ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 75 results ...
Adams, J D and Brown, A W (2002) Project management in public sector construction projects: assessing value for money. Journal of Construction Procurement, 8(02), 84–100.
Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(02), 117–32.
Arditi, D, Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(02), 90–103.
Arensman, D B and Ozbek, M E (2012) Building Information Modeling and Potential Legal Issues. International Journal of Construction Education and Research, 8(02), 146-56.
Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(02), 215–30.
Barari, A, Ganjavi, B, Jeloudar, M G and Domairry, G (2010) Assessment of two analytical methods in solving the linear and nonlinear elastic beam deformation problems. Journal of Engineering, Design and Technology, 8(02), 127–45.
Bensalah, M, Elouadi, A and Mharzi, H (2019) Overview: the opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(02), 103–16.
Bond, S and Dermisi, S (2017) Using GIS to measure the impact of the Canterbury earthquakes on house prices in Christchurch, NZ. International Journal of Disaster Resilience in the Built Environment, 8(02), 123-38.
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration I: principles. Engineering, Construction and Architectural Management, 8(02), 104–13.
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration II: application. Engineering, Construction and Architectural Management, 8(02), 114–29.
Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(02), 205-18.
Carrasco, S, Ochiai, C and Okazaki, K (2017) Residential satisfaction and housing modifications: A study in disaster-induced resettlement sites in Cagayan de Oro, Philippines. International Journal of Disaster Resilience in the Built Environment, 8(02), 175-89.
Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement?. International Journal of Law in the Built Environment, 8(02), 161-75.
Chen, G, Zhang, G, Xie, Y-M and Jin, X-H (2012) Overview of alliancing research and practice in the construction industry. Architectural Engineering and Design Management, 8(02), 103-19.
Chileshe, N and Haupt, T C (2010) An empirical analysis of factors impacting career decisions in South African construction industry: Male and female high school students' perspectives. Journal of Engineering, Design and Technology, 8(02), 221–39.
Clevenger, C, Glick, S and del Puerto, C L (2012) Interoperable Learning Leveraging Building Information Modeling (BIM) in Construction Education. International Journal of Construction Education and Research, 8(02), 101-18.
Dale, A, Gonzales, C and Himangshu, P (2003) Financing of private infrastructure investments in the emerging markets of southeast Asia. Journal of Financial Management of Property and Construction, 8(02), 61–78.
Ekström, M A and Bjornsson, H C (2002) Trust building tools supporting electronic bidding in construction. Journal of Construction Procurement, 8(02), 133–47.
Elhami, K N and Garlock, M E M (2017) Overview of fire following earthquake: historical events and community responses. International Journal of Disaster Resilience in the Built Environment, 8(02), 158-74.
Ewin, N A, Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(02), 109-33.
Fasakin, J O and Ogunsemi, D R (2003) Modelling the selling prices of residential buildings in Nigeria. Journal of Financial Management of Property and Construction, 8(02), 111–4.
Gregory-Stevens, J, Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(02), 123-36.
Hammad, A, Akbarnezhad, A, Grzybowska, H, Wu, P and Wang, X (2019) Mathematical optimisation of location and design of windows by considering energy performance, lighting and privacy of buildings. Smart and Sustainable Built Environment, 8(02), 117–37.
Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: an introduction to the problem. Engineering, Construction and Architectural Management, 8(02), 80–9.
Ilter, D, Cakmak, P I, Ustuner, Y A and Tas, E (2016) Toward a research roadmap for construction mediation. International Journal of Law in the Built Environment, 8(02), 176-90.
Imbert, I D C (1990) Human issues affecting construction in developing countries. Construction Management and Economics, 8(02), 219-28.
Irani, Z (2008) Information systems evaluation: what does it mean?. Construction Innovation, 8(02), 88–91.
Irizarry, J, Meadati, P, Barham, W S and Akhnoukh, A (2012) Exploring Applications of Building Information Modeling for Enhancing Visualization and Information Access in Engineering and Construction Education Environments. International Journal of Construction Education and Research, 8(02), 119-45.
Isa, R, Emuze, F, Das, D and Awuzie, B O (2018) Modeling a transformational route to infrastructure sustainability in South Africa. Built Environment Project and Asset Management, 8(02), 147–59.
Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(02), 158–67.
Joannides, M M, Olbina, S and Issa, R R A (2012) Implementation of Building Information Modeling into Accredited Programs in Architecture and Construction Education. International Journal of Construction Education and Research, 8(02), 83-100.
Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(02), 135-46.
Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(02), 101–16.
Kiatake, M and Petreche, J R D (2012) A case study on the application of the theory of inventive problem solving in architecture. Architectural Engineering and Design Management, 8(02), 90-102.
Kishk, M, Al-Hajj, A, Pollock, R and Aouad, G F (2003) Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(02), 89–98.
Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(02), 99–110.
Kornakova, M and March, A (2017) The role of citizens in DRR planning exercises: when to inform or consult. International Journal of Disaster Resilience in the Built Environment, 8(02), 209-22.
Lam, K C, Hu, T, Cheung, S O, Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(02), 130–44.
Lian, J K and Ling, F Y (2018) The influence of personal characteristics on quantity surveyors’ job satisfaction. Built Environment Project and Asset Management, 8(02), 183–93.
Liu, Y, Zhao, J, Dimitrov, V, Irish, A, Jones, C, Kirk, S, Thomas, J and Welter, D (2010) An entertaining robot prototype for pets. Journal of Engineering, Design and Technology, 8(02), 189–205.
Lowe, D (2003) The development of early stage design cost estimating expertise: effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(02), 79–88.
Mak, S W K, Choy, L H T and Ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(02), 92–105.
Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(02), 191-204.
Mandal, S (2017) An empirical competence-capability model of supply chain resilience. International Journal of Disaster Resilience in the Built Environment, 8(02), 190-208.
McCoy, A P, Thabet, W and Badinelli, R (2008) Towards establishing a domain specific commercialization model for innovation in residential construction. Construction Innovation, 8(02), 137–55.
Motawa, I and Kaka, A (2008) Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(02), 1-10.
Nani, G, Edwards, P, Adjei-Kumi, T, Badu, E and Amoah, P (2008) Customisation and desirable characteristics of a standard method of measurement for building works in Ghana. Construction Economics and Building, 8(02), 30-40.
Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(02), 106–19.
Ng, T, Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO9000-based quality management systems to construction contractors. Construction Economics and Building, 8(02), 23-29.
Nzekwe-Excel, C, Nwagboso, C, Georgakis, P and Proverbs, D (2010) Integrated framework for satisfaction assessment in construction sector. Journal of Engineering, Design and Technology, 8(02), 168–88.
Ofori, G and Gang, G (2001) ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(02), 145–57.
Ohueri, C C, Enegbuma, W I and Kenley, R (2018) Energy efficiency practices for Malaysian green office building occupants. Built Environment Project and Asset Management, 8(02), 134–46.
Ojolo, S J, Damisa, O, Orisaleye, J I and Ogbonnaya, C (2010) Design and development of cashew nut shelling machine. Journal of Engineering, Design and Technology, 8(02), 146–57.
Pusceddu, C, Blumberg, G, Salvalai, G and Imperadori, M (2017) The use of building technology to support disaster resilience: the case study of air shelter house. International Journal of Disaster Resilience in the Built Environment, 8(02), 139-57.
Randeree, K and Ahmed, N (2019) The social imperative in sustainable urban development. Smart and Sustainable Built Environment, 8(02), 138–49.
Rani, S P J V and Prabha, K A (2010) Stochastic logic computation based RBFNN with adaptive hidden layer structure. Journal of Engineering, Design and Technology, 8(02), 206–20.
Rashid, K B A (2002) An assessment on the systems of registration of contracting firms in Malaysia. Journal of Construction Procurement, 8(02), 148–59.
Rekola, M, M (2012) The role of design management in the sustainable building process. Architectural Engineering and Design Management, 8(02), 78-89.
Saeed, A M, Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(02), 194–214.
Salvado, F, Almeida, N M d and Vale e Azevedo, A (2018) Toward improved LCC-informed decisions in building management. Built Environment Project and Asset Management, 8(02), 114–33.
Shahandashti, M, Ashuri, B and Mostaan, K (2018) Automatic fault detection for Building Integrated Photovoltaic (BIPV) systems using time series methods. Built Environment Project and Asset Management, 8(02), 160–70.
Shakantu, W, Muya, M, Tookey, J and Bowen, P (2008) Evaluating truck empty running in construction: a case study from Cape Town, South Africa. Construction Economics and Building, 8(02), 41-49.
Shields, T J, Silcock, G W and Donegan, H A (1990) Towards the development of a fire safety systems evaluation for public assembly buildings. Construction Management and Economics, 8(02), 147-58.
Sidwell, A C (1990) Project management: dynamics and performance. Construction Management and Economics, 8(02), 159-79.
Smits, M W M (2019) A quasi-experimental method for testing rural design support within a DRM framework. Smart and Sustainable Built Environment, 8(02), 150–87.
Su, Y-S (2017) Rebuild, retreat or resilience: urban flood vulnerability analysis and simulation in Taipei. International Journal of Disaster Resilience in the Built Environment, 8(02), 110-22.
Succar, B, Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(02), 120-42.
Sundqvist, J (2008) From focus on price to the pyramid of innovation, information, cooperation, value and trust: a success story of five Swedish building material manufacturers. Construction Economics and Building, 8(02), 11-2.
Tam, C-M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(02), 120–36.
Trushell, I, Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(02), 101-22.
Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(02), 171–82.
Wall, R, Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(02), 137-60.
Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(02), 179-90.
Wasif, I, Josephson, P-E and Styhre, A (2008) Individual learning in construction projects: professions and their approaches. Construction Economics and Building, 8(02), 50-60.
Zou, P X W and Couani, P (2012) Managing risks in green building supply chain. Architectural Engineering and Design Management, 8(02), 143-58.