ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 60 results ...
Ke, Y, Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects . Construction Economics and Building, 16(03), 20-37.
Abadou, Y, Kettab, R and Ghreib, A (2018) Experimental investigation on the carbonation properties of dune sand ceramic waste mortar. Journal of Engineering, Design and Technology, 16(03), 501–16.
Adamtey, S and Onsarigo, L (2018) Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(03), 461–77.
Agapiou, A, Flanagan, R, Norman, G and Notman, D (1998) The changing role of builders' merchants in the construction supply-chain. Construction Management and Economics, 16(03), 351-61.
Al-Saadi, R and Abdou, A (2016) Factors critical for the success of public?private partnerships in UAE infrastructure projects: Experts' perception. International Journal of Construction Management, 16(03), 234-48.
Aluko, R O, Daniel, E I, Shamsideen Oshodi, O, Aigbavboa, C O and Abisuga, A O (2018) Towards reliable prediction of academic performance of architecture students using data mining techniques. Journal of Engineering, Design and Technology, 16(03), 385–97.
Atkinson, A R (1998) Human error in the management of building projects. Construction Management and Economics, 16(03), 339-49.
Belpoliti, V, Nassif, R, Alzaabi, E and Aljneibi, A (2020) Multi-criteria assessment for the functional-energy upgrade of the UAE school sector: a bottom-up approach promoting refurbishment versus new construction. Architectural Engineering and Design Management, 16(03), 167–90.
Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(03), 327-37.
Byrne, P, McAllister, P and Wyatt, P (2011) Precisely wrong or roughly right? An evaluation of development viability appraisal modelling. Journal of Financial Management of Property and Construction, 16(03), 249–71.
Coggins, J, Teng, B and Rameezdeen, R (2016) Construction insolvency in Australia: reining in the beast . Construction Economics and Building, 16(03), 38-56.
Dadashnejad, A and Valmohammadi, C (2018) Investigating the effect of value stream mapping on operational losses: a case study. Journal of Engineering, Design and Technology, 16(03), 478–500.
Davis, P, Gajendran, T, Vaughan, J and Owi, T (2016) Assessing construction innovation: theoretical and practical perspectives . Construction Economics and Building, 16(03), 104-115.
Eadie, R, Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(03), 197–210.
Egbu, C O, Young, B A and Torrance, V B (1998) Planning and control methods, tools and techniques used by refurbishment management. Construction Management and Economics, 16(03), 315-25.
Enshassi, A, Ayyash, A and Choudhry, R M (2016) BIM for construction safety improvement in Gaza Strip: Awareness, applications and barriers. International Journal of Construction Management, 16(03), 249-65.
Faccio, M, Gamberi, M, Nedaei, M and Pilati, F (2018) Technical and economic modelling and evaluation of a water distribution system equipped with an autoclave for industrial production applications. Journal of Engineering, Design and Technology, 16(03), 342–59.
Gurmu, A, T, Aibinu, A, A and Chan, T, K (2016) A study of best management practices for enhancing productivity in building projects: construction methods perspectives . Construction Economics and Building, 16(03), 1-19.
Hallowell, M R, Hardison, D and Desvignes, M (2016) Information technology and safety: Integrating empirical safety risk data with building information modeling, sensing, and visualization technologies. Construction Innovation, 16(03), 323-47.
Hardie, M (2016) Vectors of technical innovation delivery by small and medium Australian construction firms. Construction Economics and Building, 16(03), 59-70.
Hassan, O A and Johansson, C (2018) Glued laminated timber and steel beams. Journal of Engineering, Design and Technology, 16(03), 398–417.
Hildreth, J C (2020) Effect of Period Length on Forecasting Maintenance and Repair Costs for Heavy Equipment by the Period Cost Based Methodology. International Journal of Construction Education and Research, 16(03), 167–79.
Holt, G D (2016) Opposing influences on construction plant and machinery health and safety innovations. Construction Innovation, 16(03), 390-414.
Holt, G D and Goulding, J S (2016) Positioning construction businesses on an 'evolution?innovation' continuum: Conceptualization of the 'equivocal zone'. International Journal of Construction Management, 16(03), 220-33.
Hosseini, M, R, Banihashemi, S, Chileshe, N, Namzadi, M. O, Udaeja, C, Rameezdeen, R and McCuen, T (2016) BIM adoption within Australian Small and Medium-sized Enterprises (SMEs): an innovation diffusion model . Construction Economics and Building, 16(03), 71-86.
Ishak, S, S, M and Newton, S (2016) An innovation resistance factor model . Construction Economics and Building, 16(03), 87-103.
Jensen, D A and Craig, J W (1998) Testing the validity of liquidated damages clauses: measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(03), 269-81.
Jensen, D A and Craig, J W (1998) The impact of TAMRA '88 on US construction accounting practices. Construction Management and Economics, 16(03), 303-13.
Kalua, A, Jeong Jo, S, Fateminasab, S, Al-Rqaibat, S and Opitz, C (2020) Impact of ventilation method on residential indoor PM dispersion during dust storm events in Saudi Arabia. Architectural Engineering and Design Management, 16(03), 191–208.
Karimi, H, Taylor, T R B, Goodrum, P M and Srinivasan, C (2016) Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation, 16(03), 307-22.
Lai, K S, Yusof, N A and Kamal, E M (2016) Organizational culture of the architectural firm: A case in a developing country. International Journal of Construction Management, 16(03), 197-208.
Lee, W and Migliaccio, G C (2016) Physiological cost of concrete construction activities. Construction Innovation, 16(03), 281-306.
Liu, M, Han, S and Lee, S (2016) Tracking-based 3D human skeleton extraction from stereo video camera toward an on-site safety and ergonomic analysis. Construction Innovation, 16(03), 348-67.
Lowe, J (2011) Concentration in the UK construction sector. Journal of Financial Management of Property and Construction, 16(03), 232–48.
Mansfield, J R (2009) The use of formalised risk management approaches by UK design consultants in conservation refurbishment projects. Engineering, Construction and Architectural Management, 16(03), 273–87.
Ng, S T, Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(03), 224–37.
Olaleye, A (2011) The effects of adding real estate into mixed-asset portfolios in South Africa. Journal of Financial Management of Property and Construction, 16(03), 272–82.
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(03), 360–84.
Olatunji, O A (2011) Modelling the costs of corporate implementation of building information modelling. Journal of Financial Management of Property and Construction, 16(03), 211–31.
Othman, A A E and Elsaay, H (2018) A learning-based framework adopting post occupancy evaluation for improving the performance of architectural design firms. Journal of Engineering, Design and Technology, 16(03), 418–38.
Owusu-Manu, D, Kukah, A, Edwards, D J, Pärn, E A, El-Gohary, H and Aigbavboa, C (2018) Causal relationships of moral hazard and adverse selection of Ghanaian Public-Private-Partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 16(03), 439–60.
Peansupap, V and Walker, D H T (2009) Exploratory factors influencing design practice learning within a Thai context. Engineering, Construction and Architectural Management, 16(03), 238–53.
Perrenoud, A J (2020) Delphi Approach to Identifying Best Practices for Succession Planning within Construction Firms.. International Journal of Construction Education and Research, 16(03), 197–210.
Raftery, J (1998) From Ptolemy to Heisenberg: quantitive models and reality. Construction Management and Economics, 16(03), 295-302.
Rameezdeen, R, Chileshe, N, Hosseini, M R and Lehmann, S (2016) A qualitative examination of major barriers in implementation of reverse logistics within the South Australian construction sector. International Journal of Construction Management, 16(03), 185-96.
Saeb, A, Mohd Danuri, M S B, Zakaria, N B and Mohamed, O B (2020) A Case Study of Dispute Resolution Methods Pertaining to the Construction Standard Form in Iran. International Journal of Construction Education and Research, 16(03), 211–30.
Saka, A B and Chan, D W (2020) Knowledge, skills and functionalities requirements for quantity surveyors in building information modelling (BIM) work environment: an international Delphi study. Architectural Engineering and Design Management, 16(03), 227–46.
Sang, K J C, Ison, S G and Dainty, A R J (2009) The job satisfaction of UK architects and relationships with work-life balance and turnover intentions. Engineering, Construction and Architectural Management, 16(03), 288–300.
Siddula, M, Dai, F, Ye, Y and Fan, J (2016) Classifying construction site photos for roof detection: A machine-learning method towards automated measurement of safety performance on roof sites. Construction Innovation, 16(03), 368-89.
Sunindijo, R Y and Kamardeen, I (2020) Psychological challenges confronting graduate construction students in Australia. International Journal of Construction Education and Research, 16(03), 151–66.
Teizer, J (2016) Right-time vs real-time pro-active construction safety and health system architecture. Construction Innovation, 16(03), 253-80.
Toor, S-u-R and Ogunlana, S (2009) Ineffective leadership: Investigating the negative attributes of leaders and organizational neutralizers. Engineering, Construction and Architectural Management, 16(03), 254–72.
Troiani, E, Mahamadu, A, Manu, P, Kissi, E, Aigbavboa, C and Oti, A (2020) Macro-maturity factors and their influence on micro-level BIM implementation within design firms in Italy. Architectural Engineering and Design Management, 16(03), 209–26.
Vassigh, S, Davis, D, Behzadan, A H, Mostafavi, A, Rashid, K, Alhaffar, H, Elias, A and Gallardo, G (2020) Teaching Building Sciences in Immersive Environments: A Prototype Design, Implementation, and Assessment. International Journal of Construction Education and Research, 16(03), 180–96.
Vidogah, W and Ndekugri, I E (1998) Improving the management of claims on construction contracts: consultants' perspective. Construction Management and Economics, 16(03), 363-72.
Wan, S K M and Kumaraswamy, M M (2009) Industrial management approaches for improving material control in building services works. Engineering, Construction and Architectural Management, 16(03), 208–23.
Wang, C-H, Wang, M-W and Huang, Y-C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(03), 257-67.
Wapwera, S D, Parsa, A and Egbu, C (2011) Financing low income housing in Nigeria. Journal of Financial Management of Property and Construction, 16(03), 283–301.
Yogeswaran, K, Kumaraswamy, M M and Miller, D R A (1998) Claims for extension of time in civil engineering projects. Construction Management and Economics, 16(03), 283-93.
Zahoor, H, Chan, A P C, Masood, R, Choudhry, R M, Javed, A A and Utama, W P (2016) Occupational safety and health performance in the Pakistani construction industry: Stakeholders' perspective. International Journal of Construction Management, 16(03), 209-19.