ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 48 results ...

Acheamfour, V K, Adjei-Kumi, T and Kissi, E (2023) Contractor selection: A review of qualification and pre-qualification systems. International Journal of Construction Management, 23(02), 338–48.

Alao, O O, Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation. Journal of Financial Management of Property and Construction, 23(02), 185–201.

Alzubi, K M, Alkhateeb, A M and Hiyassat, M A (2023) Factors affecting the job satisfaction of construction engineers: Evidence from Jordan. International Journal of Construction Management, 23(02), 319–28.

Ampratwum, G, Tam, V W Y and Osei-Kyei, R (2023) Critical analysis of risks factors in using public-private partnership in building critical infrastructure resilience: a systematic review. Construction Innovation, 23(02), 360-82.

Arai, K and Morimoto, E (2023) Case study in shikoku: Changes in the bidding behaviour of businesses. International Journal of Construction Management, 23(02), 225–33.

Babatunde, S O, Awodele, O A and Adeniyi, O (2018) Opportunities and challenges of foreign direct investment utilisation and its impact on construction sector in developing countries. Journal of Financial Management of Property and Construction, 23(02), 239–56.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(02), 192-210.

Chileshe, N, Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(02), 134-57.

Cuervo, J C and Low, S P (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(02), 147-62.

Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(02), 163-–8.

De Silva, N, Weerasinghe, N, Madhusanka, H and Kumaraswamy, M (2018) Enablers of relational integrated value networks (RIVANS) for total facilities management (TFM). Journal of Financial Management of Property and Construction, 23(02), 170–84.

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(02), 169-84.

Gunasekara, D M H, Indikatiya, I H P R, Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(02), 406-24.

Gurmu, A T, Krezel, A and Mahmood, M N (2023) Analysis of the causes of defects in ground floor systems of residential buildings. International Journal of Construction Management, 23(02), 268–75.

Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy � a case study of Trinidad and Tobago. Construction Management and Economics, 23(02), 185-97.

Ijaola, I A, Idoro, G I and Oladokun, M G (2023) Developing key indicators for site supervisors' task performance in construction firms. International Journal of Construction Management, 23(02), 349–57.

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(02), 215-23.

Ismail, Z A B (2023) A BIM-based model checking in the green building maintenance: a review. Construction Innovation, 23(02), 487-503.

Keskiniva, K, Saari, A and Junnonen, J M (2023) Suggestions for takt production subcontract clauses – a conceptual study. Construction Innovation, 23(02), 425-42.

Kissi, E, Aigbavboa, C and Kuoribo, E (2023) Emerging technologies in the construction industry: challenges and strategies in Ghana. Construction Innovation, 23(02), 383-405.

Konno, Y and Itoh, Y (2018) Why do listed companies delist themselves voluntarily?. Journal of Financial Management of Property and Construction, 23(02), 152–69.

Lam, K C, Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(02), 127-45.

Larsson, R and Rudberg, M (2023) Effects of weather conditions on concrete work task productivity – a questionnaire survey. Construction Innovation, 23(02), 306-21.

Lennartsson, M, André, S and Elgh, F (2023) PLM support for design platforms in industrialized house-building. Construction Innovation, 23(02), 265-86.

Malek, M S and Gundaliya, P J (2023) Negative factors in implementing public-private partnership in Indian road projects. International Journal of Construction Management, 23(02), 234–42.

Mater, Y, Kamel, M, Karam, A and Bakhoum, E (2023) ANN-Python prediction model for the compressive strength of green concrete. Construction Innovation, 23(02), 340-59.

Maxwell, D and Couper, R (2023) Construction tracking: implications of logistics data. Construction Innovation, 23(02), 322-39.

Mintah, K, Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(02), 133–51.

Nouh, A, Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(02), 467-86.

Osei-Kyei, R, Chan, A P, Dansoh, A, Ofori-Kuragu, J K and Owusu, E K (2018) Motivations for adopting unsolicited proposals for public-private partnership project implementation. Journal of Financial Management of Property and Construction, 23(02), 221–38.

Oyewole, M O, Komolafe, M O and Gbadegesin, J T (2023) Understanding stakeholders' opinion and willingness on the adoption of sustainable residential property features in a developing property market. International Journal of Construction Management, 23(02), 358–70.

Polanco-Guzmán, I, Rodríguez-Troncoso, M, Hammad, A W A, Haddad, A N, Tam, V W Y and Vasco, D A (2023) An improved ventilation system for settling stage of a wastewater treatment plant: A computational simulation analysis. International Journal of Construction Management, 23(02), 205–24.

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(02), 253–67.

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: experiences from a Norwegian mega-project. Construction Innovation, 23(02), 287-305.

Rondinel-Oviedo, D R (2023) Construction and demolition waste management in developing countries: A diagnosis from 265 construction sites in the lima metropolitan area. International Journal of Construction Management, 23(02), 371–82.

Saka, N and Olanipekun, A O (2023) Relationship between the economy, construction sector and imports in Nigeria. International Journal of Construction Management, 23(02), 297–306.

Sandrk, N I and Huemann, M (2016) Organizational culture of the Croatian construction industry. Engineering, Construction and Architectural Management, 23(02), 237-60.

Sepasgozar, S M E, Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(02), 158-76.

Shelton, J, Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(02), 177-91.

Simpeh, E K, Smallwood, J J, Ahadzie, D K and Mensah, H (2023) Analytical taxonomy of challenges to the implementation of green building projects in South Africa. International Journal of Construction Management, 23(02), 286–96.

Sun, Q, Zhang, S, Ke, Y, Ma, X and Galvin, S (2023) Comparative analysis on the PPP research in Chinese and international journals: A bibliometric perspective. International Journal of Construction Management, 23(02), 307–18.

Tchumtcha Wembe, P (2023) Managing stakeholders in engineering procurement construction management projects in Africa by Chinese project managers. International Journal of Construction Management, 23(02), 329–37.

Tran, C N N, Tam, V W Y, Le, K N and Illankoon, I M C S (2023) Environmental impacts assessment for Australian buildings: Thermal resistance and environmental impacts relationship. International Journal of Construction Management, 23(02), 243–52.

Tunji-Olayeni, P F, Kajimo–Shakantu, K, Ayodele, T O and Philips, B I (2023) Students' perception of sustainable construction: Accelerating progress towards construction education for sustainable development. International Journal of Construction Management, 23(02), 276–85.

Wang, W-C and Dzeng, R-J (2005) Applying cluster identification algorithm and simulation to generate probabilistic network schedules for design projects. Construction Management and Economics, 23(02), 199-213.

Willar, D, Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(02), 114-33.

Yogeshwaran, G, Perera, B and Ariyachandra, M M F (2018) Competencies expected of graduate quantity surveyors working in developing countries. Journal of Financial Management of Property and Construction, 23(02), 202–20.

Zuppa, D, Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(02), 211-36.