ARCOM Conference Paper Abstracts Database:
Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Acharya, N K, Lee, Y D and Im, H M (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(06), 543–66.

Aniekwu, A N (1995) The business environment of the construction industry in Nigeria. Construction Management and Economics, 13(06), 445-55.

Anumba, C E H, Dainty, A, Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(06), 616–33.

Badi, S and Diamantidou, D (2017) A social network perspective of building information modelling in Greek construction projects. Architectural Engineering and Design Management, 13(06), 406–22.

Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(06), 467-73.

Cheng, J, Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(06), 567–83.

Edwards, P J and Edwards, M (1995) A price-rationalized approach to item separation in the measurement of concrete work. Construction Management and Economics, 13(06), 485-91.

Emmitt, S (2017) Editorial. Architectural Engineering and Design Management, 13(06), 405.

Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(06), 493-500.

Galaitsi, S E, Rand, K, Yeates, E, Talbot, C, O'Donnell, A, Pinigina, E and Linkov, I (2023) Stakeholder collaboration in the forecast-informed reservoir operations (FIRO) pilot project at Lake Mendocino, California. Built Environment Project and Asset Management, 13(06), 880-95.

Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(06), 423–38.

Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(06), 846-61.

Kalantari, S, Shepley, M M, Rybkowski, Z K and Bryant, J (2017) Designing for operational efficiency: facility managers’ perspectives on how their knowledge can be better incorporated during design. Architectural Engineering and Design Management, 13(06), 457–78.

Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(06), 634–44.

Knotten, V, Lædre, O and Hansen, G K (2017) Building design management – key success factors. Architectural Engineering and Design Management, 13(06), 479–93.

Lam, T Y M and Gale, K S (2023) A performance-driving model for public-sector construction framework procurement in England. Built Environment Project and Asset Management, 13(06), 781-98.

Mustapha, F, Al-Abed, A and Wild, S (1995) A model for assessing the effectiveness of public housing in Sana'a (Republic of Yemen). Construction Management and Economics, 13(06), 457-65.

Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(06), 501-10.

Nibbelink, J, Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective. Architectural Engineering and Design Management, 13(06), 439–56.

Oke, A E, Aliu, J, Fadamiro, P, Leo-Olagbaye, F, Jamir Singh, P S and Samsurijan, M S (2023) Evaluating the drivers for the implementation of automation techniques in the Nigerian construction sector. Built Environment Project and Asset Management, 13(06), 913-28.

Oke, A E, Aliu, J, Mwanaumo, E M M, Abayomi, T and Kahanji, C (2023) Leveraging gamification to enhance productivity and employee engagement in the Nigerian construction industry. Built Environment Project and Asset Management, 13(06), 813-29.

Olatunji, O A and Ramanayaka, C E D (2023) Client attributes that motivate contractors' bid decision. Built Environment Project and Asset Management, 13(06), 799-812.

Osuizugbo, I C, Aina, O O and Onokwai, A O (2023) Roles of clients in buildability improvement in Nigeria: an exploratory factor analysis. Built Environment Project and Asset Management, 13(06), 862-79.

Sami Ur Rehman, M, Shafiq, M T, Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(06), 830-45.

Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(06), 600–15.

Seymour, D E and Rooke, J D (1995) The culture of the industry and the culture of research. Construction Management and Economics, 13(06), 511-23.

Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(06), 584–99.

Worrall, H, Norman, G and Flanagan, R (1995) Intervention analysis and overseas trade in UK construction-related materials and components. Construction Management and Economics, 13(06), 475-84.

Zulu, S L, Saad, A, Ajayi, S and Unuigbe, M (2023) Determinants of an effective digital transformation in construction organisations: a qualitative investigation. Built Environment Project and Asset Management, 13(06), 896-912.