ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 76 results ...

Ökmen , Ö and Öztaß, A (2015) Scenario-based evaluation of a cost risk model through sensitivity analysis. Engineering, Construction and Architectural Management, 22(04), 403-23.

Abbas, M A, Ajayi, S O, Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(04), 1306-24.

Abeynayake, D N, Perera, B A K S and Hadiwattege, C (2022) A roadmap for business model adaptation in the construction industry: a structured review of business model research. Construction Innovation, 22(04), 1122-37.

Abuezhayeh, S W, Ruddock, L and Shehabat, I (2022) Integration between knowledge management and business process management and its impact on the decision making process in the construction sector: a case study of Jordan. Construction Innovation, 22(04), 987-1010.

Ahankoob, A, Manley, K and Abbasnejad, B (2022) The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM. International Journal of Construction Management, 22(04), 588-99.

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(04), 1136-57.

Albeaino, G, Eiris, R, Gheisari, M and Issa, R R (2022) DroneSim: a VR-based flight training simulator for drone-mediated building inspections. Construction Innovation, 22(04), 831-48.

AlShemeili, H, Davidson, R and Khalid, K (2024) Impact of empowering leadership on safety behavior and safety climate: mediating and moderating role of safety monitoring. Journal of Engineering, Design and Technology, 22(04), 1282-305.

Amarkhil, Q and Elwakil, E (2022) Construction organization success strategy in post-conflict environment. International Journal of Construction Management, 22(04), 701-10.

Amiri, O, Ayazi, A, Rahimi, M and Khazaeni, G (2022) Risks of water and wastewater PPP projects: an investors’ perspective. Construction Innovation, 22(04), 1104-21.

Arefazar, Y, Nazari, A, Hafezi, M R and Maghool, S A H (2022) Prioritizing agile project management strategies as a change management tool in construction projects. International Journal of Construction Management, 22(04), 678-89.

Asare, E, Owusu-Manu, D G, Ayarkwa, J and Edwards, D J (2024) Conceptual review study of working capital management practices in the construction industry: trends and research prospects in Ghana. Journal of Engineering, Design and Technology, 22(04), 1082-98.

Banerjee, A and Nayaka, R R (2022) A comprehensive overview on BIM-integrated cyber physical system architectures and practices in the architecture, engineering and construction industry. Construction Innovation, 22(04), 727-48.

Blismas, N G, Sher, W, Thorpe, A and Baldwin, A (2004) A typology for clients' multi-project environments. Construction Management and Economics, 22(04), 357-71.

Bröchner, J, Rosander, S and Waara, F (2004) Cross-border post-acquisition knowledge transfer among construction consultants. Construction Management and Economics, 22(04), 421-7.

Bradley, A, Li, H, Qin, H, Xi, W, Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openBIM ISO standards development. Construction Innovation, 22(04), 705-26.

Brown, J and Loosemore, M (2015) Behavioural factors influencing corrupt action in the Australian construction industry. Engineering, Construction and Architectural Management, 22(04), 372-89.

Charles, S H, Chang-Richards, A and Yiu, T W (2022) New success factors for construction projects: a systematic review of post-2004 literature. Construction Innovation, 22(04), 891-914.

Chew, M Y L and Tan, S S (2004) A multivariate approach to maintenance prediction of wet areas. Construction Management and Economics, 22(04), 395-407.

Debrah, C and Owusu-Manu, D G (2022) An apposite framework for green cities development in developing countries: the case of Ghana. Construction Innovation, 22(04), 789-808.

Dou, Y, Xue, X, Wang, Y, Xue, W and Huangfu, W (2022) Evaluation of enterprise technology innovation capability in prefabricated construction in China. Construction Innovation, 22(04), 1059-84.

Ebekozien, A, Abdul-Aziz, A R and Jaafar, M (2022) Moderating effect of government support policy on the relationship between Malaysian LCH leakages, high construction cost and LCH demand-supply: A proposed framework. International Journal of Construction Management, 22(04), 600-11.

Egwim, C N, Alaka, H, Egunjobi, O O, Gomes, A and Mporas, I (2024) Comparison of machine learning algorithms for evaluating building energy efficiency using big data analytics. Journal of Engineering, Design and Technology, 22(04), 1325-50.

Farghaly, K, Collinge, W, Mosleh, M H, Manu, P and Cheung, C M (2022) Digital information technologies for prevention through design (PtD): a literature review and directions for future research. Construction Innovation, 22(04), 1036-58.

Fiorineschi, L, Conti, L, Rossi, G and Rotini, F (2024) Conceptual design of a small production plant for eco-friendly packaging. Journal of Engineering, Design and Technology, 22(04), 1257-81.

Gajanayake, A and Iyer-Raniga, U (2022) Infrastructure financing for climate change adaptation in Australia: Practitioners’ perspectives. Construction Economics and Building, 22(04), 1-16.

Gajanayake, A and Iyer-Raniga, U (2022) Infrastructure financing for climate change adaptation in Australia: Practitioners’ perspectives. Construction Economics and Building, 22(04), 1-16.

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructure investment decisions. Construction Management and Economics, 22(04), 373-83.

Gledson, B (2022) Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation, 22(04), 1085-103.

Govender, N, Laryea, S and Watermeyer, R (2024) Conceptual research methodology to investigate the relationship between fees and quality of professional service outputs. Journal of Engineering, Design and Technology, 22(04), 1185-205.

Gumusburun Ayalp, G (2022) Leadership styles and entrepreneurship orientations in Turkish construction industry. International Journal of Construction Management, 22(04), 690-700.

Hamzaoui, F, Amine Allal, M, Taillandier, F and Achoui, M (2022) Risk management in construction projects by coupling the SMACC agent with the MADS MOSAR method: application to the dam project in Mascara, Algeria. International Journal of Construction Management, 22(04), 644-58.

Hassanain, M A, Sanni-Anibire, M O and Mahmoud, A S (2024) An assessment of users’ satisfaction with a smart building on university campus through post-occupancy evaluation. Journal of Engineering, Design and Technology, 22(04), 1119-35.

Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(04), 446-66.

Kishk, M (2004) Combining various facets of uncertainty in whole-life cost modelling. Construction Management and Economics, 22(04), 429-35.

Konno, Y (2015) Analysing Japanese contractor activity on the basis of panel data. Engineering, Construction and Architectural Management, 22(04), 390-402.

Koo, H J and O’Connor, J T (2022) Building information modeling as a tool for prevention ofdesign defects. Construction Innovation, 22(04), 870-90.

Lam, Y T and Chen, Z (2004) The development of the construction legal system in China. Construction Management and Economics, 22(04), 347-56.

Le, A T H, Domingo, N, Macgregor, C and Potangaroa, R (2022) Conceptualising a framework for construction sector capacity. Construction Economics and Building, 22(04), 17-35.

Le, A T H, Domingo, N, Macgregor, C and Potangaroa, R (2022) Conceptualising a framework for construction sector capacity. Construction Economics and Building, 22(04), 17-35.

Lingard, H and Lin, J (2004) Career, family and work environment determinants of organizational commitment among women in the Australian construction industry. Construction Management and Economics, 22(04), 409-420.

Loosemore, M and Lam, A S Y (2004) The locus of control: a determinant of opportunistic behaviour in construction health and safety. Construction Management and Economics, 22(04), 385-94.

Mohammadi, A, Yang, J, Borgianni, Y and Zeng, Y (2024) Barriers and enablers of TRIZ: a literature analysis using the TASKS framework. Journal of Engineering, Design and Technology, 22(04), 1206-30.

Naghshbandi, S N, Varga, L and Hu, Y (2022) Technology capabilities for an automated and connected earthwork roadmap. Construction Innovation, 22(04), 768-88.

Najjar, M K, Figueiredo, K, Evangelista, A C J, Hammad, A W A, Tam, V W Y and Haddad, A (2022) Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design. International Journal of Construction Management, 22(04), 541-55.

Ojo, L D, Ogunsemi, D R and Ogunsina, O (2022) Conceptual framework of value management adoption in the Nigerian construction industry. Construction Innovation, 22(04), 939-61.

Olugboyega, O and Windapo, A O (2022) Structural equation model of the barriers to preliminary and sustained BIM adoption in a developing country. Construction Innovation, 22(04), 849-69.

Omopariola, E D, Olanrewaju, O I, Albert, I, Oke, A E and Ibiyemi, S B (2024) Sustainable construction in the Nigerian construction industry: unsustainable practices, barriers and strategies. Journal of Engineering, Design and Technology, 22(04), 1158-84.

Othman, A A E and Kamal, A R (2024) A framework for enhancing building maintainability through facilitating early suppliers’ involvement in the design process. Journal of Engineering, Design and Technology, 22(04), 1231-56.

Oti, A H, Farrell, P, Abanda, F H, McMahon, P, Mahamadu, A M, Mzyece, D, Akintola, A A and Prinja, N (2022) A BIM-driven framework for integrating rules and regulations in the decommissioning of nuclear power plants. Construction Innovation, 22(04), 809-30.

Palsodkar, M, Yadav, G and Nagare, M R (2024) Integrating Industry 4.0 and agile new product development practices to evaluate the penetration of sustainable development goals in manufacturing industries. Journal of Engineering, Design and Technology, 22(04), 1351-92.

Perera, B A K S, Ridmika, K I and Wijewickrama, M K C S (2022) Life management of the quantity surveyors working for contractors at sites: female vs male. Construction Innovation, 22(04), 962-86.

Pham, H, Pham, T and Dang, C N (2022) Assessing the importance of transformational leadership competencies and supply chain learning to green innovation: construction practitioners’ perspectives. Construction Innovation, 22(04), 1138-54.

Pramudya, A A and Wibowo, A (2022) Ranking risks of BOT toll road investment projects in Indonesia using fuzzy interpretive structural modelling. Construction Economics and Building, 22(04), 59-80.

Pramudya, A A and Wibowo, A (2022) Ranking risks of BOT toll road investment projects in Indonesia using fuzzy interpretive structural modelling. Construction Economics and Building, 22(04), 59-80.

Ramani, P V and Lingan, L K (2022) Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(04), 669-77.

Rodrigo, G A, Perera, B A K S and Ekanayake, B J (2022) Occupant perceptions on the thermal comfort guidelines in air-conditioned offices in Colombo, Sri Lanka. International Journal of Construction Management, 22(04), 579-87.

Rogers, J, Chong, H-Y and Preece, C (2015) Adoption of building information modelling technology: Perspectives from Malaysian engineering consulting services firms. Engineering, Construction and Architectural Management, 22(04), 424-45.

Rotimi, E O O, Rotimi, F E, Silva, C W C and Aigwi, I E (2024) BIM knowledge transfer in construction industry: a partial least square analysis. Journal of Engineering, Design and Technology, 22(04), 1393-411.

Ruiz, R D B, Lordsleem Jr, A C, Rocha, J H A and Irizarry, J (2022) Unmanned aerial vehicles (UAV) as a tool for visual inspection of building facades in AEC+FM industry. Construction Innovation, 22(04), 1155-70.

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(04), 711-31.

Schnell, P (2022) Examination of the communication strategy based on company straplines: A case study of German construction companies. Construction Economics and Building, 22(04), 81-97.

Schnell, P (2022) Examination of the communication strategy based on company straplines: A case study of German construction companies. Construction Economics and Building, 22(04), 81-97.

Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(04), 659-68.

Stanitsa, A, Hallett, S H and Jude, S (2024) The challenges of implementing evidence-based strategies to inform building and urban design decisions: a view from current practice. Journal of Engineering, Design and Technology, 22(04), 1099-118.

Suprun, E, Sahin, O, Anthony Stewart, R and Panuwatwanich, K (2022) Examining transition pathways to construction innovation in Russia: A system dynamics approach. International Journal of Construction Management, 22(04), 556-78.

Taofeeq, D M, Adeleke, A Q and Lee, C K (2022) Individual factors influencing contractors' risk attitudes among Malaysian construction industries: The moderating role of government policy. International Journal of Construction Management, 22(04), 612-31.

Tariq, S, Hussein, M, Wang, R D and Zayed, T (2022) Trends and developments of on-site crane layout planning 1983–2020: bibliometric, scientometric and qualitative analyses. Construction Innovation, 22(04), 1011-35.

Tjandra, K D, Irawan, F G, Nugraha, P and Sunindijo, R Y (2022) Drone readiness in the Indonesian construction industry. Construction Economics and Building, 22(04), 36-58.

Tjandra, K D, Irawan, F G, Nugraha, P and Sunindijo, R Y (2022) Drone readiness in the Indonesian construction industry. Construction Economics and Building, 22(04), 36-58.

Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(04), 1057-81.

White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(04), 632-43.

Wuni, I Y, Shen, G Q and Darko, A (2022) Best practices for implementing industrialized construction projects: lessons from nine case studies. Construction Innovation, 22(04), 915-38.

Yiu, C Y, Lu, X H, Leung, M Y and Jin, W X (2004) A longitudinal analysis on the relationship between construction output and GDP in Hong Kong. Construction Management and Economics, 22(04), 339-45.

Yusof, N, Lai, K S and Marisa, A (2022) Influences of client focus and company type on innovation and financial performance in the construction industry. Construction Innovation, 22(04), 749-67.

Zafar, I, Wuni, I Y, Shen, G Q P, Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(04), 732-50.