Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: a systematic review. Built Environment Project and Asset Management, 8(04), 372–85.
Alabi, A S, Adegbile, M, Alabi, O, Abisuga, O, Oyewole, K and Oshodi, O (2017) Stakeholders’ role in disaster-risk-reduction of fire occurrences in Lagos Metropolis. International Journal of Disaster Resilience in the Built Environment, 8(04), 425-40.
Allender, C, Sutrisna, M and Zaman, A U (2017) Towards developing robust climate risk management strategies in the estuarine park of the Swan River, Western Australia. International Journal of Disaster Resilience in the Built Environment, 8(04), 441-62.
Amadi, C, Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: external stakeholders’ perspective. Built Environment Project and Asset Management, 8(04), 403–14.
Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(04), 399-414.
Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(04), 292–303.
Dawood, N N and Neale, R H (1990) A survey of current production planning practices in the precast concrete industry. Construction Management and Economics, 8(04), 365-83.
de Laat, P (2019) Resource depletion: where is an intervention most effective?. Smart and Sustainable Built Environment, 8(04), 307–21.
Dodd, J and Langford, D A (1990) Construction management on one large project in London: a case study. Construction Management and Economics, 8(04), 385-99.
El-Sawalhi, N, Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(04), 280–98.
Espada, R, Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(04), 375-411.
Fan, C N L, Ho, M H C and Ng, V (2001) Effect of professional socialization on quantity surveyors’ ethical perceptions in Hong Kong. Engineering, Construction and Architectural Management, 8(04), 304–12.
Fisher, N G (1990) The use of structured data analysis as a construction management research tool. Construction Management and Economics, 8(04), 341-63.
Florez, L, Irizarry, J, Castro-Lacouture, D, Abdollahipour, S and Jeong, H (2012) Feasibility of Implementing a Computer-Assisted Pavement Rehabilitation Decision Support System. International Journal of Construction Education and Research, 8(04), 281-300.
Gale, A W and Fellows, R F (1990) Challenge and innovation: the challenge to the construction industry. Construction Management and Economics, 8(04), 431-6.
Giritli, H, Sözen, Z, Flanagan, R and Lansley, P R (1990) International contracting: a Turkish perspective. Construction Management and Economics, 8(04), 415-30.
Hadiwattege, C, Senaratne, S, Sandanayake, Y and Fernando, N G (2018) Academic research in emerging knowledge-based economies. Built Environment Project and Asset Management, 8(04), 415–28.
Hughes, W (2001) Evaluating plans of work. Engineering, Construction and Architectural Management, 8(04), 272–83.
Jumas, D, Mohd-Rahim, F A, Zainon, N and Utama, W P (2018) Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects. Built Environment Project and Asset Management, 8(04), 348–57.
Kamara, J M (2012) Integration in the project development process of a Private Finance Initiative (PFI) project. Architectural Engineering and Design Management, 8(04), 228-45.
Khallaf, R, Naderpajouh, N and Hastak, M (2018) A systematic approach to develop risk registry frameworks for complex projects. Built Environment Project and Asset Management, 8(04), 334–47.
Koskela, L and Dave, B (2008) Process and IT. Construction Innovation, 8(04), 244–9.
Krueger, K, Stoker, A and Gaustad, G (2019) “Alternative” materials in the green building and construction sector. Smart and Sustainable Built Environment, 8(04), 270–91.
Kuittinen, M and Takano, A (2017) The energy efficiency and carbon footprint of temporary homes: a case study from Japan. International Journal of Disaster Resilience in the Built Environment, 8(04), 326-43.
Kumar, V, Hundal, B S and Kaur, K (2019) Factors affecting consumer buying behaviour of solar water pumping system. Smart and Sustainable Built Environment, 8(04), 351–64.
Loyola, M (2019) A method for real-time error detection in low-cost environmental sensors data. Smart and Sustainable Built Environment, 8(04), 338–50.
MacKenzie, A (2017) Planning for the redevelopment after a fire event. International Journal of Disaster Resilience in the Built Environment, 8(04), 344-56.
Mandal, S, Bhattacharya, S, Korasiga, V R and Sarathy, R (2017) The dominant influence of logistics capabilities on integration: Empirical evidence from supply chain resilience. International Journal of Disaster Resilience in the Built Environment, 8(04), 357-74.
Manu, P, Mahamadu, A, Booth, C, Olomolaiye, P, Ibrahim, A D and Coker, A (2018) Assessment of procurement capacity challenges inhibiting public infrastructure procurement. Built Environment Project and Asset Management, 8(04), 386–402.
Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(04), 250–68.
May, D, Wilson, O and Skitmore, M (2001) Bid cutting: an empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(04), 250–6.
McCoy, A P, Saunders, L, Kleiner, B and Blismas, N (2012) Application of Safety Project Interview Data to a Cyclical Research Model of Translation. International Journal of Construction Education and Research, 8(04), 260-80.
Ng, S T, Skitmore, R M and Sharma, T (2001) Towards a human resource information system for Australian construction companies. Engineering, Construction and Architectural Management, 8(04), 238–49.
Novak, V M, Fernandez-Anez, N and Shiraishi, K (2017) Rethinking resilience planning: from problems to potential. International Journal of Disaster Resilience in the Built Environment, 8(04), 412-24.
Olatunji, O A, Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project’s outturn costs. Built Environment Project and Asset Management, 8(04), 358–71.
Opoku, D J, Ayarkwa, J and Agyekum, K (2019) Barriers to environmental sustainability of construction projects. Smart and Sustainable Built Environment, 8(04), 292–306.
Parasonis, J, Keizikas, A and Kalibatiene, D (2012) The relationship between the shape of a building and its energy performance. Architectural Engineering and Design Management, 8(04), 246-56.
Prakash, A (2019) Smart Cities Mission in India: some definitions and considerations. Smart and Sustainable Built Environment, 8(04), 322–37.
Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: a study of ‘European’ and Australian contractors. Engineering, Construction and Architectural Management, 8(04), 284–91.
Rigby, E T, McCoy, A P and Garvin, M J (2012) Toward Aligning Academic and Industry Understanding of Innovation in the Construction Industry. International Journal of Construction Education and Research, 8(04), 243-59.
Stringer, A, Dunne, J and Boussabaine, H (2012) Schools design quality: A user perspective. Architectural Engineering and Design Management, 8(04), 257-72.
Visscher, H, Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(04), 269–79.
Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(04), 299–317.
Wasserman, B (2012) Wash Water in the Mix: Effects on the Compressive Strength of Concrete. International Journal of Construction Education and Research, 8(04), 301-16.
Wong, C H, Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients’ tender evaluation preferences. Engineering, Construction and Architectural Management, 8(04), 257–71.