ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 62 results ...

Hosseini, M, R, Chileshe, N, Jepson, J and M,Arashpour (2016) Critical success factors for implementing risk management systems in developing countries . Construction Economics and Building, 16(01), 18-32.

Panahi, B, Preece, C, N, Wan, N, and Zakaria, W, N, W. (2016) Personal-organisational value conflicts and job satisfaction of internal construction stakeholders . Construction Economics and Building, 16(01), 1-17.

Ankrah, N A, Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: an empirical investigation. Engineering, Construction and Architectural Management, 16(01), 26–47.

Arif, M, Egbu, C, Alom, O and Khalfan, M M A (2009) Measuring knowledge retention: a case study of a construction consultancy in the UAE. Engineering, Construction and Architectural Management, 16(01), 92–108.

Babatunde, S O, Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(01), 81-110.

Barrows, M, Clevenger, C M, Abdallah, M and Wu, W (2020) Value of Certifications when Seeking Construction Employment. International Journal of Construction Education and Research, 16(01), 61–79.

Bildsten, L, Björnfot, A and Sandberg, E (2011) Value-driven purchasing of kitchen cabinets in industrialized housing. Journal of Financial Management of Property and Construction, 16(01), 73–83.

Bröchner, J and Lagerqvist, O (2016) From ideas to construction innovations: firms and universities collaborating. Construction Economics and Building, 16(01), 76-89.

Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(01), 57-69.

Chau, K W, Raftery, J and Walker, A (1998) Note - The baby and the bathwater: research methods in construction management. Construction Management and Economics, 16(01), 99-104.

Chinyio, E A, Olomolaiye, P O, Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(01), 91-8.

Chinyio, E, Suresh, S and Salisu, J B (2018) The impacts of monetary rewards on public sector employees in construction: A case of Jigawa state in Nigeria. Journal of Engineering, Design and Technology, 16(01), 125-42.

Criado-Perez, C, Collins, C G, Jackson, C J, Oldfield, P, Pollard, B and Sanders, K (2020) Beyond an ‘informed opinion’: evidence-based practice in the built environment. Architectural Engineering and Design Management, 16(01), 23–40.

Darrington, J W and Howell, G A (2011) Motivation and incentives in relational contracts. Journal of Financial Management of Property and Construction, 16(01), 42–51.

Dawood, N N (1998) Estimating project and activity duration: a risk management approach using network analysis. Construction Management and Economics, 16(01), 41-8.

Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(01), 33-49.

Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services cost estimation: comment. Construction Management and Economics, 16(01), 105-8.

Enshassi, A, Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(01), 61–72.

Famakin, I O and Abisuga, A O (2016) Effect of path-goal leadership styles on the commitment of employees on construction projects. International Journal of Construction Management, 16(01), 67-76.

Harriss, C (1998) Why research without theory is not research: a reply to Seymour et al.. Construction Management and Economics, 16(01), 113-6.

Hassan, N M, Al Maazmi, T, Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(01), 67-80.

Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(01), 19–30.

Holt, G D (2016) Historical British antecedents of innovative construction project organisation and social structures. Construction Innovation, 16(01), 46-66.

Jaafar, M, Nuruddin, A R and Bakar, S P S A (2016) Managerial capabilities of housing developers: Building the competitive advantage of a firm. International Journal of Construction Management, 16(01), 27-38.

Jose, S-G and Christine, P (2011) Value theory in lean construction. Journal of Financial Management of Property and Construction, 16(01), 8–18.

Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(01), 48–60.

Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(01), 8–25.

Kermanshachi, S, Dao, B, Rouhanizadeh, B, Shane, J and Anderson, S (2020) Development of the Project Complexity Assessment and Management Framework for Heavy Industrial Projects. International Journal of Construction Education and Research, 16(01), 24–42.

Kulkarni, S, Chapman, C, Shah, H, Parn, E A and Edwards, D J (2018) Designing an efficient tidal turbine blade through bio-mimicry: a systematic review. Journal of Engineering, Design and Technology, 16(01), 101-24.

Kumar, S, Dhingra, A and Singh, B (2018) Lean-Kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(01), 143-60.

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(01), 17-29.

Leathem, T M (2020) Development and Evaluation of a Model for Clarifying ACCE Student Learning Outcomes. International Journal of Construction Education and Research, 16(01), 43–60.

Lou, E C, Lee, A and Goulding, J (2020) E-readiness in construction (ERiC): self-assessment framework for UK small and medium enterprise building services providers. Architectural Engineering and Design Management, 16(01), 3–22.

Louise, B, Anders, B and Erik, S (2011) Value-driven purchasing of kitchen cabinets in industrialised housing. Journal of Financial Management of Property and Construction, 16(01), 73–83.

Mahamadu, A-M, Manu, P, Booth, C, Olomolaiye, P, Coker, A, Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector. Journal of Engineering, Design and Technology, 16(01), 2-24.

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: a case study. Construction Management and Economics, 16(01), 71-8.

McWhirter, N and Shealy, T (2020) Case-based flipped classroom approach to teach sustainable infrastructure and decision-making. International Journal of Construction Education and Research, 16(01), 3–23.

Megahed, N (2018) Reflections on studio-based learning: assessment and critique. Journal of Engineering, Design and Technology, 16(01), 63-80.

Mollaoglu, S, Chergia, C, Ergen, E and Syal, M (2016) Diffusion of green building guidelines as innovation in developing countries. Construction Innovation, 16(01), 11-29.

Mpakati-Gama, E C, Brown, A and Sloan, B (2016) Embodied energy and carbon analysis of urban residential buildings in Malawi. International Journal of Construction Management, 16(01), 1-12.

Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: the impact on labour. Construction Management and Economics, 16(01), 79-90.

Ofori-Kuragu, J K, Baiden, B K and Badu, E (2016) Performance measurement tools for Ghanaian contractors. International Journal of Construction Management, 16(01), 13-26.

Okakpu, A, GhaffarianHoseini, A, Tookey, J, Haar, J and Ghaffarianhoseini, A (2020) Exploring the environmental influence on BIM adoption for refurbishment project using structural equation modelling. Architectural Engineering and Design Management, 16(01), 41–57.

Oluwatayo, A, A, Amole, D and Uwakonye, O (2016) Organisational life cycle, business orientation and performances of architectural firms in Nigeria . Construction Economics and Building, 16(01), 50-63.

Onyido, T B C, Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(01), 30-45.

Oo, B (2016) On the external validity of construction bidding experiment. Construction Economics and Building, 16(01), 64-75.

Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public–private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(01), 161-91.

Othman, A A E and Abdelwahab, N M A (2018) Achieving sustainability through integrating risk management into the architectural design process. Journal of Engineering, Design and Technology, 16(01), 25-43.

Pareek, P, Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(01), 54-66.

Pennanen, A, Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(01), 52–63.

Perera, S, Davis, S and Marosszeky, M (2011) Head contractor role in construction value-based management: Australian building industry experience. Journal of Financial Management of Property and Construction, 16(01), 31–41.

Quaigrain, R A and Issa, M H (2018) Development and validation of disability management indicators for the construction industry. Journal of Engineering, Design and Technology, 16(01), 81-100.

Ranasinghe, M (1998) Risk management in the insurance industry: insights for the engineering construction industry. Construction Management and Economics, 16(01), 31-9.

Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(01), 77-93.

Riggio, M, Alhariri, N and Hansen, E (2020) Paths of innovation and knowledge management in timber construction in North America: a focus on water control design strategies in CLT building enclosures. Architectural Engineering and Design Management, 16(01), 58–83.

Seymour, D E, Rooke, J D and Crook, D (1998) The role of theory in construction management: reply to Runeson. Construction Management and Economics, 16(01), 109-12.

Sharma, A K and Vohra, E (2009) Critical evaluation of road infrastructure in India: a cross-country view. Engineering, Construction and Architectural Management, 16(01), 73–91.

Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(01), 49-51.

Wang, C-H and Huang, Y-C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(01), 5-16.

Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(01), 39-53.

Yapage, N and Liyanapathirana, S (2018) Behaviour of geosynthetic reinforced column supported embankments. Journal of Engineering, Design and Technology, 16(01), 44-62.

Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(01), 64–72.