ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 68 results ...
Agyekum, K, Ghansah, F A, Tetteh, P A and Amudjie, J (2021) The role of project managers (PMs) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, 19(01), 245-62.
Ahankoob, A, Manley, K, Hon, C and Drogemuller, R (2023) The influence of building information modelling on the absorptive capacity of project-based organisations. Architectural Engineering and Design Management, 19(01), 1–21.
Alaghbari, W, Al-Sakkaf, A A and Sultan, B (2019) Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(01), 79-91.
Alameri, R and Esmaeili, B (2023) Progressive Design-build Delivery Method: Assessment of Project Performance. International Journal of Construction Education and Research, 19(01), 22–41.
Aldossari, K M, Lines, B C, Smithwick, J B, Hurtado, K C and Sullivan, K T (2023) Employee Reactions to Adoption of Alternative Project Delivery Methods within the AEC Industry. International Journal of Construction Education and Research, 19(01), 4–21.
Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(01), 57-64.
Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation , 19(01), 110–24.
Asgari, S and Noorzai, E (2023) Improving the effectiveness and interaction between building information modeling and life cycle assessment. Architectural Engineering and Design Management, 19(01), 22–38.
Azadeh, A, Kalantari, M, Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting. Construction Innovation , 19(01), 71–88.
Belayutham, S and Ibrahim, C, K, I, C (2019) Barriers and strategies for better safety practices: the case of construction SMEs in Malaysia. Construction Economics and Building, 19(01), 20-39.
Chen, G X, Shan, M, Chan, A P C, Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(01), 1-14.
Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(01), 76-94.
de Souza, M P, Fialho, B C, Ferreira, R C, Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: an experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(01), 74–91.
Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India . Construction Economics and Building, 19(01), 40-56.
Dominic, A-D D and Smith, S D (2014) Rethinking construction cost overruns: cognition, learning and estimation. Journal of Financial Management of Property and Construction, 19(01), 38-54.
Falaq Assad, N, Edwards, D J, Shelbourn, M, Martek, I, Wellington Didibhuku Didibhuku, T and El-Gohary, H (2021) Comparison of modular and traditional UK housing construction: a bibliometric analysis. Journal of Engineering, Design and Technology, 19(01), 164-86.
Fan, L, Ho, C and Ng, V C-W (2001) A study of quantity surveyors' ethical behaviour. Construction Management and Economics, 19(01), 19-36.
Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(01), 40–60.
Gambo, N, Musonda, I and Zadawa, A N (2023) Effects of Social Media Learning Environments on AEC Learning Process among University Students in Nigeria. International Journal of Construction Education and Research, 19(01), 99–127.
Greenwood, D J (2001) Subcontractor procurement: are relationships changing?. Construction Management and Economics, 19(01), 5-7.
Hosseini, M R, Edwards, D J, Singh, T, Martek, I and Amos, D (2021) Engineering project networks: providing “sustainable work systems. Journal of Engineering, Design and Technology, 19(01), 21-40.
Hua, Y, Kang, F, Zhang, S and Li, J (2023) Impacts of task interdependence and equivocality on ICT adoption in the construction industry: a task-technology fit view. Architectural Engineering and Design Management, 19(01), 92–109.
Irewolede Aina, I, Godwin Iroroakpo, I and Michael Gbolagade, O (2021) Key training practice indicators for optimal site supervisors' utilisation in construction firms. Journal of Engineering, Design and Technology, 19(01), 149-63.
Jafari, K G, Nozhat Sadat Ghazi, S and Noorzai, E (2021) BIM-based integrated solution for analysis and management of mismatches during construction. Journal of Engineering, Design and Technology, 19(01), 81-102.
Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(01), 89–109.
Johnson, A, Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(01), 41-61.
Johnstone, I M (2001) Periodic refurbishment and reductions in national costs to sustain dwelling services. Construction Management and Economics, 19(01), 97-108.
Kagioglou, M, Cooper, R and Aouad, G F (2001) Performance management in construction: a conceptual framework. Construction Management and Economics, 19(01), 85-95.
Khlaifat, D M, Alyagoub, R E, Sweis, R J and Sweis, G J (2019) Factors leading to construction projects' failure in Jordan. International Journal of Construction Management, 19(01), 65-78.
Koch, C (2014) The more the better?: Investigating performance of the Danish and Swedish offshore wind farm cluster. Journal of Financial Management of Property and Construction, 19(01), 24-37.
Kululanga, G (2012) Capacity building of construction industries in Sub-Saharan developing countries: A case for Malawi. Engineering, Construction and Architectural Management, 19(01), 86–100.
Lam, K C, So, A T P, Hu, T S, Ng, S T, Yuen, R K K, Lo, S M, Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(01), 63-76.
Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates . Construction Economics and Building, 19(01), 96-110.
Lim, L J W and Ling, F Y Y (2012) Human resource practices of contractors that lead to job satisfaction of professional staff. Engineering, Construction and Architectural Management, 19(01), 101–18.
Lingard, H, Raj, I, S, Lythgo, N, Troynikov, O and Fitzgerald, C (2019) The impact of tool selection on back and wrist injury risk in tying steel reinforcement bars: a single case experiment . Construction Economics and Building, 19(01), 1-19.
Luo, J (2001) Assessing management and performance of Sino-foreign construction joint ventures. Construction Management and Economics, 19(01), 109-17.
Mahdizadeh, H and Nor Mariah, A (2021) Numerical study of heat transfer in 90° bend tube by AI<sub>2</sub>O<sub>3</sub> nano fluids using fluid injection. Journal of Engineering, Design and Technology, 19(01), 127-48.
Majava, J, Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation , 19(01), 34–47.
Mattaraia, L, Fabricio, M M and Codinhoto, R (2023) Structure for the classification of disassembly applied to BIM models.. Architectural Engineering and Design Management, 19(01), 56–73.
McCord, K H, Ayer, S K, Lamanna, A J, Eicher, M, London, J S and Wu, W (2023) Construction Education Needs Derived from Industry Evaluations of Students and Academic Research Publications. International Journal of Construction Education and Research, 19(01), 77–98.
Moeti, M, Jacques, E, Feng, W and North, C (2021) Modelling the effect of computation sampling on insight error in computational fluid dynamics scientific simulation. Journal of Engineering, Design and Technology, 19(01), 263-90.
Mwakabole, G, C, Gurmu, A, T and Tivendale, L (2019) Investigation of the challenges facing public-private partnership projects in Australia . Construction Economics and Building, 19(01), 57-74.
Naga Vamsi Krishna, J, Kota, S and Venkataraman, P B (2021) An impact of simulation labs on engineering students' academic performance: a critical Investigation. Journal of Engineering, Design and Technology, 19(01), 103-26.
Ng, M S, Graser, K and Hall, D M (2023) Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study. Architectural Engineering and Design Management, 19(01), 39–55.
Nicolini, D, Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(01), 37-47.
Onubi, H, O Yusof, N'A and Hassan, A, S (2019) Green site practices and environmental performance: how project complexity moderates the relationship . Construction Economics and Building, 19(01), 75-95.
Oo, B L, Lo, H-P and Lim, B T-H (2012) The effect of bidding success in construction bidding. Engineering, Construction and Architectural Management, 19(01), 25–39.
Oyewobi, L O, Windapo, A O, Rotimi, J O B and Jimoh, R A (2019) Determining strategic clusters and performance of construction organizations in South Africa. International Journal of Construction Management, 19(01), 46-56.
Perrenoud, A, Short, E and Cowan, D (2023) Development and Validation of Elements for the Construction Risk Maturity Assessment (CRMA). International Journal of Construction Education and Research, 19(01), 42–60.
Prachi Vinod, I, Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(01), 1-20.
Radebe, T B, Huan, Z and Baloyi, J (2021) Simulation of eutectic plates in medium refrigerated transport. Journal of Engineering, Design and Technology, 19(01), 62-80.
Randeree, K and Chaudhry, A G (2012) Leadership – style, satisfaction and commitment: An exploration in the United Arab Emirates' construction sector. Engineering, Construction and Architectural Management, 19(01), 61–85.
Saini, M, Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(01), 15–33.
Samarajeewa, C T, Rajaratnam, D, Disaratna, P A P V D S, Perera, B A K S and Wijewickrama, M K C S (2023) Quality Circles: An Approach to Determine the Job Satisfaction of Construction Employees. International Journal of Construction Education and Research, 19(01), 61–76.
Sharma, R (2021) Effect of wastes and admixtures on compressive strength of concrete. Journal of Engineering, Design and Technology, 19(01), 219-44.
Shehu, Z, Endut, I R and Akintoye, A (2014) Factors contributing to project time and hence cost overrun in the Malaysian construction industry. Journal of Financial Management of Property and Construction, 19(01), 55-75.
Shoar, S, Nasirzadeh, F and Zarandi, H R (2019) Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties. Construction Innovation, 19(01), 48–70.
Singh, M M, Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(01), 15-31.
Sun, Q, He, L, Ding, F, Chen, X, Ding, L and Tu, Y (2021) Modeling and analysis of structure parameters on the lifting force for power catwalk. Journal of Engineering, Design and Technology, 19(01), 187-202.
Sundling, R, Blomsterberg, & and Landin, A (2019) Enabling energy-efficient renovation: the case of vertical extension to buildings. Construction Innovation, 19(01), 2–14.
Teng, Y, Li, X, Wu, P and Wang, X (2019) Using cooperative game theory to determine profit distribution in IPD projects. International Journal of Construction Management, 19(01), 32-45.
Tokede, O, Wamuziri, S, Sloan, B and Brown, A (2014) Cost analysis error? Exploring issues relating to whole-life cost estimation in sustainable housing. Journal of Financial Management of Property and Construction, 19(01), 4-23.
Treloar, G J, Love, P E D and Holt, G D (2001) Using national input-output data for embodied energy analysis of individual residential buildings. Construction Management and Economics, 19(01), 49-61.
Tse, R Y C and Raftery, J (2001) The effects of money supply on construction flows. Construction Management and Economics, 19(01), 9-17.
Wang, Y, Lin, M, Xu, K, Zhang, S and Ma, H (2021) Energy consumption analysis of glass house using electrochromic window in the subtropical region. Journal of Engineering, Design and Technology, 19(01), 203-18.
Xia, B and Chan, A P C (2012) Measuring complexity for building projects: a Delphi study. Engineering, Construction and Architectural Management, 19(01), 7–24.
Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(01), 77-84.
Zaheer, M I, Ajayi, S O, Sambo Lyson, Z, Oyegoke, A and Kazemi, H (2021) Understanding the key competencies of market-ready building surveying graduates from employers' perspectives. Journal of Engineering, Design and Technology, 19(01), 291-314.