ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 76 results ...
Abd-Elnaby, A H A and Reffat, R M (2024) Enhancing BIM-BEM integration: solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(03), 596–623.
Adaku, E, Ankrah, N A and Ndekugri, I E (2022) Prevention through design: conceptual models for the assessment of a principal designer’s skills, knowledge and experience. Journal of Engineering, Design and Technology, 20(03), 595-623.
Adam, V, Manu, P, Mahamadu, A M, Dziekonski, K, Kissi, E, Emuze, F and Lee, S (2022) Building information modelling (BIM) readiness of construction professionals: the context of the Seychelles construction industry. Journal of Engineering, Design and Technology, 20(03), 823-40.
Al-Saeed, Y, Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs). Construction Innovation , 20(03), 345–77.
Alabdullah, M M, Al-Naim, M and El-Wakeel, H (2024) Developing a tool to assess the performance of educational built environments for students with multiple sclerosis. Architectural Engineering and Design Management, 20(03), 494–509.
Alateeq, A, Elmedany, W, Ababneh, N and Curran, K (2022) Secure energy aware routing protocol for IEEE 802.15.4 wireless sensor networks. Journal of Engineering, Design and Technology, 20(03), 569-94.
Alves Tenório de Morais, G, R. S. de M. S. Nascimento, C, dos Santos, E B, M. N. de Souza, K, Fernandes, B S and Palha, R P (2024) Integration potential between REVIT and LEED: a review. Architectural Engineering and Design Management, 20(03), 510–25.
Ameyaw, C, Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(03), 268-85.
Anson, M, Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(03), 237-50.
Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(03), 207-22.
Barrett, J, Goulding, J and Qualter, P (2013) The social life of the novel idea: what did social psychologists ever do for us?. Engineering, Construction and Architectural Management, 20(03), 250-66.
Cao, S, Duan, H, Guo, S, Wu, J, Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(03), 656–72.
Chamikara, P B S, Perera, B A K S and Rodrigo, M N N (2020) Competencies of the quantity surveyor in performing for sustainable construction. International Journal of Construction Management, 20(03), 237-51.
Chang, C-Y and Ive, G (2002) Rethinking the multi-attribute utility approach based procurement route selection technique. Construction Management and Economics, 20(03), 275-84.
Charles, Q W, Sospeter, N G, Kikwasi, G and Chileshe, N (2024) Attraction and Retention Factors for Female Students into Construction-Related Programs in Developing Countries: The Case of Tanzania. International Journal of Construction Education and Research, 20(03), 263–83.
Chen, Q, Adey, B T, Haas, C and Hall, D M (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation , 20(03), 471–508.
Chen, Y and Ding, C (2024) Multidimensional evolutionary analysis of China’s BIM technology policy based on quantitative mapping. Architectural Engineering and Design Management, 20(03), 578–95.
Dickerson, D E (2024) Construction Health Hazard Control Innovations: A Web-Based Intervention to Change Perceptions. International Journal of Construction Education and Research, 20(03), 243–62.
El-Rayes, K, Ramanthan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(03), 201-10.
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation , 20(03), 401–20.
Fahmy, K A, Yahya, A and Zorkany, M (2022) A decision support healthcare system based on IoT and neural network technique. Journal of Engineering, Design and Technology, 20(03), 727-48.
Furci, J and Sunindijo, R Y (2020) Impacts of the whs act 2011 on safety management in small and medium construction companies. International Journal of Construction Management, 20(03), 196-206.
Ghanbari, M, Rusch, R and Skitmore, M (2024) BIM-based environmental assessment of residential renovation projects during the operational phase. Architectural Engineering and Design Management, 20(03), 624–35.
Ghanbaripour, A N, Sher, W and Yousefi, A (2020) Critical success factors for subway construction projects: main contractors' perspectives. International Journal of Construction Management, 20(03), 177-95.
Ghansah, F A, Owusu-Manu, D G, Ayarkwa, J, Edwards, D J and Hosseini, M R (2022) Assessing the level of awareness of smart building technologies (SBTs) in the developing countries. Journal of Engineering, Design and Technology, 20(03), 696-711.
Gradeci, K and Labonnote, N (2020) On the potential of integrating building information modelling (BIM) for the additive manufacturing (AM) of concrete structures. Construction Innovation, 20(03), 321–43.
Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(03), 624-48.
Henderson, J R, Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(03), 290-306.
Hua, Y, Zhang, Y and Ma, P (2024) The mediating effect of BIM application on the link between organizational support and BIM user satisfaction. Architectural Engineering and Design Management, 20(03), 636–55.
Inan Gunaydin, T (2022) Wind flow on and around U-shaped buildings. Journal of Engineering, Design and Technology, 20(03), 841-59.
Kamardeen, I and Samaratunga, M (2020) DigiExplanation-driven assignments for personalising learning in construction education. Construction Economics and Building, 20(03), 103-123.
Kassa, R, Ogundare, T I, Lines, B, Smithwick, J and Sullivan, K (2024) Comparative Analysis of Human Traits and Tendencies: General vs. Specialty Contractor Project Managers. International Journal of Construction Education and Research, 20(03), 284–300.
Kirkham, R J, Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings. Construction Management and Economics, 20(03), 251-61.
Leblanc, H, Thomson, C, Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(03), 232-49.
Leon, M and Laing, R (2022) A concept design stages protocol to support collaborative processes in architecture, engineering and construction projects. Journal of Engineering, Design and Technology, 20(03), 777-99.
Li, S and Xu, Z (2024) Logical object structure and system implementation for BIM database in civil infrastructures. Architectural Engineering and Design Management, 20(03), 448–70.
Li, S and Xu, Z (2024) Research on IFC instance data based on topology induction network. Architectural Engineering and Design Management, 20(03), 526–58.
Lingard, H (2002) The effect of first aid training on Australian construction workers' occupational health and safety knowledge and motivation to avoid work-related injury or illness. Construction Management and Economics, 20(03), 263-73.
Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation , 20(03), 447–70.
Marisa, A and Yusof, N (2020) Factors influencing the performance of architects in construction projects. Construction Economics and Building, 20(03), 20-36.
Marocco, M, Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations’ processes in the design phase. Architectural Engineering and Design Management, 20(03), 411–30.
McCord, J, McCord, M, Davis, P T, Haran, M and Rodgers, W J (2015) Understanding delays in housing construction: evidence from Northern Ireland. Journal of Financial Management of Property and Construction, 20(03), 286-319.
McNamara, A J and Sepasgozar, S M (2020) Developing a theoretical framework for intelligent contract acceptance. Construction Innovation , 20(03), 421–45.
Mishra, A, Hasan, A and Jha, K N (2024) A Holistic Evaluation of BIM Implementation Barriers in the Indian Construction Industry: Pre- and Post-Adoption Perspectives. International Journal of Construction Education and Research, 20(03), 358–80.
Mohamed, A G and Marzouk, M (2024) A BIM-based semantic approach for fund-allocation of building components. Architectural Engineering and Design Management, 20(03), 471–93.
Nasirzadeh, F, Ghayoumian, M, Khanzadi, M and Rostamnezhad Cherati, M (2020) Modelling the social dimension of sustainable development using fuzzy cognitive maps. International Journal of Construction Management, 20(03), 223-36.
Ndekugri, I, Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(03), 267-89.
Ng, S T, Luu, D T, Chen, S E and Lam, K C (2002) Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(03), 285-96.
Nwaogu, J M, Chan, A P C and Tetteh, M O (2022) Staff resilience and coping behavior as protective factors for mental health among construction tradesmen. Journal of Engineering, Design and Technology, 20(03), 671-95.
Ochieng, E G, Price, A D F, Ruan, X, Egbu, C O and Moore, D (2013) The effect of cross-cultural uncertainty and complexity within multicultural construction teams. Engineering, Construction and Architectural Management, 20(03), 307-24.
Oke, A E, Aliu, J and Onajite, S A (2024) Barriers to the adoption of digital technologies for sustainable construction in a developing economy. Architectural Engineering and Design Management, 20(03), 431–47.
Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(03), 235-51.
Oo, B L, Lim, B and Feng, S (2020) Early career women in construction: are their career expectations being met?. Construction Economics and Building, 20(03), 1-19.
Panjaitan, N, Hasnida, A S and Ali, A Y (2022) Mesoergonomics, the missing part of the macroergonomics and microergonomics approach. Journal of Engineering, Design and Technology, 20(03), 649-70.
Queiroz, N, Fernandes, L and Pereira, F O R (2024) Comparison of fast daylighting climate-based simulation methods for parametric design: two-phase, three-phase method and path tracing. Architectural Engineering and Design Management, 20(03), 559–77.
Ruge, G and Mackintosh, L (2020) Facilitating reflective practice: developing built environment educators' capacity for teaching and learning. Construction Economics and Building, 20(03), 160-174.
Sarvari, H, Asaadsamani, P, Olawumi, T O, Chan, D W, Rashidi, A and Beer, M (2024) Perceived barriers to implementing building information modeling in Iranian Small and Medium-Sized Enterprises (SMEs): a Delphi survey of construction experts. Architectural Engineering and Design Management, 20(03), 673–93.
Setiawan, H and Erdogan, B (2020) Key factors for successful corporate entrepreneurship: A study of Indonesian contractors. International Journal of Construction Management, 20(03), 252-68.
Shehata, A O, Megahed, N A, Hassan, A M and Shahda, M M (2024) Holistic SWOT based matrix of BIM adoption in heritage green retrofitting processes. Architectural Engineering and Design Management, 20(03), 694–718.
Siew, R Y J (2015) Predicting the behaviour of Australian ESG REITs using Markov chain analysis. Journal of Financial Management of Property and Construction, 20(03), 252-67.
Singh, P, Boora, A and Gupta, A K (2022) Sub-grade characteristics of clayey soil incorporating municipal solid waste incineration ash and marble dust. Journal of Engineering, Design and Technology, 20(03), 712-26.
Smallwood, J J and Allen, C (2020) The impact of a first-year orientation team building exercise. Construction Economics and Building, 20(03), 142-159.
Sospeter, N G, Rwelamila, P D and Gimbi, J (2020) Critical success factors for managing post-disaster reconstruction projects: the case of Angola. Construction Economics and Building, 20(03), 37-55.
Tahmasebinia, F, M.E. Sepasgozar, S, Shirowzhan, S, Niemela, M, Tripp, A, Nagabhyrava, S, Mansuri, k k Z and Alonso-Marroquin, F (2020) Criteria development for sustainable construction manufacturing in Construction Industry 4.0. Construction Innovation , 20(03), 379–400.
Tews, T, Skulmoski, G, Langston, C and Patching, A (2020) Innovation in project management education: let's get serious. Construction Economics and Building, 20(03), 124-141.
Thomson, D S, Austin, S A, Mills, G R and Devine-Wright, H (2013) Practitioner understanding of value in the UK building sector. Engineering, Construction and Architectural Management, 20(03), 214-31.
Toke, L K and Kalpande, S D (2022) Strategic planning to investigate the decision index of organization for effective total quality management implementation – in context of Indian small and medium enterprises. Journal of Engineering, Design and Technology, 20(03), 749-76.
Tregloan, K, Thompson, J, Holland, S and Song, H ( (2024) Unreal … a Typology for Learning from Virtual Site Visits. International Journal of Construction Education and Research, 20(03), 301–21.
Udofia, W U, Hadikusumo, B H W and Santoso, D S (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction, 20(03), 208-34.
Ullah, F, Sepasgozer, S, Tahmasebinia, F, Sepasgozar, S M E and Davis, S (2020) Examining the impact of students' attendance, sketching, visualization, and tutors' experience on students' performance: a case of building structures course in construction management. Construction Economics and Building, 20(03), 78-102.
Viknaruban, M, Devapriya, K and Parameswaran, A (2024) Project Management Practices to Address the Challenges in International Construction Joint Ventures in the Sri Lankan Construction Industry. International Journal of Construction Education and Research, 20(03), 322–57.
Wen, J and Gheisari, M (2020) Using virtual reality to facilitate communication in the AEC domain: a systematic review. Construction Innovation , 20(03), 509–42.
Williams, T P (2002) Predicting completed project cost bidding data. Construction Management and Economics, 20(03), 225-35.
Yap, J B H, Lim, B L, Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(03), 800-22.
Yasamis, F, Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(03), 211-23.
Zhang, S, Duan, H, Wei, T and Shane, G (2020) A review of university-enterprise-cooperation research in China: a quantitative perspective. Construction Economics and Building, 20(03), 62-77.