ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 70 results ...

Adegun, O B (2023) Climatic disasters within a flood-prone coastal slum in Lagos: coping capacities and adaptation prospects. International Journal of Disaster Resilience in the Built Environment, 14(02), 212-28.

Aje, O I, Odusami, K T and Ogunsemi, D R (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(02), 171–87.

Alaghbari, M W, Kadir, R A and Salim, E A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(02), 192–206.

Aliu, J, Oke, A E, Abayomi, T, Aigbavboa, C and Makanjuola, S (2024) Exploring the critical success factors for adopting gamification in the Nigerian construction sector. Built Environment Project and Asset Management, 14(02), 184-200.

Balamir, M (2023) The “disaster cycle” (DC) and actors in disaster management. International Journal of Disaster Resilience in the Built Environment, 14(02), 185-92.

Bashouri, J and William, D G (2014) A model for sharing knowledge in architectural firms. Construction Innovation, 14(02), 168-85.

Bazen, E (2014) Effect of the Building Act 2011 on compliance costs in Western Australia. Construction Economics and Building, 14(02), 41-56.

Bulsara, M A, Hingu, A D and Vaghasiya, P S (2016) Energy loss due to unbalance in rotor–shaft system. Journal of Engineering, Design and Technology, 14(02), 277-85.

Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(02), 175-82.

Chen, Y, Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(02), 186-209.

Dow, I, Sertyesilisik, B and Ross, A D (2009) An investigation on the cost implications of methodology of sub-contract work pricing. Journal of Financial Management of Property and Construction, 14(02), 98–125.

El Debs, L C, Brunese, P S and Shaurette, M (2018) Use of concept maps to illustrate barriers to construction industry inter-organizational communication: A comparative view from students and professionals. International Journal of Construction Education and Research, 14(02), 77-94.

El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the Middle East. International Journal of Construction Education and Research, 14(02), 118-40.

Enshassi, A, Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(02), 126–51.

Fernando, M H V, Costa, D D, Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(02), 244-59.

Finch, E F, Flanagan, R and Marsh, L (1996) Auto-ID application in construction. Construction Management and Economics, 14(02), 121-9.

Glass, J and Simmonds, M (2007) “Considerate construction”: case studies of current practice. Engineering, Construction and Architectural Management, 14(02), 131–49.

Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(02), 155-64.

Hallal, I and Sahnoune, T (2023) Urban mix in housing neighbourhoods: challenges, evaluation method and diagnosis of Ayouf in Jijel, Algeria. International Journal of Disaster Resilience in the Built Environment, 14(02), 229-48.

Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(02), 373-419.

Huang, J-Y and Siao, S-T (2016) Development of an integrated bionic design system. Journal of Engineering, Design and Technology, 14(02), 310-27.

Huang, W, Xu, J, Zhu, D, Liu, C, Lu, J and Lu, K (2016) Multi-objective optimization of composite two-stage vibration isolation system for sensitive equipment. Journal of Engineering, Design and Technology, 14(02), 343-61.

Hughes, R and Thorpe, D (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(02), 210-28.

Ikediashi, D I and Ogwueleka, A C (2016) Assessing the use of ICT systems and their impact on construction project performance in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(02), 252-76.

Jaafar, M, Nuruddin, A and Abu Bakar, S P (2014) Business success and psychological traits of housing developers. Construction Economics and Building, 14(02), 57-72.

Jaafar, M, Ramayah, T, Abdul-Aziz, A-R and Saad, B (2007) Technology readiness among managers of Malaysian construction firms. Engineering, Construction and Architectural Management, 14(02), 180–91.

Jiang, H and Liu, C (2014) Spatial linkages among Australian construction markets. Construction Economics and Building, 14(02), 18-30.

Jiang, H, Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(02), 101-12.

Kakitahi, J M, Alinaitwe, H M, Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(02), 238-51.

Kaur, P, Ritu, R K and Kaur, A (2024) Unraveling consumer behavioral intentions to adopt solar water heaters in India using UTAUT model. Built Environment Project and Asset Management, 14(02), 312-28.

Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(02), 90-100.

Ke, Y, Zhao, X, Wang, Y and Wang, S (2009) SWOT analysis of domestic private enterprises in developing infrastructure projects in China. Journal of Financial Management of Property and Construction, 14(02), 152–70.

Kometa, S T, Olomolaiye, P O and Harris, F C (1996) Validation of the model for evaluating client-generated risk by project consultants. Construction Management and Economics, 14(02), 131-45.

Laitinen, K, Luhtala, M, Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: capability maturity model integration approach. Built Environment Project and Asset Management, 14(02), 201-27.

Lambropoulos, J, Manolopoulos, N and Pantouvakis, J P (1996) SEMANTIC: smart earth moving analysis and estimation of cost. Construction Management and Economics, 14(02), 79-92.

Lê, M A T and Brønn, C (2007) Linking experience and learning: application to multi-project building environments. Engineering, Construction and Architectural Management, 14(02), 150–63.

Lebunu Hewage, U W A, Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(02), 296-311.

Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: a case study of Vietnam. Construction Economics and Building, 14(02), 73-86.

MacSporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(02), 103-19.

Madhlopa, A (2016) Effect of controlling airflow in a solar chimney on thermal load in a built environment. Journal of Engineering, Design and Technology, 14(02), 286-309.

Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(02), 229-44.

Moradpour, N, Pourahmad, A, Hataminejad, H, Ziari, K and Sharifi, A (2023) An overview of the state of urban resilience in Iran. International Journal of Disaster Resilience in the Built Environment, 14(02), 154-84.

Nguyen, T, Chileshe, N, Ho, D T, Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: a typical case study of Vietnam. Built Environment Project and Asset Management, 14(02), 278-95.

Oyewobi, L O, Abiola-Falemu, O and Ibironke, O T (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology, 14(02), 214-37.

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: the impact on readability. Construction Economics and Building, 14(02), 31-40.

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(02), 165-74.

Saad, A M, Dulaimi, M, Arogundade, S, Zulu, S L and Gorse, C (2024) Modern methods of construction (MMC) and innovation negativism in the UK public sector. Built Environment Project and Asset Management, 14(02), 147-63.

Sadeghi, J, Oghabi, M, Sarvari, H, Sabeti, M S, Kashefi, H, Chan, D W M and Lotfata, A (2023) A hybrid risk assessment approach for assessing the earthquake risks in worn-out urban fabrics: a case study in Iran. International Journal of Disaster Resilience in the Built Environment, 14(02), 193-211.

Safougne Djomekui, B L and Yemmafouo, A (2023) Population resilience to flooding in the urbanised mangrove of Douala, Cameroon. International Journal of Disaster Resilience in the Built Environment, 14(02), 135-53.

Shafabakhsh, G A, Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by LED and FE method. Journal of Engineering, Design and Technology, 14(02), 362-72.

Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(02), 93-101.

Siew, R Y J (2014) Human resource management in the construction industry – Sustainability competencies. Construction Economics and Building, 14(02), 87-103.

Singh, A K and Kumar, V R P (2024) Analyzing the barriers for blockchain-enabled BIM adoption in facility management using best-worst method approach. Built Environment Project and Asset Management, 14(02), 164-83.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(02), 147-54.

Sruthilaya, D, Vilventhan, A and Gopal, P R C (2024) Analysis of project complexity factors and their interdependencies in metro rail projects. Built Environment Project and Asset Management, 14(02), 260-77.

Stringfellow, P (2014) Construction contractors’ involvement in disaster management planning. Construction Economics and Building, 14(02), 120-132.

Sunding, L and Ekholm, A (2014) Problems and problem attention in the construction sector – understanding the influence of human factors. Construction Economics and Building, 14(02), 1-17.

Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(02), 164–79.

Sutton, K, Williams, A, Tremain, D and Kilgour, P (2016) University entry score: Is it a consideration for spatial performance in architecture design students?. Journal of Engineering, Design and Technology, 14(02), 328-42.

Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.

Sweis, R J, Al Sharef, R, Jandali, D, Obeidat, B Y and Andrawes, N (2018) The relationship between project team members' effectiveness and acknowledgment of talent: Team members' perspective. International Journal of Construction Education and Research, 14(02), 141-60.

Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(02), 95-117.

Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(02), 113-21.

Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.

Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.

Turkan, Y, Bosché, F, Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(02), 145-67.

Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(02), 228-43.

Yao, H and Hao, J L (2014) Simulation model for identifying effective policy in mitigating noise emissions from highway projects. International Journal of Construction Management, 14(02), 67-77.

Yusuf, G A and Mohamed, S F (2014) Perceived benefits of adopting a standard–based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(02), 104-119.

Zeng, S, Chung, F and Ashuri, B (2024) Forecasting Right-of-Way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(02), 129-46.