ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 21 results ...
Abreu, M M d and Lordsleem Jr, A C (2019) Aluminum formwork system: loss and productivity. Built Environment Project and Asset Management, 9(05), 616–27.
Arditi, D and Gutierrez, A E (1991) Performance of US contractors in foreign markets. Construction Management and Economics, 9(05), 431-49.
Assaf, S, Hassanain, M A, Abdallah, A, Sayed, A M and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(05), 597–615.
Blay, K B, Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(05), 581–96.
Cox, A and Ireland, P (2002) Managing construction supply chains: the common sense approach. Engineering, Construction and Architectural Management, 9(05), 409–18.
Fo, S, Marsh, x and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(05), 378–87.
Formoso, C T, Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(05), 419–32.
Ismail, S, Musawa, M S and Ahmad, H (2019) Transparency of public private partnership (PPP): the extent of mandatory information disclosure. Built Environment Project and Asset Management, 9(05), 655–68.
Juan, C and Olmos, F (2019) Public–private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(05), 669–82.
Kwofie, T E, Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(05), 628–41.
Lim, E H and Ling, F Y Y (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(05), 388–95.
Medimagh, S and Triki, A (2019) The PPP performance based on the co-creation with customers. Built Environment Project and Asset Management, 9(05), 642–54.
Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: some false benefits and inherent drawbacks. Construction Management and Economics, 9(05), 481-92.
Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: a deterministic analysis. Construction Management and Economics, 9(05), 467-79.
Skitmore, M R (1991) The construction contract bidder homogeneity assumption: an empirical test. Construction Management and Economics, 9(05), 403-29.
Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: the impact of client performance. Engineering, Construction and Architectural Management, 9(05), 453–65.
Stephenson, P, Morrey, I, Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(05), 396–408.
Tam, C M, Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(05).
Uwakweh, B O and Maloney, W F (1991) Conceptual model for manpower planning for the construction industry in developing countries. Construction Management and Economics, 9(05), 451-65.
Whyte, J, Bouchlaghem, D and Thorpe, A (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(05), 371–7.
Zhang, H, Shi, J J and Tam, C-M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(05), 433–45.