ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 50 results ...
Alankarage, S, Chileshe, N, Rameezdeen, R, Edwards, D J and Samaraweera, A (2023) Exploring BIM-triggered organisational and professional culture change: a systematic literature review. Construction Innovation, 23(01), 229-47.
Almarri, K, Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(01), 85-104.
Amadi, A I and Higham, A (2018) The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. Journal of Financial Management of Property and Construction, 23(01), 57–72.
Benjaoran, V, Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(01), 93-105.
Bowen, P, Govender, R, Edwards, P and Cattell, K (2016) An explanatory model of attitudinal fear of HIV/AIDS testing in the construction industry. Engineering, Construction and Architectural Management, 23(01), 92-112.
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(01), 60-74.
Chung, W W S, Tariq, S, Mohandes, S R and Zayed, T (2023) IoT-based application for construction site safety monitoring. International Journal of Construction Management, 23(01), 58–74.
Dalirazar, S and Sabzi, Z (2023) Strategic analysis of barriers and solutions to development of sustainable buildings using pestle technique. International Journal of Construction Management, 23(01), 167–81.
Dinh, T N, Kuo, K C, Lu, W M and Nguyen, D T (2023) The effect of quantitative easing on Asian construction firms' performance. International Journal of Construction Management, 23(01), 38–47.
Enshassi, A, Al-Swaity, E, Abdul Aziz, A R and Choudhry, R (2018) Coping behaviors to deal with stress and stressor consequences among construction professionals. Journal of Financial Management of Property and Construction, 23(01), 40–56.
Famakin, I O, Aigbavboa, C and Molusiwa, R (2023) Exploring challenges to implementing health and safety regulations in a developing economy. International Journal of Construction Management, 23(01), 89–97.
Gong, C, Xu, H, Xiong, F, Zuo, J and Dong, N (2023) Factors impacting BIM application in prefabricated buildings in China with DEMATEL-ISM. Construction Innovation, 23(01), 19-37.
Goulding, J S, Ezcan, V and Sutrisna, M (2018) Securing the embeddedness of psychosocial diffusion indicators into the Turkish construction industry. Journal of Financial Management of Property and Construction, 23(01), 90–111.
Grove, E, Dainty, A, Thomson, D and Thorpe, T (2018) Becoming collaborative: a study of intra-organisational relational dynamics. Journal of Financial Management of Property and Construction, 23(01), 6–23.
Haupt, T C, Munshi, M and Smallwood, J (2005) HIV and AIDS in South African construction: is age nothing but a number?. Construction Management and Economics, 23(01), 107-19.
Holt, G D, Goulding, J S and Akintoye, A (2016) Enablers, challenges and relationships between research impact and theory generation. Engineering, Construction and Architectural Management, 23(01), 20-39.
Karki, S and Hadikusumo, B (2023) Machine learning for the identification of competent project managers for construction projects in Nepal. Construction Innovation, 23(01), 1-18.
Kineber, A F, Othman, I, Oke, A E, Chileshe, N and Zayed, T (2023) Value management implementation barriers for sustainable building: a bibliometric analysis and partial least square structural equation modeling. Construction Innovation, 23(01), 38-73.
Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(01), 9-14.
Larsen, G D and Ballal, T M A (2005) The diffusion of innovations within a UKCI context: an explanatory framework. Construction Management and Economics, 23(01), 81-91.
Leung, M-Y, Ng, T S, Skitmore, M and Cheung, S-O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(01), 33-44.
Manoharan, K, Dissanayake, P, Pathirana, C, Deegahawature, D and Silva, R (2023) Assessment of critical factors influencing the performance of labour in Sri Lankan construction industry. International Journal of Construction Management, 23(01), 144–55.
Mehta, R and Bridwell, L (2005) Innovative construction technology for affordable mass housing in Tanzania, East Africa. Construction Management and Economics, 23(01), 69-79.
Morrow, S, Hare, B and Cameron, I (2016) Design engineers’ perception of health and safety and its impact in the design process. Engineering, Construction and Architectural Management, 23(01), 40-59.
Nguyen, H T and Hadikusumo, B H (2018) Human resource related factors and engineering, procurement, and construction (EPC) project success. Journal of Financial Management of Property and Construction, 23(01), 24–39.
Oladimeji, O and Aina, O O (2018) Financial performance of locally owned construction firms in southwestern Nigeria. Journal of Financial Management of Property and Construction, 23(01), 112–28.
Oladinrin, O T and Ho, C M-F (2016) Embeddedness of codes of ethics in construction organizations. Engineering, Construction and Architectural Management, 23(01), 75-91.
Oo, B L and Lim, B T-H (2016) Game-based learning in construction management courses: A case of bidding game. Engineering, Construction and Architectural Management, 23(01), 4-19.
Oyuga, J O, Gwaya, A and Njuguna, M B (2023) Investigation of the current usage of BIM capabilities by large-sized building contractors in Kenya based on theory of innovation diffusion. Construction Innovation, 23(01), 155-77.
Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: an empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(01), 45-56.
Porwal, A, Parsamehr, M, Szostopal, D, Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(01), 156–66.
Potter, E M, Egbelakin, T, Phipps, R and Balaei, B (2018) Emotional intelligence and transformational leadership behaviours of construction project managers. Journal of Financial Management of Property and Construction, 23(01), 73–89.
Ramanayaka, C D E, Olatunji, O A and Rotimi, J O (2023) Critical success factors of strategy-led planning of high-profile projects. International Journal of Construction Management, 23(01), 75–88.
Rosli, M F, Muhammad Tamyez, P F and Zahari, A R (2023) The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance. International Journal of Construction Management, 23(01), 114–25.
Roy, R, Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(01), 57-67.
Sagar, S K, Oladinrin, O T, Arif, M and Rana, M Q (2023) Interpretive structural model of trust factors in construction virtual project teams. Construction Innovation, 23(01), 248-64.
Salem, D and Elwakil, E (2023) Asset condition assessment model for healthcare facilities. International Journal of Construction Management, 23(01), 182–203.
Sampath, D, De Silva, N and Withanage, K T (2023) Entrepreneurial potentials in Sri Lankan quantity surveyors. International Journal of Construction Management, 23(01), 48-57.
Sarireh, M (2023) Testing the use of volcanic tuff in base and sub-base pavement construction in Jordan. International Journal of Construction Management, 23(01), 126–34.
Sayed, M, Abdel-Hamid, M and El-Dash, K (2023) Improving cost estimation in construction projects. International Journal of Construction Management, 23(01), 135–43.
Seyman Guray, T and Kismet, B (2023) Applicability of a digitalization model based on augmented reality for building construction education in architecture. Construction Innovation, 23(01), 193-212.
Shafiei, I, Eshtehardian, E, Nasirzadeh, F and Arabi, S (2023) Dynamic modeling to reduce the cost of quality in construction projects. International Journal of Construction Management, 23(01), 24–37.
Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(01), 1–12.
Sompolgrunk, A, Banihashemi, S and Mohandes, S R (2023) Building information modelling (BIM) and the return on investment: a systematic analysis. Construction Innovation, 23(01), 129-54.
Stride, M, Renukappa, S, Suresh, S and Egbu, C (2023) The effects of COVID-19 pandemic on the UK construction industry and the process of future-proofing business. Construction Innovation, 23(01), 105-28.
Tang, S L, Ying, K C, Anson, M and Lu, M (2005) RMCSIM: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(01), 15-31.
Tetteh, M O, Chan, A P C, Darko, A and Nani, G (2023) Factors affecting international construction joint ventures: A systematic literature review. International Journal of Construction Management, 23(01), 98–113.
Vibhakar, N N, Tripathi, K K, Johari, S and Jha, K N (2023) Identification of significant financial performance indicators for the Indian construction companies. International Journal of Construction Management, 23(01), 13–23.
Wuni, I Y, Shen, G Q and Antwi-Afari, M F (2023) Exploring the design risk factors for modular integrated construction projects. Construction Innovation, 23(01), 213-28.
Yuan, W, Yang, R, Yu, J, Zeng, Q and Yao, Z (2023) Control method of spray curing system for cement concrete members based on the AdaBoost.M1 algorithm. Construction Innovation, 23(01), 178-92.