ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 77 results ...

Adafin, J, Rotimi, J O and Wilkinson, S (2016) Risk impact assessments in project budget development: architects’ perspectives. Architectural Engineering and Design Management, 12(03), 189–204.

Adewunmi, O A, Ibem, E and Amole, D (2014) Satisfaction of first-time residential clients with architectural services. Journal of Engineering, Design and Technology, 12(03), 316-35.

Akintoye, A and Skitmore, M R (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(03), 257-70.

Al-Hafith, O, Bk, S and de Wilde, P (2023) Assessing annual thermal comfort extent in central courtyards: Baghdad as a case study. Smart and Sustainable Built Environment, 12(03), 660-81.

Allam, A S, Bassioni, H, Ayoub, M and Kamel, W (2023) Investigating the performance of genetic algorithm and particle swarm for optimizing daylighting and energy performance of offices in Alexandria, Egypt. Smart and Sustainable Built Environment, 12(03), 682-700.

Aouad, G F, Ford, S R, Kirkham, J A, Brandon, P S, Brown, F E, Child, T, Cooper, G S, Oxman, R E and Young, B A (1994) Knowledge elicitation using protocol analysis in a workshop environment. Construction Management and Economics, 12(03), 271-8.

Apu, N and Das, U (2021) Tectonics and earthquake potential of Bangladesh: a review. International Journal of Disaster Resilience in the Built Environment, 12(03), 295-307.

Aranda-Mena, G and Gameson, R (2012) An alignment model for the research higher degree supervision process using repertory grids - reflections on application in practice in built environment research. Construction Economics and Building, 12(03), 66-81.

Ayodeji, F J (2014) Evaluation of site managers’ hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(03), 348-63.

Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: lessons from the Grenfell Tower fire. Smart and Sustainable Built Environment, 12(03), 488-506.

Best, R (2012) International comparisons of cost and productivity in construction: a bad example. Construction Economics and Building, 12(03), 82-88.

Best, R and Purdey, B (2012) Assessing occupant comfort in an iconic sustainable education building. Construction Economics and Building, 12(03), 55-65.

Betts, M and Ofori, G (1994) Strategic planning for competitive advantage in construction: the institutions. Construction Management and Economics, 12(03), 203-17.

Bigelow, B F, Bilbo, D and Baker, M (2016) Construction management research: A comparison of perceived value by general contractors, prevalence of publication, and funding. International Journal of Construction Education and Research, 12(03), 224-40.

Borg, R P, Borg Axisa, G, Ophiyandri, T and Hakam, A (2021) The development of inter-regional and intra-regional cooperation frameworks for multi-hazard early warning systems in South and South-East Asia. International Journal of Disaster Resilience in the Built Environment, 12(03), 265-79.

Broday, E E and Gameiro da Silva, M C (2023) The role of internet of things (IoT) in the assessment and communication of indoor environmental quality (IEQ) in buildings: a review. Smart and Sustainable Built Environment, 12(03), 584-606.

Carandang, A M S, Garciano, L E O, Maruyama, O and De Jesus, R (2021) Proposed resilience index of water lifeline systems. International Journal of Disaster Resilience in the Built Environment, 12(03), 253-64.

Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(03), 236–50.

Carson, C and Abbott, M (2012) A review of productivity analysis of the New Zealand construction industry. Construction Economics and Building, 12(03), 1-15.

Chan, D M, Chan, A P C, Lam, P T I, Lam, E W M and Wong, J M W (2007) Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry. Journal of Financial Management of Property and Construction, 12(03), 139–50.

Darwai, V R, Mandavgane, S A and Lohia, P (2022) Systems based approach to a small scale dairy farm (Goshala): a case study. Built Environment Project and Asset Management, 12(03), 503-18.

de Valence, G (2012) A theory of construction management?. Construction Economics and Building, 12(03), 95-100.

Dolla, T and Laishram, B (2022) Strategies to promote collaborative governance regime in Indian rural road maintenance. Built Environment Project and Asset Management, 12(03), 365-81.

El-Medany, W M, Al-Omary, A, Al-Hakim, R and Nusaif, M (2014) Low cost real-time tracking system prototype using GM862 cellular quad band module. Journal of Engineering, Design and Technology, 12(03), 389-407.

Emmitt, S (2016) Editorial. Architectural Engineering and Design Management, 12(03), 149–50.

Emmitt, S, Pasquire, C and Mertia, B (2012) Is good enough "making do"?: An investigation of inappropriate processing in a small design and build company. Construction Innovation, 12(03), 369-83.

Emuze, F and Smallwood, J J (2014) Collaborative working in South African construction: contractors’ perspectives. Journal of Engineering, Design and Technology, 12(03), 294-306.

Francis, A and Thomas, A (2023) System dynamics modelling coupled with multi-criteria decision-making (MCDM) for sustainability-related policy analysis and decision-making in the built environment. Smart and Sustainable Built Environment, 12(03), 534-64.

Frempong-Jnr, E Y, Ametepey, S O and Cobbina, J E (2023) Impact of stakeholder management on efficient construction waste management. Smart and Sustainable Built Environment, 12(03), 607-34.

Giuliani, F, De Falco, A, Cutini, V and Di Sivo, M (2021) A simplified methodology for risk analysis of historic centers: the world heritage site of San Gimignano, Italy. International Journal of Disaster Resilience in the Built Environment, 12(03), 336-54.

Goedert, J D and Rokooei, S (2016) Project-based construction education with simulations in a gaming environment. International Journal of Construction Education and Research, 12(03), 208-23.

Hadidi, L A (2016) Using quality function deployment to conduct assessment for engineering designs’ contractors. Architectural Engineering and Design Management, 12(03), 205–30.

Haque, M O, Aman, J and Mohammad, F (2022) Construction sustainability of container-modular-housing in coastal regions towards resilient community. Built Environment Project and Asset Management, 12(03), 467-85.

Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(03), 164-79.

Henriksen, T, Lo, S and Knaack, U (2016) The impact of a new mould system as part of a novel manufacturing process for complex geometry thin-walled GFRC. Architectural Engineering and Design Management, 12(03), 231–49.

Hughes, D, Williams, T and Ren, Z (2012) Differing perspectives on collaboration in construction. Construction Innovation, 12(03), 355-68.

Huynh, H T L, Nguyen, H X, Ngo, T T and Van, H T (2021) Pre-disaster assessment of flood risk for mid Central Vietnam. International Journal of Disaster Resilience in the Built Environment, 12(03), 322-35.

Islam, M A, Shetu, M M and Hakim, S S (2022) Possibilities of a gender-responsive infrastructure for livelihood-vulnerable women's resilience in rural-coastal Bangladesh. Built Environment Project and Asset Management, 12(03), 447-66.

Islam, R, Chowdhury, S, Jannat, N and Paul, P (2022) Carbon footprint evaluation of local dwellings in Bangladesh towards low carbon society. Built Environment Project and Asset Management, 12(03), 433-46.

Ismaila, S O, Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(03), 336-47.

Jaselskis, E J and Suazo, G A R (1994) A survey of construction site safety in Honduras. Construction Management and Economics, 12(03), 245-55.

Jin, X-H, Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(03), 297-316.

Kanwar, V S, Dutta, H, Dutt, I, Kumar, A, Prakasam, C and Kanwar, M (2022) Impact and awareness of COVID-19 on rural communities – an empirical study of India. Built Environment Project and Asset Management, 12(03), 486-502.

Katz, J I (2014) Quantifying “cliffs” in design space. Journal of Engineering, Design and Technology, 12(03), 374-88.

Konanahalli, A, Oyedele, L, Coates, R, von Meding, J and Spillane, J (2012) International projects and cross-cultural adjustments of British expatriates in Middle East: a qualitative investigation of influencing factors. Construction Economics and Building, 12(03), 31-54.

Kor, M, Yitmen, I and Alizadehsalehi, S (2023) An investigation for integration of deep learning and digital twins towards Construction 4.0. Smart and Sustainable Built Environment, 12(03), 461-87.

Kumar, S D, Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(03), 364-73.

Lamond, J, Proverbs, D and Antwi, A (2007) The impact of flood insurance on residential property prices: Towards a new theoretical framework for the United Kingdom market. Journal of Financial Management of Property and Construction, 12(03), 129–38.

Liaros, S (2022) A network of circular economy villages: design guidelines for 21st century Garden Cities. Built Environment Project and Asset Management, 12(03), 349-64.

Lowe, D J and Skitmore, M (2007) The learning climate of an organisation and practitioner competence. Journal of Financial Management of Property and Construction, 12(03), 151–64.

Martin, H, Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(03), 170–88.

Mohammad Ahmad, A, Rodriguez Trejo, S, Hafeez, M A, Dawood, N, Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(03), 507-33.

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(03), 272-96.

Neeraj, S, Mannakkara, S and Wilkinson, S (2021) Build back better concepts for resilient recovery: a case study of India’s 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment, 12(03), 280-94.

Ng, S T, Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(03), 264–82.

Nguyen Van, T, Nguyen Hieu, T and De Troyer, F (2016) Managing pile foundation and land cost for high-rise buildings in the early design stages. Architectural Engineering and Design Management, 12(03), 151–69.

Ofori, G (1994) Formulating a long-term strategy for developing the construction industry of Singapore. Construction Management and Economics, 12(03), 219-31.

Oke, A E, Ogunsami, D R and Ogunlana, S (2012) Establishing a common ground for the use of structural equation modelling for construction related research studies. Construction Economics and Building, 12(03), 89-94.

Owusu-Manu, D G, Babon-Ayeng, P, Kissi, E, Edwards, D J, Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: an assessment framework. Smart and Sustainable Built Environment, 12(03), 565-83.

Park, J, Park, J, Kim, J and Kim, J (2012) Building information modelling based energy performance assessment system: An assessment of the Energy Performance Index in Korea. Construction Innovation, 12(03), 335-54.

Pishdad-Bozorgi, P and Beliveau, Y J (2016) Symbiotic relationships between integrated project delivery and trust. International Journal of Construction Education and Research, 12(03), 179-92.

Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(03), 233-43.

Renukappa, S, Egbu, C, Akintoye, A and Goulding, J (2012) A critical reflection on sustainability within the UK industrial sectors. Construction Innovation, 12(03), 317-34.

Roy, N C and Roy, N G (2022) Sustainable hydroelectric power project planning under socio-economic and environmental concerns using Index based approach. Built Environment Project and Asset Management, 12(03), 401-32.

Ruikar, K, Anumba, C J and Carrillo, P (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(03), 222–35.

Saurin, T A, Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(03), 283–98.

Seyman Guray, T and Kismet, B (2023) VR and AR in construction management research: bibliometric and descriptive analyses. Smart and Sustainable Built Environment, 12(03), 635-59.

Shen, G Q and Yu, A T W (2012) Value management: recent developments and way forward. Construction Innovation, 12(03), 264-71.

Shupe-Diggs, C, Diko, S K and Santo, C A (2021) An integrated social vulnerability assessment of riverine flood hazards in Shelby County, Tennessee. International Journal of Disaster Resilience in the Built Environment, 12(03), 308-21.

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(03), 251–63.

Teo, E A L and Lin, G (2012) Factors affecting adaptation potential for public housing in Singapore: Decision makers' perspective. International Journal of Construction Management, 12(03), 63-84.

Thangaraj, R K and Chan, T K (2012) The effects of the global financial crisis on the Australian building construction supply chain. Construction Economics and Building, 12(03), 16-30.

Thevenin, M K, Elliott, J W and Bigelow, B F (2016) Mentors, role models, and observed differences in students' construction education self-efficacy and motivation. International Journal of Construction Education and Research, 12(03), 162-78.

Vijay, V, Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: a concept. Built Environment Project and Asset Management, 12(03), 382-400.

Vinodh, S and Rathod, G (2014) Application of life cycle assessment and Monte Carlo simulation for enabling sustainable product design. Journal of Engineering, Design and Technology, 12(03), 307-15.

Walker, A and Kalinowski, M (1994) An anatomy of a Hong Kong project: organization, environment and leadership. Construction Management and Economics, 12(03), 191-202.

Weidman, J E, Dickerson, D E and Koebel, C T (2016) Technology champions: A theory-based intervention to improve adoption of occupational safety innovations. International Journal of Construction Education and Research, 12(03), 193-207.