ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 64 results ...

Álvares, J S, Costa, D B and Melo, R R S d (2018) Exploratory study of using unmanned aerial system imagery for construction site 3D mapping. Construction Innovation, 18(03), 301–20.

Abdul-Aziz, A-R and Wong, S-S (2011) Business networks and internationalisation of contractors from developing countries: an explorative study. Engineering, Construction and Architectural Management, 18(03), 282–96.

Ahmed, S and El-Sayegh, S (2022) The challenges of sustainable construction projects delivery – evidence from the UAE. Architectural Engineering and Design Management, 18(03), 299–312.

Amida, A, Chang, I and Yearwood, D (2019) Designing a practical lab-based assessment: a case study. Journal of Engineering, Design and Technology , 18(03), 567–81.

Amoah, C and Pretorius, L (2019) Evaluation of the impact of risk management on project performance in small construction firms in South Africa. Journal of Engineering, Design and Technology , 18(03), 611–34.

Amuda-Yusuf, G (2018) Critical Success Factors for Building Information Modelling Implementation . Construction Economics and Building, 18(03), 55-73.

Annamalai, T R and Jain, N (2013) Project finance and investments in risky environments: evidence from the infrastructure sector. Journal of Financial Management of Property and Construction, 18(03), 251-67.

Asiedu, R O and Gyadu-Asiedu, W (2019) Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo. Journal of Engineering, Design and Technology , 18(03), 583–600.

Aydin, Y C and Mirzaei, P A (2022) A novel mathematical model to measure individuals’ perception of the symmetry level of building facades. Architectural Engineering and Design Management, 18(03), 261–78.

Behnia, B, Kheirollahi, M, Sahragard, M and Soltanifar, A (2022) A conceptual model for children’s participation in the architectural design process: exploring deep participation. Architectural Engineering and Design Management, 18(03), 344–67.

Bickerton, M and Gruneberg, S L (2013) The London Interbank Offered Rate (LIBOR) and UK construction industry output 1990-2008. Journal of Financial Management of Property and Construction, 18(03), 268-81.

Bower, D A (2000) A systematic approach to the evaluation of indirect costs of contract variations. Construction Management and Economics, 18(03), 263-8.

Cheung, S-O, Tam, C M, Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(03), 281-94.

d'Apolito, L and Hong, H (2019) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology , 18(03), 689–703.

Dao, B, Kermanshachi, S, Shane, J, Anderson, S and Damnjanovic, I (2022) Developing a logistic regression model to measure project complexity. Architectural Engineering and Design Management, 18(03), 226–40.

Dixit, V, Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(03), 189-206.

Eilouti, B (2022) Form follows users: a framework for system-based design. Architectural Engineering and Design Management, 18(03), 204–25.

Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: a grounded theory study. International Journal of Construction Education and Research, 18(03), 270–92.

Henjewele, C, Fewings, P and Rwelamila, P D (2013) De-marginalising the public in PPP projects through multi-stakeholders management. Journal of Financial Management of Property and Construction, 18(03), 210-31.

Hooper, A and Nicol, C (2000) Design practice and volume production in speculative housebuilding. Construction Management and Economics, 18(03), 295-310.

I., B S, L., S R and Ramulu, P J (2019) Surface development by reinforcing nano-composites during friction stir processing – a review. Journal of Engineering, Design and Technology , 18(03), 653–87.

Ilhan, B and Yaman, H (2011) A comparative input-output analysis of the construction sector in Turkey and EU countries. Engineering, Construction and Architectural Management, 18(03), 248–65.

Ismail, S, Che Ibrahim, C K I, Belayutham, S and Mohammad, M Z (2022) Analysis of attributes critical to the designer’s prevention through design competence in construction: the case of Malaysia. Architectural Engineering and Design Management, 18(03), 325–43.

Jiang, Q (2019) Estimation of construction project building cost by back-propagation neural network. Journal of Engineering, Design and Technology , 18(03), 601–9.

Kamal, E M, Lou, E C, Yusof, N and Osmadi, A (2022) Absorptive capacity of Malaysian SME construction organisations. Architectural Engineering and Design Management, 18(03), 313–24.

Khan, M R and Sonawane, A (2019) Prediction of impact response in construction safety helmet using FEA. Journal of Engineering, Design and Technology , 18(03), 557–66.

Lai, L W C (2000) The Coasian market-firm dichotomy and sub-contracting in the construction industry. Construction Management and Economics, 18(03), 355-62.

Laovisutthichai, V, Lu, W and Bao, Z (2022) Design for construction waste minimization: guidelines and practice. Architectural Engineering and Design Management, 18(03), 279–98.

Leistner, S, Honold, C, Maierhofer, M, Haase, W, Blandini, L, Sobek, W, Roth, D, Binz, H and Menges, A (2022) Research on integral design and planning processes for adaptive buildings. Architectural Engineering and Design Management, 18(03), 241–60.

Leung, M-y, Chan, Y S I and Dongyu, C (2011) Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Engineering, Construction and Architectural Management, 18(03), 312–28.

Lin, D J, Yu, W D, Wu, C M and Cheng, T M (2018) Correlation between intellectual capital and business performance of construction industry: an empirical study in Taiwan. International Journal of Construction Management, 18(03), 232-46.

Livesey, P, V and Runeson, G (2018) Autoethnography and Theory Testing . Construction Economics and Building, 18(03), 40-54.

Loganathan, S, Forsythe, P and Kalidindi, s, N (2018) Work practices of onsite construction crews and their influence on productivity . Construction Economics and Building, 18(03), 18-39.

Love, P E D, Li, H, Irani, Z and Faniran, O (2000) Total quality management and the learning organization: a dialogue for change in construction. Construction Management and Economics, 18(03), 321-31.

Malhotra, M, Sahu, V, Srivastava, A and Misra, A K (2019) Experimental and numerical investigation of the effect of pre-existing utility tunnel on the bearing capacity of shallow footing in sandy soils. Journal of Engineering, Design and Technology , 18(03), 513–29.

Mba,M, F, BG and Agumba, J , N (2018) Critical success factors influencing performance outcome of joint venture construction projects in South Africa: Comparison of first and second order models . Construction Economics and Building, 18(03), 74-94.

Mediastika, C E, Sudarsono, A S and Kristanto, L (2022) Indonesian shopping malls: a soundscape appraisal by sighted and visually impaired people. Architectural Engineering and Design Management, 18(03), 184–203.

Mitchell, A, Frame, I, Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(03), 297–311.

Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(03), 266–81.

Ofori, G (2000) Globalization and construction industry development: research opportunities. Construction Management and Economics, 18(03), 257-62.

Ogwueleka, A C and Udoudoh, F P (2018) The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(03), 247-59.

Onubi, H O, Yusof, N and Hassan, A S (2019) Adopting green construction practices: health and safety implications. Journal of Engineering, Design and Technology , 18(03), 635–52.

Osei-Kyei, R and Chan, A P (2018) Evaluating the project success index of public-private partnership projects in Hong Kong. Construction Innovation, 18(03), 371–91.

Ozdogan, I D and Birgonul, M T (2000) A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects. Construction Management and Economics, 18(03), 343-53.

Ozumba, A O U and Shakantu, W (2018) Exploring challenges to ICT utilisation in construction site management. Construction Innovation, 18(03), 321–49.

Pathuri, R T, Killingsworth, J and Mehany, M S H M (2022) Knowledge, Skills, and Abilities for Senior-Level Construction Managers: A U.S. Industry-Based Delphi Study. International Journal of Construction Education and Research, 18(03), 234–50.

Perera, B A K S, Perera, C and Jayalath, C (2022) Contractor’s Perspective on Key Performance Indicators of Cost Control in Asian, Middle Eastern, and European Construction Projects. International Journal of Construction Education and Research, 18(03), 217–33.

Rogers, M (2000) Using Electre III to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(03), 333-42.

Sahu, V, Attri, R, Gupta, P and Yadav, R (2019) Development of eco friendly brick using water treatment plant sludge and processed tea waste. Journal of Engineering, Design and Technology , 18(03), 727–38.

Santoso, D S and Gallage, P G M P (2019) Critical factors affecting the performance of large construction projects in developing countries. Journal of Engineering, Design and Technology , 18(03), 531–56.

Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(03), 207-20.

Slaughter, E S and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(03), 269-80.

Smith, W N, Smith, J and Bingham, E D (2022) Current State of Practice Associated with the Use of Building Information Modeling (BIM) in the Custom Home Building Industry. International Journal of Construction Education and Research, 18(03), 251–69.

Somiah, M K, Aigbavboa, C and Thwala, W D (2022) Principal Component Analysis of Constraints to the Development of Local Content Law for the Ghanaian Construction Industry: Stakeholders’ Perspective. International Journal of Construction Education and Research, 18(03), 201–16.

Sutrisna, M, Ramnauth, V and Zaman, A (2022) Towards adopting off-site construction in housing sectors as a potential source of competitive advantage for builders. Architectural Engineering and Design Management, 18(03), 165–83.

Tan, Y, Shen, L-Y and Langston, C (2011) A fuzzy approach for assessing contractors' competitiveness. Engineering, Construction and Architectural Management, 18(03), 234–47.

Tavakolan, M and Mohammadi, A (2018) Risk management workshop application: A case study of Ahwaz Urban Railway project. International Journal of Construction Management, 18(03), 260-74.

Tighnavard Balasbaneh, A, Bin Marsono, A K and Kasra Kermanshahi, E (2018) Balancing of life cycle carbon and cost appraisal on alternative wall and roof design verification for residential building. Construction Innovation, 18(03), 274–300.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(03), 363-72.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(03), 311-20.

Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering. Construction Innovation, 18(03), 350–70.

Yap, J B H and Cheah, S Y (2019) Key challenges faced by Chinese contractors in Malaysian construction industry. Journal of Engineering, Design and Technology , 18(03), 705–26.

Yusof, N, A, Ishak, S, S, M and Doheim, R (2018) Identifying factors for incorporating spatial data into BIM using the Delphi method . Construction Economics and Building, 18(03), 1-17.

Zhou, L, Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(03), 232-50.