ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 51 results ...

Abisuga, A, O, Famakin, I, O and Oshodi, O, S (2016) Educational building conditions and the health of users . Construction Economics and Building, 16(04), 19-34.

Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N A (2009) Competencies required by project managers for housing construction in Ghana: Implications for CPD agenda. Engineering, Construction and Architectural Management, 16(04), 353–75.

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(04), 459-70.

Alfieri, E, Seghezzi, E, Sauchelli, M, Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(04), 247–69.

Aluko, R, O, Adenuga, O, A, Kukoyi, P, O, Soyingbe, A, A and Oyedeji, J, O (2016) Predicting the academic success of architecture students by pre-enrolment requirement: using machine-learning techniques . Construction Economics and Building, 16(04), 86-98.

Alves, S and English, J (2018) Female students’ preparedness for a male-dominated workplace. Journal of Engineering, Design and Technology, 16(04), 581–95.

Anderson, A, Dossick, C S and Osburn, L (2020) Curriculum to Prepare AEC Students for BIM-Enabled Globally Distributed Projects. International Journal of Construction Education and Research, 16(04), 270–89.

Attar, A, Boudjakdji, M A, Bhuiyan, N, Grine, K, Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(04), 376–91.

Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry. Journal of Engineering, Design and Technology, 16(04), 533–56.

Benjaoran, V and Bhokha, S (2009) Enhancing visualization of 4D CAD model compared to conventional methods. Engineering, Construction and Architectural Management, 16(04), 392–408.

Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost-flow forecasting. Construction Management and Economics, 16(04), 471-9.

Crosthwaite, D (1998) Note - The internationalization of British construction companies 1990-1996: an empirical analysis. Construction Management and Economics, 16(04), 389-95.

Edwards, D J and Holt, G D (2009) New stability field tests for construction excavators. Engineering, Construction and Architectural Management, 16(04), 337–52.

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(04), 443-6.

El-Sayegh, S M and Rabie, M M (2016) Modified price plus time bi-parameter bidding model incorporating float loss impact. International Journal of Construction Management, 16(04), 267-80.

Fiorineschi, L (2018) Abstraction framework to support students in learning creative conceptual design. Journal of Engineering, Design and Technology, 16(04), 616–36.

Fung, I W H, Tam, V W Y, Sing, C P, Tang, K K W and Ogunlana, S O (2016) Psychological climate in occupational safety and health: The safety awareness of construction workers in South China. International Journal of Construction Management, 16(04), 315-25.

Gelaw, M, Ramulu, P J, Hailu, D and Desta, T (2018) Manufacturing and mechanical characterization of square bar made of aluminium scraps through friction stir back extrusion process. Journal of Engineering, Design and Technology, 16(04), 596–615.

Gowda, R, Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(04), 417-32.

Hosseini, M R, Chileshe, N, Baroudi, B, Zuo, J and Mills, A (2016) Factors affecting perceived level of virtuality in hybrid construction project teams: A qualitative study. Construction Innovation, 16(04), 460-82.

Hosseinian S, M (2016) An optimal time incentive/disincentive -based compensation in contracts with multiple agents . Construction Economics and Building, 16(04), 35-53.

Ibem, E, O, Aduwo, E, B, Tunji-Olayeni, P, Ayo-Vaughan, E, A and Uwakonye, U, O (2016) Factors influencing e-Procurement adoption in the Nigerian building industry . Construction Economics and Building, 16(04), 54-67.

Ji, Y, Lee, A and Fernando, T (2020) Dynamic thermal simulation of advanced natural ventilation in buildings: current and future usage, UK exemplar. Architectural Engineering and Design Management, 16(04), 293–309.

Kululanga, G K (2009) Construction process improvement through cognitive power under team generative learning. Engineering, Construction and Architectural Management, 16(04), 307–24.

Kwofie, T E, Aigbavboa, C O and Mpambela, J S (2018) Improving continuing professional development compliance among construction professionals through integrated strategies in South Africa. Journal of Engineering, Design and Technology, 16(04), 637–53.

Lai, K S, Yusof, N A and Kamal, E M (2016) Innovation orientation in architectural firms. Construction Innovation, 16(04), 425-45.

Langston, C and Ghanbaripour, A, N (2016) A Management Maturity Model (MMM) for project-based organisational performance assessment . Construction Economics and Building, 16(04), 68-85.

Lingard, H and Rowlinson, S M (1998) Behaviour-based safety management in Hong Kong's construction industry: the results of a field study. Construction Management and Economics, 16(04), 481-8.

Love, H B, Ozbek, M E and Cross, J E (2020) Assessment of the Development of Social and Learning Networks in Construction Management Courses Using Social Network Analysis. International Journal of Construction Education and Research, 16(04), 290–310.

Love, P E D and Smith, J (2016) Error management: Implications for construction. Construction Innovation, 16(04), 418-24.

Manamgoda, M G N, Perera, B and Perera, C S R (2018) Impact of interest rates of bank loans on road construction: the case of Sri Lanka. Journal of Engineering, Design and Technology, 16(04), 518–32.

Marsh, L and Finch, E (1998) Note - Attitudes towards auto-ID technologies within the UK construction industry. Construction Management and Economics, 16(04), 383-8.

McCabe, S, Rooke, J D, Seymour, D E and Brown, P (1998) Quality managers, authority and leadership. Construction Management and Economics, 16(04), 447-57.

Morales-Beltran, M and Yildiz, B (2020) Integrating configuration-based seismic design principles into architectural education: teaching strategies for lecture courses. Architectural Engineering and Design Management, 16(04), 310–28.

Mostafa, S, Chileshe, N and Abdelhamid, T (2016) Lean and agile integration within offsite construction using discrete event simulation: A systematic literature review. Construction Innovation, 16(04), 483-525.

Motawa, I and Kaka, A (2009) Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(04), 325–36.

Noriega, M S, Valles, C A, Torres-Argüelles, V, Martínez, G E and Hernández, G A (2016) Six sigma improvement project in a concrete block plant. Construction Innovation, 16(04), 526-44.

Notman, D, Norman, G, Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-1995). Construction Management and Economics, 16(04), 409-16.

Ofori, G and Debrah, Y A (1998) Flexible management of operatives in the Singapore construction industry. Construction Management and Economics, 16(04), 397-408.

Rahmat, A, Che Ibrahim, C K I and Belayutham, S (2020) Exploring the Quantitative Measures for Multi-Organization Integration in Malaysian Construction Projects. International Journal of Construction Education and Research, 16(04), 233–50.

Savolainen, J M, Saari, A, Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(04), 674–91.

Shafiee, S, Piroozfar, P, Hvam, L, Farr, E R, Huang, G Q, Pan, W, Kudsk, A, Rasmussen, J B and Korell, M (2020) Modularisation strategies in the AEC industry: a comparative analysis. Architectural Engineering and Design Management, 16(04), 270–92.

Sharma, S, Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(04), 299-314.

Shi, J and AbouRizk, S M (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(04), 489-98.

Siew, R Y J, Balatbat, M C A and Carmichael, D G (2016) A proposed framework for assessing the sustainability of infrastructure. International Journal of Construction Management, 16(04), 281-98.

Simatupang, T M and Sridharan, R (2016) A critical analysis of supply chain issues in construction heavy equipment. International Journal of Construction Management, 16(04), 326-38.

Sweis, G J, Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(04), 446-59.

Teo, A, L, E, Ofori, G, Tjandra, I, K and Kim, H (2016) Design for safety: theoretical framework of the safety aspect of BIM system to determine the safety index . Construction Economics and Building, 16(04), 1-18.

Turner, M and Simmons, D R (2020) Taking a Partnered Approach to Managing Academic Stress: An Undergraduate Study. International Journal of Construction Education and Research, 16(04), 251–69.

Ulubeyli, S, Kazaz, A and Sahin, S (2018) Survival of construction SMEs in macroeconomic crises. Journal of Engineering, Design and Technology, 16(04), 654–73.

Umeokafor, N and Windapo, A (2018) Challenges to and opportunities for establishing a qualitative approach to Built Environment research in higher education institutions. Journal of Engineering, Design and Technology, 16(04), 557–80.