ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 83 results ...

Alani, A M, Petersen, A K, Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance -theory, model development and application. Journal of Construction Research, 5(02), 193–210.

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: a comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(02), 159–73.

Allan, P and Bryant, M (2014) The attributes of resilience: A tool in the evaluation and design of earthquake-prone cities. International Journal of Disaster Resilience in the Built Environment, 5(02), 109-29.

Altomonte, S (2005) CH2 - Lighting and physiology. Construction Economics and Building, 5(02), 40-46.

Assaf, S A (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: a case study. Construction Management and Economics, 5(02), 157-68.

Aye, L and Fuller, R (2005) An evaluation of a proposed ventilation system for Melbourne's CH2 building. Construction Economics and Building, 5(02), 47-57.

Aye, L and Fuller, R (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(02), 32-39.

Back, W E and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(02), 137–43.

Badger, W, Sullivan, K, Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(02), 121-46.

Baker, F (2013) Housing and planning regulation – England and Ireland. International Journal of Law in the Built Environment, 5(02), 118-36.

Baroudi, B and Rapp, R R (2014) Stakeholder management in disaster restoration projects. International Journal of Disaster Resilience in the Built Environment, 5(02), 182-93.

Bichard, E and Thurairajah, N (2014) Trialling behaviour change strategies to motivate interest in property level flood protection. International Journal of Disaster Resilience in the Built Environment, 5(02), 130-43.

Blyth, K, Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(02), 329–47.

Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(02), 115-21.

Chan, A P C, Wong, F K W and Yang, Y (2016) From innovation to application of personal cooling vest. Smart and Sustainable Built Environment, 5(02), 111-24.

Chantawit, D, Hadikusumo, B H W, Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: visualizing project scheduling and safety planning. Construction Innovation, 5(02), 99–114.

Charlesworth, E and Fien, J (2014) Breaching the urban contract: Lessons from post disaster reconstruction from research on five divided cities. International Journal of Disaster Resilience in the Built Environment, 5(02), 194-201.

Cheng, E W L, Li, H and Yu, L (2005) The analytic network process (ANP) approach to location selection: a shopping mall illustration. Construction Innovation, 5(02), 83–97.

Cheung, C (2005) CH2 energy harvesting systems: economic use and efficiency. Construction Economics and Building, 5(02), 20-31.

City of Melbourne (2005) Preamble to special issue. Construction Economics and Building, 5(02), 1-7.

Collins, A and Baccarini, D (2004) Project success -a survey. Journal of Construction Research, 5(02), 211–31.

D'Incognito, M, Costantino, N and Migliaccio, G C (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management, 5(02), 202-16.

Duncan, K, Philips, P and Prus, M (2009) The effects of prevailing wage regulations on construction efficiency in British Columbia. International Journal of Construction Education and Research, 5(02), 63-78.

Edwards, D J, Yang, J, Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(02), 173–87.

Ezulike, E L and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(02), 144–9.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(02), 182–8.

Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(02), 129–40.

Green, S D (1999) Partnering: the propaganda of corporatism?. Journal of Construction Procurement, 5(02), 177–86.

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(02), 171–92.

Hansen, K L, MGann, D and Groák, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(02), 115–26.

Haupt, T C and Smallwood, J (2004) HIV and AIDS in SA construction: attitudes and perceptions of workers. Journal of Construction Research, 5(02), 311–27.

Hearne, R (2013) Realising the “right to the city”: Developing a human rights based framework for regeneration of areas of urban disadvantage. International Journal of Law in the Built Environment, 5(02), 172-87.

Hes, D, Morrison, A and Bates, M (2005) Assessment and selection of materials for Melbourne City Council House 2. Construction Economics and Building, 5(02), 8-19.

Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.

Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(02), 96-110.

Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(02), 107–14.

Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(02), 141–58.

Kayan, B A, Forster, A M and Banfill, P F G (2016) Green Maintenance for historic masonry buildings: an option appraisal approach. Smart and Sustainable Built Environment, 5(02), 143-64.

Khatib, J M, Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(02), 159–72.

Kramer, S W and Dillard, C (2009) Why do American construction professionals choose to work abroad on US embassy projects?. International Journal of Construction Education and Research, 5(02), 95-107.

  • Type: Journal Article
  • Keywords: career; international construction; motivation; US. embassy
  • ISBN/ISSN: 1557-8771
  • URL: https://doi.org/10.1080/15578770902952231
  • Abstract:

    This qualitative research study examines some of the motivating factors and personality traits found in American construction professionals who have experience working on United States embassy projects. In response to global terrorism in the 1990s, the United States federal government has entered into a phase of building newer, more secure embassy buildings in several countries across the globe. Construction professionals who choose to work on these projects are faced with a multitude of conditions which would not likely be found in U.S. domestic projects. Twenty construction professionals were interviewed about topics such as motivations to work overseas and personal challenges encountered abroad. Structured, videotaped interviews were used as an investigative research tool. Analysis and conclusions are based upon the interviewees’ responses.

Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(02), 88–98.

Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(02), 118–28.

Laitos, J G and Abel, T M (2013) Sites suitable for mixed use development in Britain and America. International Journal of Law in the Built Environment, 5(02), 137-55.

Lam, P T I, Wong, F K W and Wong, F W H (2007) Building features and site-specific factors affecting buildability in Hong Kong. Journal of Engineering, Design and Technology, 5(02), 129–47.

Lansley, P R (1987) Corporate strategy and survival in the UK construction industry. Construction Management and Economics, 5(02), 141-55.

Lenard, D (1999) Future challenges in construction management: creating a symbiotic learning environment. Journal of Construction Procurement, 5(02), 197–210.

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(02), 189–98.

Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(02), 101-13.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(02), 127–36.

Lundgren, M S (2016) Energy and architectural consequences of Swedish building code. Smart and Sustainable Built Environment, 5(02), 125-42.

Machika, P (2007) Access to success: The value of bridging programmes in engineering at the University of Johannesburg. Journal of Engineering, Design and Technology, 5(02), 120–8.

MacKee, J, Askland, H H and Askew, L (2014) Recovering cultural built heritage after natural disasters: A resilience perspective. International Journal of Disaster Resilience in the Built Environment, 5(02), 202-12.

Manthe, M and Smallwood, J (2007) The appropriateness of built environment tertiary education: Perspectives of academics and postgraduate students. Journal of Engineering, Design and Technology, 5(02), 102–19.

Moore, J E, Kuprenas, J, Lee, J-J, Gordon, P, Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: the Los Angeles case. Journal of Construction Research, 5(02), 149–70.

Muya, M, Price, A D F, Thorpe, A and Edum-Fotwe, F (1999) Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply. Journal of Construction Procurement, 5(02), 99–117.

Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(02), 211–20.

O'Mahony, L F (2013) The meaning of home: from theory to practice. International Journal of Law in the Built Environment, 5(02), 156-71.

Ofori, G, Dulaimi, M F and Ling, F Y Y (2004) Improving performance of construction industry in Singapore: motivators, enablers and lessons for developing countries. Journal of Construction Research, 5(02), 267–89.

Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(02), 187–96.

Opoku, A, Ahmed, V and Cruickshank, H (2015) Leadership style of sustainability professionals in the UK construction industry. Built Environment Project and Asset Management, 5(02), 184-201.

Opoku, A, Cruickshank, H and Ahmed, V (2015) Organizational leadership role in the delivery of sustainable construction projects in UK. Built Environment Project and Asset Management, 5(02), 154-69.

Panthi, K, Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(02), 79-94.

Peltola, T and Mansikkamaki, P (2007) Formable multilayer PCB structure: design and technology demonstrator. Journal of Engineering, Design and Technology, 5(02), 148–58.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(02), 174–81.

Reposa, J H (2009) Comparison of USGBC LEED for homes and the NAHB national green building program. International Journal of Construction Education and Research, 5(02), 108-20.

Roberts, J (1987) The business round-table construction industry cost effectiveness task force. Construction Management and Economics, 5(02), 95-100.

Sajjadian, S M (2016) Dynamic modelling of solar storage system: a case study of leisure centre. Smart and Sustainable Built Environment, 5(02), 165-75.

Scott, D (1987) Multi-objective economic evaluation of minor roading projects. Construction Management and Economics, 5(02), 169-81.

Sebastian, R (2004) Critical appraisal of design management in architecture. Journal of Construction Research, 5(02), 255–66.

Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving leed certification in a green building project. Built Environment Project and Asset Management, 5(02), 170-83.

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(02), 141-53.

Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(02), 233–53.

Somerville, P (2013) Property and power in the English countryside: the case of housing. International Journal of Law in the Built Environment, 5(02), 100-17.

Stewart, P, Robinson, J and Low, S (2005) The business case for sustainable design - the City of Melbourne CH2 project. Construction Economics and Building, 5(02), 58-70.

Syed, A and Routray, J K (2014) Vulnerability assessment of earthquake prone communities in Baluchistan. International Journal of Disaster Resilience in the Built Environment, 5(02), 144-62.

Tam, C M and Tong, T K L (2005) Multiple GMDH models for estimating resource requirements. Construction Innovation, 5(02), 115–31.

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(02), 71–82.

Tucker, S, Gamage, A and Wijeyesekera, C (2014) Some design aspects of sustainable post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 5(02), 163-81.

Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(02), 163–76.

Vakhitova, T V (2015) Rethinking conservation: Managing cultural heritage as an inhabited cultural landscape. Built Environment Project and Asset Management, 5(02), 217-28.

van den Bosch, C C K (2016) Tree agency and urban forest governance. Smart and Sustainable Built Environment, 5(02), 176-88.

Walker, A and Hughes, W (1987) A project managed by a multi-disciplinary practice: a systems-based case study. Construction Management and Economics, 5(02), 123-40.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(02), 291–309.