (2024) Determination of the significance of project delivery attributes (PDAs) on sustainable projects in Turkey. Journal of Engineering, Design and Technology, 22(05), 1682-703.
Clarke, L and Herrmann, G (2004) Cost vs. production: disparities in social housing construction in Britain and Germany. Construction Management and Economics, 22(05), 521-32.
Das, M, Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(05), 551-72.
Ebekozien, A and Aigbavboa, C O (2024) Improving quantity surveying education through continually updating curriculum digitalisation to meet industry requirements. Journal of Engineering, Design and Technology, 22(05), 1523-43.
Ejidike, C C, Mewomo, M C and Anugwo, I C (2024) Assessment of construction professionals' awareness of the smart building concepts in the Nigerian construction industry. Journal of Engineering, Design and Technology, 22(05), 1491-504.
Elmasoudi, I, Ibrahim, M G, Tokimatsu, K and Elbeltagi, E (2022) Environmental impact assessment model for buildings' construction activities. International Journal of Construction Management, 22(05), 849-60.
Gil, N, Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(05), 495-508.
Govender, R, Saba, G, Ham, N, Hou, L, Moon, S and Kim, J J (2022) Appraisal of building information modeling (BIM) curriculum for early-career construction-industry professionals: Case study at c educational institute in Korea. International Journal of Construction Management, 22(05), 891-9.
Hossain, M A, Raiymbekov, D, Nadeem, A and Kim, J R (2022) Delay causes in Kazakhstan's construction projects and remedial measures. International Journal of Construction Management, 22(05), 801-19.
Ikediashi, D I (2024) Facilities management strategic roles and services quality performance in Nigeria’s banking sector. Journal of Engineering, Design and Technology, 22(05), 1591-615.
Kakar, A S, Hasan, A, Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(05), 1570-90.
Kavishe, N and Chileshe, N (2022) Development and validation of public-private partnerships framework for delivering housing projects in developing countries: A case of Tanzania. International Journal of Construction Management, 22(05), 873-90.
Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(05), 474-92.
Kiani, M, Bagheri, M, Ebrahimi, A and Alimohammadlou, M (2022) A model for prioritizing outsourceable activities in universities through an integrated fuzzy-MCDM method. International Journal of Construction Management, 22(05), 784-800.
Lewis, T M (2004) The construction industry in the economy of Trinidad & Tobago. Construction Management and Economics, 22(05), 541-9.
Li, H, Chan, G, Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(05), 536-50.
Maghrebi, M, Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(05), 573-90.
Manoharan, K, Dissanayake, P, Pathirana, C, Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour: Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(05), 1655-81.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(05), 913-28.
Miller, C J M, Packham, G A, Pickernell, D G and Mcgovern, M (2004) Building for the future: the potential importance of the construction industry in Welsh economic development policy. Construction Management and Economics, 22(05), 533-40.
Ng, F P and Björnsson, H C (2004) Using real option and decision analysis to evaluate investments in the architecture, construction and engineering industry. Construction Management and Economics, 22(05), 471-82.
Ng, S T, Cheung, S-O, Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(05), 483-93.
Ogunsanya, O A, Aigbavboa, C O, Thwala, D W and Edwards, D J (2022) Barriers to sustainable procurement in the Nigerian construction industry: An exploratory factor analysis. International Journal of Construction Management, 22(05), 861-72.
Olasunkanmi, F F O, Ikediashi, D I and Ajiero, I R (2024) Assessing the factors of transactional leadership style for construction projects: A case of Nigerian construction industry. Journal of Engineering, Design and Technology, 22(05), 1637-54.
Panojan, P, Perera, B A K S and Dilakshan, R (2022) Work-life balance of professional quantity surveyors engaged in the construction industry. International Journal of Construction Management, 22(05), 751-68.
Phua, F T T (2004) Modelling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives. Construction Management and Economics, 22(05), 451-9.
Poon, C S, Yu, A T W and Jaillon, L (2004) Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(05), 461-70.
Rosayuru, H D R R, Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(05), 769-83.
Shi, J, Lu, Z, Xu, H and Cui, J (2024) System dynamic-based remanufacturing economic analysis model of used automobile engine under two recycling modes. Journal of Engineering, Design and Technology, 22(05), 1433-46.
Vo, H (2024) Design creativity in Industry 4.0: Gravity Sketch and 3D printing in a Luminaire design project. Journal of Engineering, Design and Technology, 22(05), 1413-32.
Wu, C-H, Hsieh, T-Y, Cheng, W-L and Lu, S-T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(05), 509-20.
Wu, G, Liu, C, Zhao, X, Zuo, J and Zheng, J (2022) Effects of fairness perceptions on conflicts and project performance in Chinese megaprojects. International Journal of Construction Management, 22(05), 832-48.
Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(05), 929-48.